Loading…
Loading…
Tender Value
₹20.7 L
EMD Value
₹41,352
Closing Date
24 Sept 2026, 5:00 pm2d left
Executive Engineer
Provl. Divn. PWD B and R Br. Hpur.
RENOVATION OF INDOOR STADIUM, HOSHIARPUR
2026_CEPW_175601_1
28
Open Tender
Civil Works - Buildings
Percentage
90 days
Hoshiarpur
Please refer Tender documents.
22 documents required · 22 mandatory
₹5,000
₹41,352
Yes
17 Sept 2026
17 Sept 2026
25 Sept 2026
17 Sept 2026
24 Sept 2026
17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. CSR NO. - 6.6 | 34.87 | cum. | 191.74 | ₹6,685.21 |
| 2 | Cement concrete 1:4:8 With stone aggregate 40mm gauge. mixing by mechanical means using concrete mixer volumetric type CSR NO. - 10.11 b ii | 53.88 | cum. | 3,812.62 | ₹2,05,435.4 |
| 3 | First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth CSR NO. - 11.7 | 14.23 | cum | 5,382.33 | ₹76,563.64 |
| 4 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. CSR NO. - 10.15 | 2.52 | cum. | 5,428.69 | ₹13,674.87 |
| 5 | Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% taking outside the premises in 15 cm layers including ramming, watering and consolidated lead upto 1000 metres | 96.12 | cum. | 291.82 | ₹28,050.61 |
| 6 | Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% taking outside the premises in 15 cm layers including ramming, watering and consolidated lead upto 1000 metres CSR NO. - 6.6 c i | 13.95 | cum | 66.37 | ₹925.6 |
| 7 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) CSR NO. - 9.1 | 87.12 | sqm | 221.24 | ₹19,275.09 |
| 8 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. CSR NO. - 10.20 | 3.96 | cum | 6,217.76 | ₹24,628.55 |
| 9 | Centering and shuttering for sides and soffits of beam, beams, launching girders, bressumers, lintels. CSR NO. - 9.6 | 39.61 | sqm | 400.33 | ₹15,856.67 |
| 10 | First class burnt brick work laid in cement sand mortar 1:6 in first storey upto 4 metres above plinth level CSR NO. - 11.4 i | 11.1 | cum | 6,578.29 | ₹73,025.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.40 MB
SBD28.pdf
Tender Documents • 31.00 MB
BOQ_357369.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .