| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical All documents are submitted as per NIT |
| 2 | Accepted-Technical | Accepted-Technical All documents are submitted as per NIT |
| 3 | Accepted-Technical C 145 1 S F TAYYAB LANE SHAHEEN BAGH JAMIA NAGAR OKHLA NEW DELHI 110025 | SOUTH EAST DELHI | DELHI | 110025 | Accepted-Technical All documents are submitted as per NIT |
| 4 | Accepted-Technical PLOT NO 764 1 RR RESIDENCY 2ND FLOOR RR RESIDENCY ZENAS SCHOOL ROAD DEAD END MATRUSRI NAGAR MIYAPUR HYDERABAD 500049 | HYDERABAD | HYDERABAD | TELANGANA | 500049 | Accepted-Technical All documents are submitted as per NIT |
| 5 | Accepted-Technical | Accepted-Technical All documents are submitted as per NIT |
Tender Value
₹79.8 L
EMD Value
₹1.6 L
Closing Date
9 Feb 2026, 3:00 pmClosed
AGM CE
FCI RO Hyderabad
ARMO works at FSD Dichpally for the year 2025-26.S.H Repairs to Compound Wall
2026_FCI_895597_1
Engg/23/2025-26 dt. 24.01.2026.2026
Open Tender
Civil Works
120 days
FSD Dichpally
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.6 L
13 Feb 2026
24 Jan 2026
10 Feb 2026
24 Jan 2026
9 Feb 2026
24 Jan 2026
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches
Providing and laying in position cement concrete of specified grade - All work up to plinth level :1:4:8
Providing and laying in position specified grade of reinforced cement concrete - All work up to plinth level : 1:1.5:3
Reinforced cement concrete work in walls (any thickness), including attached pilasters and buttresses
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15°
Providing and laying cement concrete in retaining walls, return walls - 1:1½:3
Centering and shuttering - Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering - Walls (any thickness) including attached pilasters
Centering and shuttering - Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering - Lintels, beams, plinth beams, girders and cantilevers
Centering and shuttering - Retaining walls, return walls including pilasters and buttresses
Edges of slabs and breaks in floors and walls 5.9.16.1 Under 20 cm wide
Steel reinforcement for R.C.C. work up to plinth level : Cold twisted Bars
Steel reinforcement for R.C.C. work above plinth level : Cold twisted Bars
Providing and laying autoclaved aerated cement blocks masonry with 100 mm thick AAC blocks
Supplying at site Angle iron post & strut of required size
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia
Painting with synthetic enamel paint of approved brand and manufacture
6 mm cement plaster of mix : 1:3 (1 cement: 3 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade : New work
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations
Clearing jungle including uprooting of rank vegetation, grass, brushwood, trees and saplings
Demolishing brick work manually/ by mechanical means - In cement mortar
Demolishing stone rubble masonry manually/ by mechanical means - In cement mortar
Demolishing cement concrete manually/ by mechanical means - 1:4:8 or leaner mix
Disposal of building rubbish / malba / similar unserviceable, dismantled materials
Please Enable Macros to View BoQ information
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
DNIT.pdf
Tender Documents • 1.51 MB
BOQ_941341.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid