Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAccepted-AOC | ₹13.9 L | L1 | Accepted-AOC Stood L1 |
| 2 | L2₹15.5 LRejected-AOC | ₹15.5 L | L2 | Rejected-AOC Stood L2 |
| 3 | Rejected-Technical 31 A MIDC HINGANA INDUSTRIAL AREA PARAMOUNT CONDUCTORS LTD HINGNA INDUSTRIAL AREA NAGPUR MS NAGPUR MAHARASHTRA 440016 UDYAM MH 20 0006319 27AABCP7890B1ZC R M MSME STATUS AS VERIFIED | NAGPUR | MAHARASHTRA | 440016 | - | - | Rejected-Technical As per committee Recommendation |
| Sl No | Description | Qty | Unit | ARCHIT ELECTRICALS PVT LTD | VERTO ENGINEERING CORPORATION |
|---|---|---|---|---|---|
| 1.00SSTPP | |||||
| 1.01 | Repairing of 2.5 MVA Transformer
a) Replacement of one limb (HV+ LV coils) with new coils.
b) Transportation of failed transformer to firm's factory.
c) Unloading of transformer.
d) Testing and visual inspection of transformer.
e) Dismantling of failed coils.
f) Supply of new HV+LV coils
g) Assembly of coils.
h) Testing of transformer.
i) Transportation of transformer back to Site.
j) Supervision at site during installation. | 1 | Job | 11,75,000 ₹13.9 L | 13,15,000 ₹15.5 L |
Tender Value
₹15.5 L
EMD Value
₹31,100
Closing Date
17 Feb 2025, 3:30 pmClosed
S.E. (Works), SSTPP
O/o Addl. C.E.(P and W) SSTPP MPPGCL DONGALIA
Work contract for Coil replacement of Y Phase HV and LV coils. Testing and commissioning of 2.5 MVA, 6.6/0.415 KV Transformer II of CHP Main MCC at 2x600 MW CHP, PH-I, SSTPP, MPPGCL, Dongalia
2024_MPPGC_373899_1
WT-2516/CHP
Open Tender
Miscellaneous Works
45 days
SSTPP MPPGCL DONGALIA
Please refer Tender documents.
19 documents required · 19 mandatory
₹1,000
Yes
₹31,100
Yes
6 Feb 2026
17 Dec 2024
20 Feb 2025
17 Dec 2024
17 Feb 2025
17 Dec 2024
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid