Loading…
Loading…
Tender Value
₹16.8 L
EMD Value
₹16,900
Closing Date
12 Jun 2026, 5:00 pm5d left
Executive Engineer, CD-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of Compound Wall Mission Shakti Gruha at Nazarpur Basti, Jagatpur in Ward no-48
2026_ORULB_128796_1
MC(CMC)CTC_Div-IIINo9/2026-27
Open Tender
Civil Works - Others
60 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹16,900
Yes
6 Jun 2026
6 Jun 2026
18 Jun 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge. | 87.12 | Cum | 299.53 | ₹26,095.05 | BI01010001010000000000000515BI0100001120 |
| 2 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m | 16.31 | Cum | 612.7 | ₹9,991.91 | BI01010001010000000000000515BI0100001121 |
| 3 | Filling in foundation and plinth with excavated materials including watering and ramming as directed by the Engineer-in-charge for 100 cum | 50.84 | Cum | 612.7 | ₹31,152.12 | BI01010001010000000000000515BI0100001122 |
| 4 | Providing cement concrete (1:3:6) using 40m size B.H.G .C.B metal in foundation with watering ,curing including cost of materials,royalty & conveyance charges with all complete as per direction of Engineer-in-charge. | 16.41 | Cum | 6,393.8 | ₹1,04,922.26 | BI01010001010000000000000515BI0100001123 |
| 5 | R.C.C work in ground floor of M-20 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete .Column raft | 13.03 | Cum | 6,925.12 | ₹90,262.01 | BI01010001010000000000000515BI0100001124 |
| 6 | Plinth | 8.55 | Cum | 7,795.47 | ₹66,651.27 | BI01010001010000000000000515BI0100001125 |
| 7 | Column & Top beam | 10.38 | Cum | 18,597.01 | ₹1,92,943.98 | BI01010001010000000000000515BI0100001126 |
| 8 | Straightening, cutting, bending and binding, welding and jointing (if necessary ) coiled/ bent up MS Rods /Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate). | 27.17 | Qntl | 9,395.3 | ₹2,55,224.73 | BI01010001010000000000000515BI0100001127 |
| 9 | Brick work with fly ash. bricks 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ± 8 percent in cement mortar (1:6) in foundation and plinth | 19.8 | Cum | 5,538.3 | ₹1,09,658.34 | BI01010001010000000000000515BI0100001128 |
| 10 | Fly ash bricks of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2%. percentin cement mortar (1:6) brick masonary in super structure. | 43.5 | Cum | 5,571.7 | ₹2,42,368.95 | BI01010001010000000000000515BI0100001129 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_595002.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid