Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance SOL PRO BHAGWAT PRASAD GRAM PAHARIKHURDA POST SAROL TEH TEHROLI DISTT JHANSI | JHANSI | UTTAR PRADESH | 284001 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
₹73.0 L
EMD Value
₹7.3 L
Closing Date
13 Sept 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EEMI JHANSI
KANPUR ROAD JHANSI
CONSTRUCTION OF CHACKDAM KOTRA BLOCK GURSARAIN
2021_UPMID_617438_3
06/CHECKDAM/2021-22
Open Tender
Civil Works
Fixed-rate
120 days
JHANSI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,348
EEMI DIVISION JHANSI
₹7.3 L
Yes
20 Sept 2021
7 Sept 2021
14 Sept 2021
7 Sept 2021
13 Sept 2021
7 Sept 2021
90 days
Amount
ITEMS
EARTH WORK IN EXCAVATION IN MAR KABAR RANKAR AND KANKAR MIX SOIL IN DIGGING OR IN EMBANKMENT INCLUDING LEAD UP TO 0.0 MTR AND LIFT UP TO 1.50 MTR INCLUDING DRESSING,MAKING PROFILE AND MANUAL COMPACTION .
SAME AS ABOVE BUT FOR LIFT 1.50 METER TO 3.00 METER
IN SATURETED SOIL(EXCLUDING COST OF DEWATERING) 0.00 METER TO 1.50 METER
REMOVAL OF SLUSH
CONCRETE WITH CEMENT.SAND AND 40MM GAVGE STONE BALLAST PROPORTION OF 1;3;6 IN FOUNDATION AND FLOOR INCLUDING SUPPLY OF ALL MATERIAL,(INCLUDING COST OF CEMENT) LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK
RANDOM COURSED RUBBLE STONE MASONARY WITH APPRROVED QUARRY STONE KHANDA, SAND AND CEMENT IN PROPORTION OF 1:4CEMENT SADN MORTER IN FOUNDATION INCLUDING SUPPLY OF ALL MATERIAL,(INCLUDING COST OF CEMENT) LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK.
RANDOM RUBBLE STONE MASONARY WITH APPRROVED QUARRY STONE, SAND AND CEMENT IN PROPORTION OF 1:4 CEMENT SAND MORTER IN FOUNDATION AND SUPER STRUCTURE INCLUDING SUPPLY OF ALL MATERIAL,(INCLUDING COST OF CEMENT) LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK.
CONCRETE WITH CEMENT,SAND & 20 MM GAUGE STONE GRIT IN PROPORTION OF 1:2:4 ON FLOOR INCLUDING SUPPLY OF ALL MATERIAL,(INCLUDING COST OF CEMENT) LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK
RAISED CEMENT POINTING WITH CEMENT SAND MORTAR CONSISTING 1 PART CEMENT AND 2 PARTS OF APPROVED SAND ON STONE WORK INCLUDING SUPPLY OF ALL MATERIAL,(INCLUDING COST OF CEMENT) LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK
PLASRER WITH CEMENT SAND MORTAR IN 1:2 (ONE CEMENT AND TWO LOCAL SAND ) INCLUDING SUPPLY OF ALL MATERIAL,(INCLUDING COST OF CEMENT) LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF THE WORK
DRY STONE PITCHING
S/F 600 MM DIA NP 3 HUME PIPE IN 2.5 MTR LENGTH
SIDE GUARD STONE
DEWATERING DURING CONSTRUCTION OF CHEAKDAM BY 8 H. P. DIESEL PUMP SET.
M/s SINGH BROTHERS
gangotri tubewells
M/S KAVYA CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .