| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.5 Cr HVAC project for Golden Jubilee Building , Mechanical Science Building and Lecture Complex-II including Plant room and SITC of Sub-station for AC plant at National Institute of Technology-Rourkela. SH-SITC of HVAC system with centrifugal chillers (High side Only) to be installed in the existing plantroom including all required accessories, plumbing and fittings and SITC of 33 KV/0.433 KV sub-station for chiller plant including operation and comprehensive maintenance (O & CM) of entire installation for 03 year on EPC basis. | HVAC project for Golden Jubilee Building , Mechanical Science Building and Lecture Complex-II including Plant room and SITC of Sub-station for AC plant at National Institute of Technology-Rourkela. SH-SITC of HVAC system with centrifugal chillers (High side Only) to be installed in the existing plantroom including all required accessories, plumbing and fittings and SITC of 33 KV/0.433 KV sub-station for chiller plant including operation and comprehensive maintenance (O & CM) of entire installation for 03 year on EPC basis. | L1 | - | |
| 2 | L2₹19.6 Cr+₹5.4 L (0.28%) HVAC project for Golden Jubilee Building , Mechanical Science Building and Lecture Complex-II including Plant room and SITC of Sub-station for AC plant at National Institute of Technology-Rourkela. SH-SITC of HVAC system with centrifugal chillers (High side Only) to be installed in the existing plantroom including all required accessories, plumbing and fittings and SITC of 33 KV/0.433 KV sub-station for chiller plant including operation and comprehensive maintenance (O & CM) of entire installation for 03 year on EPC basis. | HVAC project for Golden Jubilee Building , Mechanical Science Building and Lecture Complex-II including Plant room and SITC of Sub-station for AC plant at National Institute of Technology-Rourkela. SH-SITC of HVAC system with centrifugal chillers (High side Only) to be installed in the existing plantroom including all required accessories, plumbing and fittings and SITC of 33 KV/0.433 KV sub-station for chiller plant including operation and comprehensive maintenance (O & CM) of entire installation for 03 year on EPC basis. | L2 | - | |
| 3 | L3₹19.8 Cr+₹27.9 L (1.43%) HVAC project for Golden Jubilee Building , Mechanical Science Building and Lecture Complex-II including Plant room and SITC of Sub-station for AC plant at National Institute of Technology-Rourkela. SH-SITC of HVAC system with centrifugal chillers (High side Only) to be installed in the existing plantroom including all required accessories, plumbing and fittings and SITC of 33 KV/0.433 KV sub-station for chiller plant including operation and comprehensive maintenance (O & CM) of entire installation for 03 year on EPC basis. | HVAC project for Golden Jubilee Building , Mechanical Science Building and Lecture Complex-II including Plant room and SITC of Sub-station for AC plant at National Institute of Technology-Rourkela. SH-SITC of HVAC system with centrifugal chillers (High side Only) to be installed in the existing plantroom including all required accessories, plumbing and fittings and SITC of 33 KV/0.433 KV sub-station for chiller plant including operation and comprehensive maintenance (O & CM) of entire installation for 03 year on EPC basis. | L3 | - | |
| 4 | L4₹20.3 Cr+₹75 L (3.84%) HVAC project for Golden Jubilee Building , Mechanical Science Building and Lecture Complex-II including Plant room and SITC of Sub-station for AC plant at National Institute of Technology-Rourkela. SH-SITC of HVAC system with centrifugal chillers (High side Only) to be installed in the existing plantroom including all required accessories, plumbing and fittings and SITC of 33 KV/0.433 KV sub-station for chiller plant including operation and comprehensive maintenance (O & CM) of entire installation for 03 year on EPC basis. | HVAC project for Golden Jubilee Building , Mechanical Science Building and Lecture Complex-II including Plant room and SITC of Sub-station for AC plant at National Institute of Technology-Rourkela. SH-SITC of HVAC system with centrifugal chillers (High side Only) to be installed in the existing plantroom including all required accessories, plumbing and fittings and SITC of 33 KV/0.433 KV sub-station for chiller plant including operation and comprehensive maintenance (O & CM) of entire installation for 03 year on EPC basis. | L4 | - | |
| 5 | L5₹20.3 Cr+₹78.1 L (4.00%) HVAC project for Golden Jubilee Building , Mechanical Science Building and Lecture Complex-II including Plant room and SITC of Sub-station for AC plant at National Institute of Technology-Rourkela. SH-SITC of HVAC system with centrifugal chillers (High side Only) to be installed in the existing plantroom including all required accessories, plumbing and fittings and SITC of 33 KV/0.433 KV sub-station for chiller plant including operation and comprehensive maintenance (O & CM) of entire installation for 03 year on EPC basis. | HVAC project for Golden Jubilee Building , Mechanical Science Building and Lecture Complex-II including Plant room and SITC of Sub-station for AC plant at National Institute of Technology-Rourkela. SH-SITC of HVAC system with centrifugal chillers (High side Only) to be installed in the existing plantroom including all required accessories, plumbing and fittings and SITC of 33 KV/0.433 KV sub-station for chiller plant including operation and comprehensive maintenance (O & CM) of entire installation for 03 year on EPC basis. | L5 | - |
| Sl No | Description | Qty | Unit | Aircon Technique Pvt Ltd L5 | AIREF ENGINEERS PVT LTD L3 | HV AIRCONDITIONING SYSTEMS PVT. LTD. L2 | SHREEJIKRUPA PROJECT LIMITED L6 | TRIBENI CONSTRUCTIONS LIMITED L4 | UDRA CONSTRUCTION PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|---|---|---|
| - | Planing, designing and Supply, installation, testing and commissioning (SITC) of water cooled Centrifugal Type chilling machine / plant along with all other related accessories, pumps, plumbings pipes & fittings etc. as per design, approved drawings, specifications and scope of the work as under:
(a) The indicative capacity of the Chiller Plant shall be as under: 2400 TR (A maximum 4 Nos. Chillers can be accommodated in the existing Chiller plant room.)
(b) Appointment of the HVAC Consultant by the contractor who satisfy the eligibility criteria laid down in the bid document for heat load calculation of the 3 buildings, planning, designing, calculations, drawings (GAD/ GFC/ SLD/ LoP and technical datasheet & specifications of the equipments/ accessories proposed to be used in the HVAC system (High side) work) and presentation thereof as required. Submission of final design & calculation and resulting GAD/ GFC/ SLD/ LoP, technical datasheet & specifications of the
equipments/ accessories proposed to be used in the HVAC System (High side) work dully proofchecked & vetted by concern department of renowned/ reputed Govt. technical institutions/ universities like NIT/IIT/IISc. (With prior approval of
Engineer-in-Charge)
(c) Supply, installation, testing and commissioning (SITC) of water cooled Centrifugal Type chilling machine / plant along with all other related accessories, pumps, plumbings & fittings etc. as per design, approved drawings, specifications and scope of the work. HVAC (High side) plant room consisting of high side equipments i.e. chillers, Cooling tower, Primary & Secondary pumps complete with condenser, chilled water pipe lines (Supply & Return ), all necessary valves, Makeup tank, Water treatment plant, tertiary pumps, electrical panels, control panels, VFD’s, Pumps, motors, structural steel supporting arrangement etc. as per design and specifications specified in the
bid document. SITC of booster pumps for each building to be served/ connected at existing booster pump room. The Connection of Chillers to the existing common header and/ or separate header provided in this contract and to the respective building to be served/ connected through pipes of designed length and diameter. Completion of entire work as per the scope and direction of E-in-C.
(d) Minor Civil work which is required to be carried out by the contractor in connection with the execution of HVAC (High side) in existing Chiller Plant Room and / or Sub-Station Room to create additional space (If required) to house Chiller Plant & its accessories and/ or Sub-Station & its accessories as per the scope of work. Civil work also includes the construction of trenches/ chambers for laying pipes lines with fitting in external area from Chiller Plant to the Booster Pump Room and from Booster Pump Room to the respective building to be served/ connected. Cement Concrete and/ or RCC work in foundation/ base/ pedestal of the HVAC (High side) and Sub-Station Equipments/ Machines/ Accessories etc. shall be provided as per approved design/ GAD/ GFC/ SLD/ LoP/Structural drawings.
RCC work (Beam/ Column/ Slab/ Plateform/ Tank) for the the installation of Cooling Towers at roof top of existing Chiller Plant. | 2,400 | Per TR | 72,165 ₹17,31,96,000 | 67,220 ₹16,13,28,000 | 66,000 ₹15,84,00,000 | 90,760 ₹21,78,24,000 | 68,000 ₹16,32,00,000 | 62,600 ₹15,02,40,000 Lowest |
| - | Submission of Electrical load calculation for HVAC System (High side), Planning, Design, & Preparation of GFC/ GAD/ SLD/ LoP Drawings from approved agency/ vendor/ supplier of Sub-Station Equipments & its accessories including panels & cables etc. and execution of work as under:
(a) Supply, installation, testing and commissioning (SITC) of Indoor & ONAN (Oil Natural Air Natural) Cooling Type 33KV/ 0.433KV Sub-Station equipment’s (Indicative Capacity: 3000 KVA) and external cabling as per design, approved drawings, scope and specifications specified in the bid document.
Sub-Station shall have ONAN Cooling Type Transformer which includes Sub-station equipments, HT (VCB) panels, Transformers, LT Panels, bus trucking, APFC panel & Active harmonics filter panel (AHF), Transient Voltage Suppression system (TVSS), Surge Protection System (SPD), HT and LT cables, earthing, Substation Safety equipment, HT/LT Cable trench/ pit with its covering complete etc.
(b) SITC of external service connection up to cooling towers, LT panels and all motors including booster pumps (For respective building), SITC of Cable trays, laying of cable on surface, trench and below the ground as per approved design/ drawings including associated Civil work. The Sub-station shall meet the requirement of the chiller unit and all the others equipments related with chiller unit. | 3,000 | Per KVA | 9,282 ₹2,78,46,000 Lowest | 9,350 ₹2,80,50,000 | 10,100 ₹3,03,00,000 | 12,620 ₹3,78,60,000 | 11,500 ₹3,45,00,000 | 12,600 ₹3,78,00,000 |
| 3(a) | Operation & Comprehensive Maintenance (O & CM) for 1st. Year of Defect iability Period (DLP) | 12 | Per Month | 55,722 ₹6,68,664 Lowest | 2,28,750 ₹27,45,000 | 90,000 ₹10,80,000 | 2,13,300 ₹25,59,600 | 1,40,000 ₹16,80,000 | 1,50,000 ₹18,00,000 |
| 3(b) | Operation & Comprehensive Maintenance (O & CM) for 2nd. Year of Defect Liability Period (DLP) | 12 | Per Month | 55,722 ₹6,68,664 Lowest | 2,40,188 ₹28,82,256 | 2,40,000 ₹28,80,000 | 2,64,255 ₹31,71,060 | 1,40,000 ₹16,80,000 | 2,00,000 ₹24,00,000 |
| 3(c) | Operation & Comprehensive Maintenance (O & CM) for 3rd. Year of Defect Liability Period (DLP) | 12 | Per Month | 55,722 ₹6,68,664 Lowest | 2,52,197 ₹30,26,364 | 2,60,000 ₹31,20,000 | 3,11,418 ₹37,37,016 | 1,40,000 ₹16,80,000 | 2,50,000 ₹30,00,000 |
Tender Value
₹22.3 Cr
EMD Value
₹32.3 L
Closing Date
10 Oct 2022, 5:00 pmClosed
EE(E)-Sambhalpur
PRASHANT KUMAR RAI
Plot no. 188/623-624, Nirman bhavan, CPWD, Pokhariput , Bhubanesshwar -20
HVAC project for Golden Jubilee Building , Mechanical Science Building and Lecture Complex-II including Plant room and SITC of Sub-station for AC plant at National Institute of Technology-Rourkela. SH-SITC of HVAC system with centrifugal chillers (High side Only) to be installed in the existing plantroom including all required accessories, plumbing and fittings and SITC of 33 KV/0.433 KV sub-station for chiller plant including operation and comprehensive maintenance (O & CM) of entire installation for 03 year on EPC basis.
19030
06/NIT/SE-SAMBALPUR/CPWD/2022-23
OPEN
Electrical Works
NCB
8 months
Kanpur Nagar, Uttar Pradesh
8 documents required · 8 mandatory
₹32.3 L
Office of the SE Sambalpur, CPWD, Sambalpur, Odisha.
10 Oct 2022
13 Sept 2022
10 Oct 2022
10 Oct 2022
19 Sept 2022
19 Sept 2022
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
06NITSESAMBALPURNITROURKELA.pdf
document • 2.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .