| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC GOPAL PRASAD MALLIBANDHA TALCHER DIST ANGUL PIN 759103 ODISHA | TALCHER | ANGUL | ODISHA | 759103 | ₹2.5 L Quoted ₹2.1 L | L1 | Accepted-AOC AWARDED FOR BEING L1 BIDDER |
| 2 | L2₹3.6 L+₹1.5 L (73.3%)Rejected-Finance AT PIDHAKHAMAN PO RAIJHARAN DIST ANGUL ODISHA PIN 759130 | ANGUL | ANGUL | ODISHA | 759130 | ₹3.6 L+₹1.5 L (73.3%) | L2 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
| 3 | L3₹3.7 L+₹1.6 L (74.3%)Rejected-Finance AT BHALUGADIA P O KUMUNDA TALCHER DIST ANGUL ODISHA 759103 | TALCHER | ANGUL | ODISHA | 759103 | ₹3.7 L+₹1.6 L (74.3%) | L3 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
| 4 | L4₹3.7 L+₹1.6 L (75.7%)Rejected-Finance | ₹3.7 L+₹1.6 L (75.7%) | L4 | Rejected-Finance REJECTED FOR NOT BEING L1 BIDDER |
Tender Value
₹3.9 L
EMD Value
₹5,000
Closing Date
1 Jun 2026, 5:00 pmClosed
STAFF OFFICER (CIVIL), HINGULA AREA
SO (CIVIL), OFFICE OF THE GM, HINGULA AREA, P.O._N.S.NAGAR, TALCHER, ANGUL_759148, ODISHA, INDIA
Shifting of Dion Ghar of village kusumpal at Hingula OCP under Hingula Area.
2026_MCL_360019_1
MCL/GM(HA)/Civil/e-Tender/ 26-27/28 Dt.21.05.2026
Open Tender
Civil Works - Others
Percentage
60 days
HINGULA OCP
AS PER NIT
3 documents required · 3 mandatory
₹5,000
Yes
6 Jul 2026
22 May 2026
2 Jun 2026
22 May 2026
1 Jun 2026
22 May 2026
22 May 2026 - 25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 15.7 | Cum | 217 | ₹3,406.9 |
| 1.02 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 3.56 | Cum | 910.15 | ₹3,240.13 |
| 1.03 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.56 | Cum | 4,826.85 | ₹17,183.59 |
| 1.04 | Brick work with Fly Ash Brick (230x125x75mm size) bricks of class designation 10 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 9.1 | Cum | 5,457.4 | ₹49,662.34 |
| 1.05 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1.75 | Cum | 8,464.45 | ₹14,812.79 |
| 1.06 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars. | 157.61 | KG | 101.4 | ₹15,981.65 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 15.23 | Sqm | 526.7 | ₹8,021.64 |
| 1.08 | Brick work with Fly Ash Brick (230x125x75mm size) bricks of class designation 10 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) | 11.41 | Cum | 6,667.75 | ₹76,079.03 |
| 1.09 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. | 14.23 | Cum | 115.2 | ₹1,639.3 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.63 MB
Tendernotice_2.pdf
PDF • 0.76 MB
BOQ_372896.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .