| Sl No | Description | Qty | Unit | MAAMAYAN TRADITIONAL ARCHITECTS & SCULPTORS L2 | N SELVAKUAMRAN L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling and clearing away the Ceramic tiles on the Floor from the site with standard specifications. | 1,431 | m² | 90 ₹1.3 L | 80 ₹1.1 L |
| 2.00 | Dismantling and clearing away the PCC Flooring from the site with standard specifications. | 143 | m³ | 660 ₹94,380 | 650 ₹92,950 |
| 3.00 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 938 | m³ | 300 ₹2.8 L | 290 ₹2.7 L |
| 4.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 12 | m³ | 7,600 ₹91,200 | 7,550 ₹90,600 |
| 5.00 | R.R Masonary in cement mortar 1:5(one cement,and five crushed stone sand) for foundation and basement including simultaneously pointing above ground level with the same mortar etc.,complete | 141 | m³ | 8,550 ₹12.1 L | 8,500 ₹12.0 L |
| 6.00 | Brick Jelly Lime Concrete 1:2:5 (One Lime, Two crushed stone sand and Five brick jelly) using 40mm brick jelly etc. complete. | 131 | m³ | 6,100 ₹8.0 L | 6,050 ₹7.9 L |
| 7.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 131 | m³ | 2,750 ₹3.6 L | 2,700 ₹3.5 L |
| 8.00 | Laying and Fixing new cutstone flooring with 100mm thick stone of size (2' x 2') Joints are pointing with Lime mortor LM 1:1.5 mix 20mm depth flush pointing works including cost of all materials ,labour charges, scafolding and curing etc., completed as per specification. | 1,309 | m² | 5,250 ₹68.7 L | 5,100 ₹66.8 L |
| 247.00 | GST 18% | 1 | No | 17,69,925.6 ₹17.7 L | 17,26,326 ₹17.3 L |
Updated dates
Tender Value
₹1.1 Cr
EMD Value
₹67,500
Closing Date
11 Feb 2026, 3:00 pmClosed
Joint Commissioner/Executive Officer
Office of Arulmigu Ramanathaswamy Temple, Rameswaram
Removing the existing ceramic tiles flooring, and providing new cut stone flooring to North Side Second Prakara of Arulmigu Ramanathaswmay Temple, Rameswaram, Ramanathapuram District
2026_HRCE_644110_1
1822/2025/A3
Open Tender
Miscellaneous Works
Rameswaram
Please Refer Tender Documents
7 documents required · 7 mandatory
₹0
₹67,500
11 Feb 2026
15 Jan 2026
11 Feb 2026
15 Jan 2026
11 Feb 2026
15 Jan 2026
Dismantling and clearing away the Ceramic tiles on the Floor from the site with standard specifications.
Dismantling and clearing away the PCC Flooring from the site with standard specifications.
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers
R.R Masonary in cement mortar 1:5(one cement,and five crushed stone sand) for foundation and basement including simultaneously pointing above ground level with the same mortar etc.,complete
Brick Jelly Lime Concrete 1:2:5 (One Lime, Two crushed stone sand and Five brick jelly) using 40mm brick jelly etc. complete.
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Laying and Fixing new cutstone flooring with 100mm thick stone of size (2' x 2') Joints are pointing with Lime mortor LM 1:1.5 mix 20mm depth flush pointing works including cost of all materials ,labour charges, scafolding and curing etc., completed as per specification.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
TenderDocumentFlooring.pdf
Tender Documents • 0.58 MB
BOQ_771837.xls
BOQ • 0.34 MB
Drawing2ndPrakaraFlooring.pdf
Additional Documents • 1.45 MB
Download all tender documents and submit your bid