| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹8.0 L (7.04%)Admitted-Finance | ₹1.2 Cr+₹8.0 L (7.04%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹40.7 L (35.7%)Admitted-Finance PLOT NO G 5 ADDL MIDC PHASE I JALNA | JALNA | JALNA | MAHARASHTRA | ₹1.5 Cr+₹40.7 L (35.7%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Resposive |
| Sl No | Description | Qty | Unit | Rajeshwar Construction L1 | Courage Infra Pvt Ltd L3 | SIDDHIVINAYAK INFRASTRUCTURE L2 |
|---|---|---|---|---|---|---|
| 1.00 | DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder of specified grade of Bitumen @ 4.50 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired density for 76- 100 mm compacted thickness.USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler.(VG-30 bulk bitumen rates are considered to arrive at rates) | 263.84 | One Cubic Metre | 7,800 ₹20,57,967.6 Lowest | 11,289.99 ₹29,78,773.54 | 8,400 ₹22,16,272.8 |
| 2.00 | BITUMINOUS CONCRETE:- Providing and laying bituminous concrete using crushed aggregates of grading 1, premixed with bituminous binder @ 5.20 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50 mm compacted thickness with specified grade of Bitumen,Excluding prime / tack coat. For Bitumen of specified grade -- USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler. (VG-30 bulk bitumen rates are considered to arrive at rates) | 641.17 | One Cubic Metre | 9,100 ₹58,34,683.4 Lowest | 12,748.15 ₹81,73,782.33 | 11,300 ₹72,45,266.2 |
| 3.00 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates) | 34,324.41 | One Square Metre | 15 ₹5,14,866.15 Lowest | 20.24 ₹6,94,726.06 | 15 ₹5,14,866.15 Lowest |
| 4.00 | BITUMINOUS MACADAM:--Providing and laying bituminous macadam using crushed aggregate of Grading 1, premixed with bituminous binder, transported at site with VTS, laid over a previously prepared surface , finished to the required grade ,level, alignment,and rolling to achieve the desired density for 80/100 mm compacted thickness with drum mix type hot mix plant with SCADA having complying essential features of Hot mix plant as per IRC-27 2009 specified conditions and attachments such as electronic load sensor based belt conveyers,automatic synchronization of bitumen and aggregate fedder,built in dust controller system and PLC for Drum Mix plant, Sensor paver,and Vibratory roller excluding prime/Tack coat etc. complete --Bitumen 3.30% of specified grade (VG-30 bulk bitumen rates
are considered to arrive at rates) | 128.49 | One Cubic Metre | 6,500 ₹8,35,185 Lowest | 8,324.57 ₹10,69,624 | 7,800 ₹10,02,222 |
| 5.00 | Supplying hard murum / kankar at the road side, including conveying and stacking etc. Spreading hard murum. Compacting the hard murum / kankar in layers of thickness upto 20cm with vibratory roller including necessary labour, material and artificial watering etc. complete complete as directed by Engineer in charge. | 1,830.8 | One Cubic Metre | 700 ₹12,81,560 | 924.31 ₹16,92,226.75 | 500 ₹9,15,400 Lowest |
| 6.00 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | 5,492.4 | One Cubic Metre | 100 ₹5,49,240 | 113.05 ₹6,20,915.82 | 40 ₹2,19,696 Lowest |
| 7.00 | Excavation for catch / side water gutter in Hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 1,830.8 | One Cubic Metre | 180 ₹3,29,544 | 132.05 ₹2,41,757.14 | 50 ₹91,540 Lowest |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
11 Oct 2024, 5:30 pmClosed
EE NHD Chhatrapati Sambhajinagar
EE NHD Chhatrapati Sambhajinagar
STMC to Bhokardan Hasnabad Rajur Deulgaonraja 0 000 to 66 790 Section of NH 753 M Balance Length 4 750 in the state of Maharashtra.
2024_MoRTH_826205_1
EENHD/Chh.S/Tender/NIt No.2/3001982
Open Tender
Civil Works
Works
365 days
Chhatrapati Sambhajinagar
Rs.5,000/- Toward cost of RFP at the time of the submission, through the portal Bharatkosh.gov.in (receipt/document of online payment to be submitted along with bid in soft copy.
8 documents required · 8 mandatory
₹5,000
Bharatkosh
₹1.6 L
SE NHC, Chhatrapati Sambhajinagar Saneh nagar Band
15 Jan 2025
14 Sept 2024
14 Oct 2024
14 Sept 2024
11 Oct 2024
14 Sept 2024
24 Sept 2024
Amount
DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder of specified grade of Bitumen @ 4.50 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired density for 76- 100 mm compacted thickness.USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler.(VG-30 bulk bitumen rates are considered to arrive at rates)
BITUMINOUS CONCRETE:- Providing and laying bituminous concrete using crushed aggregates of grading 1, premixed with bituminous binder @ 5.20 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50 mm compacted thickness with specified grade of Bitumen,Excluding prime / tack coat. For Bitumen of specified grade -- USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler. (VG-30 bulk bitumen rates are considered to arrive at rates)
Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates)
BITUMINOUS MACADAM:--Providing and laying bituminous macadam using crushed aggregate of Grading 1, premixed with bituminous binder, transported at site with VTS, laid over a previously prepared surface , finished to the required grade ,level, alignment,and rolling to achieve the desired density for 80/100 mm compacted thickness with drum mix type hot mix plant with SCADA having complying essential features of Hot mix plant as per IRC-27 2009 specified conditions and attachments such as electronic load sensor based belt conveyers,automatic synchronization of bitumen and aggregate fedder,built in dust controller system and PLC for Drum Mix plant, Sensor paver,and Vibratory roller excluding prime/Tack coat etc. complete --Bitumen 3.30% of specified grade (VG-30 bulk bitumen rates are considered to arrive at rates)
Supplying hard murum / kankar at the road side, including conveying and stacking etc. Spreading hard murum. Compacting the hard murum / kankar in layers of thickness upto 20cm with vibratory roller including necessary labour, material and artificial watering etc. complete complete as directed by Engineer in charge.
Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils.
Excavation for catch / side water gutter in Hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed.
SIDDHIVINAYAK INFRASTRUCTURE (BID ID -3097322)
Courage Infra Pvt Ltd (BID ID -3101176)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .