| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAdmitted-Finance | ₹18.7 L | L1 | Admitted-Finance |
| 2 | L2₹20.2 L+₹1.5 L (7.85%)Admitted-Finance | ₹20.2 L+₹1.5 L (7.85%) | L2 | Admitted-Finance |
| 3 | L3₹20.5 L+₹1.8 L (9.50%)Admitted-Finance | ₹20.5 L+₹1.8 L (9.50%) | L3 | Admitted-Finance |
| 4 | L4₹22.2 L+₹3.5 L (18.7%)Admitted-Finance | ₹22.2 L+₹3.5 L (18.7%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S NASIRUDEEN CONTRACTOR L2 | TIGER CONSTRUCTION COMPANY L3 | JITENDRA ENGINEERING WORKS L1 | M/S KISHAN LAL SAINI L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | REINFORCED CEMENT CONCRETE WORK IN RAFTS, FOOTING, BASES OF COLOUMNS ETC AND MASS CONCRETE EXCLUDING COST OF CENTERING, SHUTTERING AND REINFORCEMENT : 1:2:4(1 CEMENT: 2 COARSE SAND: 4 GRADED STONE AGGREGATE 20 MM NOMINAL SIZE) | 30 | CUM | 1,50,000 ₹1,77,000 | 1,50,000 ₹1,77,000 | 42,000 ₹49,560 Lowest | 1,80,000 ₹2,12,400 |
| 2.00 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Cold twisted bars | 1,400 | KG | 1,26,000 ₹1,48,680 | 49,000 ₹57,820 Lowest | 84,000 ₹99,120 | 1,12,000 ₹1,32,160 |
| 3.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 150 | SQM | 45,000 ₹53,100 | 3,000 ₹3,540 Lowest | 80,250 ₹94,695 | 52,500 ₹61,950 |
| 4.00 | Deployment of JCB for removing SILT or handeling of EARTH | 100 | HRS | 1,20,000 ₹1,41,600 | 1,50,000 ₹1,77,000 | 1,00,000 ₹1,18,000 Lowest | 1,20,000 ₹1,41,600 |
| 5.00 | daily petrolling & maintenance of water supply pipe line within a radius of 35 kilometer from kcc with the help one plumber pipe fitter and one helper as per the direction of engineer in charge | 1 | LS | 8,00,000 ₹9,44,000 Lowest | 10,00,000 ₹11,80,000 | 9,20,000 ₹10,85,600 | 9,60,000 ₹11,32,800 |
| 6.00 | Laying of old/newMS/CI/GI pipe lines o all classes with welded flanged sockets joints including fabrication of bend, flanges expansion joints etc. connected with the laying o pipe line at all heightsc) Pipe 5" to 8" N.B Size | 200 | METRE | 40,000 ₹47,200 | 16,000 ₹18,880 Lowest | 22,000 ₹25,960 | 80,000 ₹94,400 |
| 7.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up | 320 | CUM | 96,000 ₹1,13,280 | 35,200 ₹41,536 Lowest | 41,600 ₹49,088 | 80,000 ₹94,400 |
| 8.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 20 | CUM | 1,00,000 ₹1,18,000 | 1,00,000 ₹1,18,000 | 86,000 ₹1,01,480 Lowest | 1,10,000 ₹1,29,800 |
| 9.00 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with :Cement mortar 1:6 (1 | 30 | CUM | 1,35,000 ₹1,59,300 | 1,50,000 ₹1,77,000 | 1,36,500 ₹1,61,070 | 90,000 ₹1,06,200 Lowest |
| 10.00 | hire charges of electrical generator 1 kva, welding m/c, welder for welding over water supply pipeline, for full day including diesel charges and welding rod | 50 | DAY | 1,00,000 ₹1,18,000 | 85,000 ₹1,00,300 | 75,000 ₹88,500 Lowest | 1,00,000 ₹1,18,000 |
Tender Value
₹14.5 L
EMD Value
₹29,000
Closing Date
26 Dec 2025, 6:00 pmClosed
SAURABH CHATURVEDI
HCL/KCC
ARC for daily patrolling of water supply pipeline within a radius of 35 KM from KCC during 2025-27.
2025_HCL_258130_1
RFQ 11775-ARC for daily patrolling of water supply pipeline within a radius of 35 KM from KCC during
Open Tender
Civil Works - Others
Fixed-rate
730 days
HCL/KCC
Enclosed in annexure
7 documents required · 7 mandatory
₹0
₹29,000
Yes
24 Feb 2026
5 Dec 2025
29 Dec 2025
5 Dec 2025
26 Dec 2025
5 Dec 2025
5 Dec 2025 - 25 Dec 2025
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Cold twisted bars
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
Deployment of JCB for removing SILT or handeling of EARTH
Laying of old/newMS/CI/GI pipe lines o all classes with welded flanged sockets joints including fabrication of bend, flanges expansion joints etc. connected with the laying o pipe line at all heightsc) Pipe 5" to 8" N.B Size
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_297924.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .