Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.1 LAdmitted-Finance 1 225 5 6 SADAR BAZAR DELHI CANTT 110010 | NEW DELHI | DELHI | 110010 | L1 | Admitted-Finance | |
| 2 | L2₹39.1 L+₹98,941.50 (2.59%)Admitted-Finance D1C 47A JANAK PURI NEW DELHI 110058 | NEW DELHI | DELHI | DELHI | 110058 | L2 | Admitted-Finance | |
| 3 | L3₹40.8 L+₹2.7 L (7.06%)Admitted-Finance FLAT NO F2 BLOCK A FIRST FLOOR THE LEGACY APARTMENT AIRPORT ROAD GOLA KA MANDIR GWALIOR MP 474005 | GWALIOR | GWALIOR | MADHYA PRADESH | 474005 | L3 | Admitted-Finance | |
| 4 | L4₹42.2 L+₹4.0 L (10.6%)Admitted-Finance HOUSE NO 142 GALI NO 07 PREM VIHAR NANGLI SAKRAWATI NAJAFGARH NEW DELHI 110043 | NEW DELHI | NAJAFGARH | DELHI | 110043 | L4 | Admitted-Finance | |
| 5 | L5₹43.2 L+₹5.1 L (13.3%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | B.R. Enterprises L8 | Pradeep Bros L2 | Yadav Enterprises L10 | AMIT ENTERPRISES L9 | PRASAD ELECTRICALS L6 | M P TYAGI ENGINEERS AND CONTRACTORS L1 | GIR RAJ BUILDERS L5 | Jai Mahakaal Construction L3 | jain associates L7 | S K ENGINEERS AND CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 metre depth and getting out in any type of soil for taking out/laying of pipe complete all as specified and as directed | 610 | CUM | 220 ₹1,34,200 | 100 ₹61,000 | 120 ₹73,200 | 222 ₹1,35,420 | 345 ₹2,10,450 | 99 ₹60,390 | 90 ₹54,900 Lowest | 220 ₹1,34,200 | 210 ₹1,28,100 | 100 ₹61,000 |
| 2.00 | Returning filling in, including spreading, leveling, watering and well ramming in layers not exc. 25 cm thick complete all as specified and directed. | 549 | CUM | 170 ₹93,330 | 20 ₹10,980 | 40 ₹21,960 | 22 ₹12,078 | 244 ₹1,33,956 | 9 ₹4,941 Lowest | 30 ₹16,470 | 100 ₹54,900 | 160 ₹87,840 | 30 ₹16,470 |
| 3.00 | Removal of excavated material from site to a distance not exceeding 50 meters away and depositing where directed at a level not exceeding 1.5 meters above the starting point complete all as specified and directed. | 61 | CUM | 180 ₹10,980 | 20 ₹1,220 | 40 ₹2,440 | 22 ₹1,342 | 144 ₹8,784 | 9 ₹549 Lowest | 30 ₹1,830 | 100 ₹6,100 | 190 ₹11,590 | 30 ₹1,830 |
| 4.00 | Excavation in trenches by cutting of road crossing, PCC hard standing for taking out/laying of pipe lines including filling of PCC (1:2:4) type B-2 using 40 mm graded crushed stone aggregate as in foundations, filling and mass concrete complete including making good the existing surface complete all as specified and as directed. | 0.5 | CUM | 5,500 ₹2,750 | 500 ₹250 | 4,000 ₹2,000 | 2,222 ₹1,111 | 3,456 ₹1,728 | 199 ₹99.5 Lowest | 2,000 ₹1,000 | 5,000 ₹2,500 | 2,230 ₹1,115 | 5,000 ₹2,500 |
| 5.00Taking up GI/CI/MS Pipes including all fitting of the following sizes complete all as specified and directed:- | |||||||||||||
| 5.01 | 80 mm bore | 140 | RM | 345 ₹48,300 | 20 ₹2,800 | 20 ₹2,800 | 9 ₹1,260 | 133 ₹18,620 | 9 ₹1,260 | 5 ₹700 Lowest | 40 ₹5,600 | 65 ₹9,100 | 50 ₹7,000 |
| 5.02 | 100 mm bore | 450 | RM | 280 ₹1,26,000 | 25 ₹11,250 | 20 ₹9,000 | 9 ₹4,050 | 144 ₹64,800 | 9 ₹4,050 | 5 ₹2,250 Lowest | 45 ₹20,250 | 85 ₹38,250 | 50 ₹22,500 |
| 5.03 | 150 mm bore | 510 | RM | 220 ₹1,12,200 | 30 ₹15,300 | 30 ₹15,300 | 9 ₹4,590 | 144 ₹73,440 | 19 ₹9,690 | 5 ₹2,550 Lowest | 50 ₹25,500 | 95 ₹48,450 | 50 ₹25,500 |
| 5.04 | 200 mm bore | 120 | RM | 145 ₹17,400 | 40 ₹4,800 | 40 ₹4,800 | 9 ₹1,080 | 233 ₹27,960 | 19 ₹2,280 | 5 ₹600 Lowest | 55 ₹6,600 | 110 ₹13,200 | 50 ₹6,000 |
| 6.00Supply, laying jointing, testing of DI pipe with class-K-7 spigot socketed ends, conforming to IS-8329 laid in trenches including providing route indicators of suitable height and laying at spacing of @ 50m center to center at GL mentioning name of contractor, date of execution & CA No with name of work & rubber gasket (Tyton) joints with jointing material & route indicators of the following sizes including taking down of existing CI/DI pipe complete all as specified and directed by Engineer-in-Charge. Note 1: - Excavation & earth work shall be measured and paid seperately under respective items of BOQ. Note 2:- Contractors will provide route indicators mild steel body with top 150 mm plate 3mm thick and height not less than 300mm above finished GL at suitable intervals as directed by EIC. Cost of route indicators shall be deemed included in quoted unit rates. Note 3:- Layout plan for laying of DI pipe shall be given by EIC in writing. | |||||||||||||
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
5 Aug 2026, 6:00 pmClosed
GE U WATER SUPPLY DELHI CANTT 10
GE U WATER SUPPLY DELHI CANTT 10
REPAIR REPLACEMENT RE ROUTING OF OLD CEMENTED CI DI GI WATER PIPELINE SYSTEM OF CASD AREA RASHTRAPATI BN AREA DAD PANCHWATI AREA NAUSENA BAGH AREA DCN PALAM AREA PIRU VIHAR VIKRAM BATRA VIHAR CVD DEPOT OSG SAKURBASTI 60 INF BDE AREA SIGNAL GROUP AREA
2026_MES_778773_1
GE/WS/Token No-33 OF 2026-27
Open Tender
Civil Works
Item Rate
270 days
GE U WATER SUPPLY DELHI CANTT 10
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE U WATER SUPPLY DELHI CANTT 10
₹96,000
Yes
21 Aug 2026
15 Jul 2026
7 Aug 2026
15 Jul 2026
5 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exceeding 1.5 mtr wide and not exceeding 1.5 metre depth and getting out in any type of soil for taking out/laying of pipe complete all as specified and as directed | 610 | CUM | 22 | ₹13,420 |
| 2 | Returning filling in, including spreading, leveling, watering and well ramming in layers not exc. 25 cm thick complete all as specified and directed. | 549 | CUM | 22 | ₹12,078 |
| 3 | Removal of excavated material from site to a distance not exceeding 50 meters away and depositing where directed at a level not exceeding 1.5 meters above the starting point complete all as specified and directed. | 61 | CUM | 22 | ₹1,342 |
| 4 | Excavation in trenches by cutting of road crossing, PCC hard standing for taking out/laying of pipe lines including filling of PCC (1:2:4) type B-2 using 40 mm graded crushed stone aggregate as in foundations, filling and mass concrete complete including making good the existing surface complete all as specified and as directed. | 0.5 | CUM | 22 | ₹11 |
| 5 | Taking up GI/CI/MS Pipes including all fitting of the following sizes complete all as specified and directed:- | - | - | - | - |
| - | 80 mm bore | 140 | RM | 22 | ₹3,080 |
| - | 100 mm bore | 450 | RM | 22 | ₹9,900 |
| - | 150 mm bore | 510 | RM | 22 | ₹11,220 |
| - | 200 mm bore | 120 | RM | 22 | ₹2,640 |
| 6 | Supply, laying jointing, testing of DI pipe with class-K-7 spigot socketed ends, conforming to IS-8329 laid in trenches including providing route indicators of suitable height and laying at spacing of @ 50m center to center at GL mentioning name of contractor, date of execution & CA No with name of work & rubber gasket (Tyton) joints with jointing material & route indicators of the following sizes including taking down of existing CI/DI pipe complete all as specified and directed by Engineer-in-Charge.
Note 1: - Excavation & earth work shall be measured and paid seperately under respective items of BOQ.
Note 2:- Contractors will provide route indicators mild steel body with top 150 mm plate 3mm thick and height not less than 300mm above finished GL at suitable intervals as directed by EIC. Cost of route indicators shall be deemed included in quoted unit rates.
Note 3:- Layout plan for laying of DI pipe shall be given by EIC in writing. | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_872249.xls
BOQ • 0.43 MB
tender.pdf
Tender Documents • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .