| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 CrAccepted-Finance 40 SAPTHAGIRI COLONY JAFFERKHANPET CHENNAI 600 083 | CHENNAI | CHENNAI | TAMIL NADU | 600083 | ₹4.8 Cr | L1 | Accepted-Finance Generally in order |
| 2 | Rejected-Technical FLAT NO G 406 HANSA COURTYARD THIRUVOTTIYUR CHENNAI 600 019 | CHENNAI | TAMIL NADU | 600019 | - | - | Rejected-Technical BQR condition not satisfied |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Chennai Radha Engineering Works (P) Ltd. L1 |
|---|---|---|---|---|
| 1.00 | MechanicalCircle Pre-Commisioning activities for Boiler : Charges for provision of safety officer assisting safety persons during Pre Commissioning Activities and condition monitoring of equipments in Boiler, Turbine and BOP areas. | 120 | days | 2,97,720 ₹3,51,309.6 Lowest |
| 2.00 | Charges for assisting Pre Commissioning Activities and condition monitoring of equipments in Boiler, First Pass, Extended Pass, Back Pass, Startup System, HWL valve 1 & 2 , MECCV skid, Boiler Circulating Pump, LP Condensate pumps, Separators, Soot Blowers, Wall blowers, Wind Box, Burner registers, Burner oil skids & oil guns, H SOFA & L SOFA registers, Emergency cooling water tank and connected pumps and valves, Spray station, Soot blower Station, Scanner air fans, Oil station in the boiler area, all Motor / hand operated valves etc, including PRDS floor station. | 120 | days | 14,44,560 ₹17,04,580.8 Lowest |
| 3.00 | Charges for assisting Pre Commissioning Activities and condition monitoring of equipments in Air pre Heaters, ESP, ID, FD, PA fans and connected ducts, Gates & Dampers etc. | 120 | days | 14,44,560 ₹17,04,580.8 Lowest |
| 4.00 | Pre-Commisioning activities for Turbine and auxiliaries: Charges for assisting Pre Commissioning Activities and condition monitoring of Turbine and its auxiliaries such as HP, IP, LP1 & LP 2 Turbines, along with its Bearing pedestal & auxiliaries, HP/LP Heaters, HP/LP Flash tanks, Flash Boxes, EOT Cranes-4 no’s, Main Lube oil system (MOT), HPSU(Governing oil system), Motor Driven / Steam Driven Boiler feed pumps & Booster pumps with lube oil system and its accessories , HP/LP Bypass system, Overload Valves, Debris Filter System, Condenser online tube cleaning system, Condensers 1 & 2 with its accessories, Condensate Extraction pumps A, B & C, Condensate Polishing unit Vessel and Regeneration areas , Drip Pumps, Air Evacuation system including Vacuum pumps , Both SG & TG DMCW system with its accessories, ACW Selfcleaning strainers, Dozing system (Ammonia, Hydrazine & NaOH ), Central Lube oil Purification unit with DOT,COT, Centrifuges for MOT, TDBFP A & B and CLOPS , Air receiver tanks, and misc. Pumps and associated equipments, etc., checking the oil levels and topping up the oil whenever required and attending the gland leaks for pumps and valves as directed by the Engineer- in-charge including T&Ps, consumables, crane charges etc., | 120 | days | 21,09,240 ₹24,88,903.2 Lowest |
| 5.00 | SWIPH and SWOPH System: Providing round the clock essential monitoring of activities, during the commissioning of Sea Water Intake System and sea water outfall system and associated equipments, in sequence as per the operational procedures and also Monitoring & taking readings at local for entire system and carryout minor repair works, general cleaning, checking the oil levels and topping up the oil whenever required and attending the gland leaks for pumps and valves etc., as per the instructions of Engineer-in-charge including T&Ps, consumables, crane charges etc., | 120 | days | 18,53,760 ₹21,87,436.8 Lowest |
| 6.00 | Plant Water System : Providing round the clock essential monitoring of activities, during the commissioning of Plant Water System (which includes Charges for Providing round the clock essential monitoring of activities, during the commissioning of Plant Water System (which includes Pre Treatment Plant,Clarifier System,Pressure Sand Filters (PSF),Pressurized Ultra-Filtration (UF) System, Sea Water Reverse Osmosis system (SWRO) Brackish Water Reverse Osmosis system (BWRO),Membrane Cleaning & protection system, degasser system, DM system (MB), Remineralization system, valves and piping system), Waste water pump house, DM water Pump house, Sludge water pump house, Remin pump house, Makeup water pump house, Electrochlorination plant, ETP system, CPU Regeneration Plant, Neutralization pit, filter water Pump House, checking the oil levels and topping up the oil whenever required and attending the gland leaks for pumps and valves, Control room HVAC, all storage tanks and etc., in sequence as per the operational procedures / as per the instructions of TNPGCL Engineers and also Monitoring & taking readings at local for entire system and carryout minor repair works, general cleaning etc., as per the instructions of Engineer-in-charge including T&Ps, consumables, crane charges etc., | 120 | days | 21,09,240 ₹24,88,903.2 Lowest |
| 7.00 | CWPH System Providing round the clock essential monitoring of activities, during the commissioning of Cooling Water Pump House System including cooling water pumps, ACW pumps, blowdown pumps etc., and sludge transfer pumps and other associated equipments in NDCT in sequence as per the operational procedures and also taking readings at local for entire system and carryout minor repair works, general cleaning etc., checking the oil levels and topping up the oil whenever required and attending the gland leaks for pumps and valves as per the instructions of Engineer-in-charge including T&Ps, consumables, crane charges etc., | 120 | days | 14,44,560 ₹17,04,580.8 Lowest |
| 8.00 | PAC and Aux. Boiler :Providing round the clock essential monitoring of activities, during the commissioning of Plant Air Compressor system, Aux Boiler Operation in sequence as per the operational procedures and also taking readings at local for entire system and carryout minor repair works, general cleaning etc., as per the instructions of Engineer-in-charge including T&Ps, consumables, crane charges etc., | 120 | days | 11,89,080 ₹14,03,114.4 Lowest |
| 9.00 | HVAC and Air Washer system: Charges for Providing round the clock essential monitoring of activities, during the commissioning of HVAC and Air washer system in BTG areas like CCR, TG building, GIS and ESP from control room and FOPH, SWIPH, AHP MCC Buildings, CHP MCC Buildings,CWPH in sequence as per the operational procedures and also taking readings at local for entire system and carryout minor repair works, general cleaning etc., as per the instructions of Engineer-in-charge including T&Ps, consumables, crane charges etc., | 120 | days | 11,89,080 ₹14,03,114.4 Lowest |
| 10.00 | Fire Water Pump House System : Charges for Providing round the clock essential monitoring of activities, during the commissioning of Fire Water Pump House System, High Velocity Water Spray system, Medium Velocity Spray System, Inert gas system, including pipe lines, all types of valves with fire Protection and alarm pannels and etc., in sequence as per the operational procedures and also Monitoring & taking readings at local for entire system inside & outside of the plant and carryout minor repair works, general cleaning etc., as per the instructions of Engineer-in-charge including T&Ps, consumables, crane charges etc., | 120 | days | 11,89,080 ₹14,03,114.4 Lowest |
Tender Value
Refer Docs
EMD Value
₹4.2 L
Closing Date
9 Mar 2026, 2:00 pmClosed
Chief Engineer / Udangudi STPP-I.
Chief Engineer / Udangudi STPP-I.
USTPP1 Providing round the clock essential monitoring of activities during the commissioning of systems such as BTG BOP areas Mechanical Electrical Systems Operation and Chemical Division for a period of 120 days from the date of commencement of work
2026_EB_670195_1
CE/SE/M/Udangudi STPP-I/OT.NO.M06/2025-26
Open Tender
Miscellaneous Works
Item Rate
120 days
Udangudi STPP-1
As per Tender Specification
8 documents required · 8 mandatory
₹0
₹4.2 L
Yes
11 Mar 2026
4 Mar 2026
10 Mar 2026
4 Mar 2026
9 Mar 2026
4 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MechanicalCircle Pre-Commisioning activities for Boiler : Charges for provision of safety officer assisting safety persons during Pre Commissioning Activities and condition monitoring of equipments in Boiler, Turbine and BOP areas. | 120 | days | - | - |
| 2 | Charges for assisting Pre Commissioning Activities and condition monitoring of equipments in Boiler, First Pass, Extended Pass, Back Pass, Startup System, HWL valve 1 & 2 , MECCV skid, Boiler Circulating Pump, LP Condensate pumps, Separators, Soot Blowers, Wall blowers, Wind Box, Burner registers, Burner oil skids & oil guns, H SOFA & L SOFA registers, Emergency cooling water tank and connected pumps and valves, Spray station, Soot blower Station, Scanner air fans, Oil station in the boiler area, all Motor / hand operated valves etc, including PRDS floor station. | 120 | days | - | - |
| 3 | Charges for assisting Pre Commissioning Activities and condition monitoring of equipments in Air pre Heaters, ESP, ID, FD, PA fans and connected ducts, Gates & Dampers etc. | 120 | days | - | - |
| 4 | Pre-Commisioning activities for Turbine and auxiliaries: Charges for assisting Pre Commissioning Activities and condition monitoring of Turbine and its auxiliaries such as HP, IP, LP1 & LP 2 Turbines, along with its Bearing pedestal & auxiliaries, HP/LP Heaters, HP/LP Flash tanks, Flash Boxes, EOT Cranes-4 no’s, Main Lube oil system (MOT), HPSU(Governing oil system), Motor Driven / Steam Driven Boiler feed pumps & Booster pumps with lube oil system and its accessories , HP/LP Bypass system, Overload Valves, Debris Filter System, Condenser online tube cleaning system, Condensers 1 & 2 with its accessories, Condensate Extraction pumps A, B & C, Condensate Polishing unit Vessel and Regeneration areas , Drip Pumps, Air Evacuation system including Vacuum pumps , Both SG & TG DMCW system with its accessories, ACW Selfcleaning strainers, Dozing system (Ammonia, Hydrazine & NaOH ), Central Lube oil Purification unit with DOT,COT, Centrifuges for MOT, TDBFP A & B and CLOPS , Air receiver tanks, and misc. Pumps and associated equipments, etc., checking the oil levels and topping up the oil whenever required and attending the gland leaks for pumps and valves as directed by the Engineer- in-charge including T&Ps, consumables, crane charges etc., | 120 | days | - | - |
| 5 | SWIPH and SWOPH System: Providing round the clock essential monitoring of activities, during the commissioning of Sea Water Intake System and sea water outfall system and associated equipments, in sequence as per the operational procedures and also Monitoring & taking readings at local for entire system and carryout minor repair works, general cleaning, checking the oil levels and topping up the oil whenever required and attending the gland leaks for pumps and valves etc., as per the instructions of Engineer-in-charge including T&Ps, consumables, crane charges etc., | 120 | days | - | - |
| 6 | Plant Water System : Providing round the clock essential monitoring of activities, during the commissioning of Plant Water System (which includes Charges for Providing round the clock essential monitoring of activities, during the commissioning of Plant Water System (which includes Pre Treatment Plant,Clarifier System,Pressure Sand Filters (PSF),Pressurized Ultra-Filtration (UF) System, Sea Water Reverse Osmosis system (SWRO) Brackish Water Reverse Osmosis system (BWRO),Membrane Cleaning & protection system, degasser system, DM system (MB), Remineralization system, valves and piping system), Waste water pump house, DM water Pump house, Sludge water pump house, Remin pump house, Makeup water pump house, Electrochlorination plant, ETP system, CPU Regeneration Plant, Neutralization pit, filter water Pump House, checking the oil levels and topping up the oil whenever required and attending the gland leaks for pumps and valves, Control room HVAC, all storage tanks and etc., in sequence as per the operational procedures / as per the instructions of TNPGCL Engineers and also Monitoring & taking readings at local for entire system and carryout minor repair works, general cleaning etc., as per the instructions of Engineer-in-charge including T&Ps, consumables, crane charges etc., | 120 | days | - | - |
| 7 | CWPH System Providing round the clock essential monitoring of activities, during the commissioning of Cooling Water Pump House System including cooling water pumps, ACW pumps, blowdown pumps etc., and sludge transfer pumps and other associated equipments in NDCT in sequence as per the operational procedures and also taking readings at local for entire system and carryout minor repair works, general cleaning etc., checking the oil levels and topping up the oil whenever required and attending the gland leaks for pumps and valves as per the instructions of Engineer-in-charge including T&Ps, consumables, crane charges etc., | 120 | days | - | - |
| 8 | PAC and Aux. Boiler :Providing round the clock essential monitoring of activities, during the commissioning of Plant Air Compressor system, Aux Boiler Operation in sequence as per the operational procedures and also taking readings at local for entire system and carryout minor repair works, general cleaning etc., as per the instructions of Engineer-in-charge including T&Ps, consumables, crane charges etc., | 120 | days | - | - |
| 9 | HVAC and Air Washer system: Charges for Providing round the clock essential monitoring of activities, during the commissioning of HVAC and Air washer system in BTG areas like CCR, TG building, GIS and ESP from control room and FOPH, SWIPH, AHP MCC Buildings, CHP MCC Buildings,CWPH in sequence as per the operational procedures and also taking readings at local for entire system and carryout minor repair works, general cleaning etc., as per the instructions of Engineer-in-charge including T&Ps, consumables, crane charges etc., | 120 | days | - | - |
| 10 | Fire Water Pump House System : Charges for Providing round the clock essential monitoring of activities, during the commissioning of Fire Water Pump House System, High Velocity Water Spray system, Medium Velocity Spray System, Inert gas system, including pipe lines, all types of valves with fire Protection and alarm pannels and etc., in sequence as per the operational procedures and also Monitoring & taking readings at local for entire system inside & outside of the plant and carryout minor repair works, general cleaning etc., as per the instructions of Engineer-in-charge including T&Ps, consumables, crane charges etc., | 120 | days | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_805432.xls
BOQ • 0.38 MB
M06.pdf
Tender Documents • 1.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .