| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-Finance | ₹7.6 L | L1 | Accepted-Finance L1 |
| Sl No | Description | Qty | Unit | RAKESH SINGH L1 |
|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m : | ||||
| 1.01 | All kinds of soil. | 27 | One Cubic Metre | 280 ₹7,560 |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 27 | One Cubic Metre | 200 ₹5,400 |
| 3.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 10 | One Cubic Metre | 2,500 ₹25,000 |
| 4.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering : All work upto plinth level : | ||||
| 4.01 | 1 : 5 : 10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size). | 5 | One Cubic Metre | 7,000 ₹35,000 |
| 5.00Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | ||||
| 5.01 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 46 | One Cubic Metre | 10,500 ₹4.8 L |
| 6.00Centering and shuttering including strutting, propping etc. and removal of form for : | ||||
| 6.01 | Foundations, footings, bases of columns, etc. for mass concrete | 81 | One Square Metre | 420 ₹34,020 |
Tender Value
₹6.4 L
EMD Value
₹12,720
Closing Date
27 Jan 2026, 6:00 pmClosed
Executive Engineer (Civil)
Office of the Executive Engineer (Civil), BSNL Civil Division, Raj Kishore Nagar Telephone Exchange, IInd Floor, Bilaspur (Chhattisgarh), Pin 495006.
Construction of OD Pads at RAN BSNL sites at Kachanda, Umrali, Seoni, Birra, Jawalpur, Dongakharod and Adbhar in District Janjgir-Champa, Chhattisgarh under Bilaspur Business Area.
2026_BSNL_263018_1
18/2025-26/BSNL/CD/BILASPUR Date 14.01.2026
Open Tender
Civil Works
60 days
Janjgir champa, Chhattisgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Account Officer (Cash) O/o GM BSNL Bilaspur BA
₹12,720
3 Feb 2026
14 Jan 2026
30 Jan 2026
14 Jan 2026
27 Jan 2026
14 Jan 2026
14 Jan 2026 - 27 Jan 2026
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering : All work upto plinth level :
1 : 5 : 10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand).
Structural steel work riveted, bolted or welded in built up sections trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Neat cement punning.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :
Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_304839.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid