Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹79,866.08Admitted-Fee/PreQual/Technical/Finance | -17.75% | ₹79,866.08 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹84,565.80+₹4,699.72 (5.88%)Admitted-Fee/PreQual/Technical/Finance | -12.91% | ₹84,565.80+₹4,699.72 (5.88%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹94,178.86+₹14,312.78 (17.9%)Admitted-Fee/PreQual/Technical/Finance | -3.01% | ₹94,178.86+₹14,312.78 (17.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹97,100
EMD Value
₹1,942
Closing Date
8 Sept 2026, 6:00 pmClosed
Executive Engineer REW Doda
Office of the Executive Engineer REW Doda
Drain and Waling backside HO Junaid Wani w.no 7 Pyt Lower Arnora Block Ghat (PRIs Grant) 2nd Call
2026_RDPR_322884_12
e-NIT No 93 of REW Doda 2026-27 Dated.31.08.2026
Open Tender
Civil Works
Percentage
30 days
Doda
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹1,942
12 Sept 2026
31 Aug 2026
9 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 5.4 | Cum | 592.9 | ₹3,201.66 |
| 0.0 | Dry stone pitching (any thickness) including cost of stones. On Horizontal | 0.33 | Cum | 1,235.55 | ₹407.73 |
| 0.0 | Dr stone Filling (Plum) | 4.54 | Cum | 900 | ₹4,086 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 11.57 | Cum | 5,673.4 | ₹65,641.24 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 23.76 | Sqm | 286.35 | ₹6,803.68 |
| 0.0 | Carriage of sand & Bajri | 15.74 | Cum | 584.96 | ₹9,207.27 |
| 0.0 | Carriage of Stone | 4.87 | Cum | 668.18 | ₹3,254.04 |
| 0.0 | CIB (citizen information Board ) size 2'6"x3'6"x0'9" (above plinth level) with tepered top having 20 degree slope in Brick Masonary(1:4) including plaster , paint, lettering and logos as per instruction of Engineer -in-charge including carriage of material. ( complete job) | 1 | Nos | 4,500 | ₹4,500 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_1085147.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .