| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.2 LAdmitted-Finance | -0.20% | ₹17.2 L | L1 | Admitted-Finance |
| 2 | L2₹17.2 LAdmitted-Finance | -0.10% | ₹17.2 L | L2 | Admitted-Finance |
Tender Value
₹17.4 L
EMD Value
₹34,700
Closing Date
21 May 2026, 12:00 pmClosed
EE RED Jaunpur, Vikas Bhawan, Jaunpur
EE RED Jaunpur, Vikas Bhawan, Jaunpur
Under District Jaunpur, Construction of waiting room for general public in Collectorate premises, Lot No 1
2026_REDUP_1149148_1
126/EE RED Jaunpur/25-26 Dt 09/04/2026
Open Tender
Civil Works
90 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹34,700
EE RED Jaunpur, Vikas Bhawan, Jaunpur
5 Jun 2026
16 May 2026
21 May 2026
16 May 2026
21 May 2026
16 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil as per SI.No. 2.8.1 | 17.34 | Cum | 181.75 | ₹3,151.55 | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) As per SI no. 4.1.8 | 1.73 | Cum | 4,756.48 | ₹8,228.71 | |
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) as SI No-5.1.2 | 4.48 | Cum | 6,316.2 | ₹28,296.58 | |
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Above Plinth Lvl as SI No-5.2.2 | 4.72 | Cum | 7,578.07 | ₹35,768.49 | |
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). Above Plinth Lvl as SI No-5.3 | 28.99 | Cum | 8,033.71 | ₹2,32,897.25 | |
Steel reinforcement for R.C.C. work ready to use "cut and bend" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete in Thermo-Mechanically Treated bars of grade Fe-500D or more. As per SI. No.- 5.22 B.1 | 52.53 | Qtl. | 6,958.07 | ₹3,65,507.42 | |
Brick work with common burnt clay bricks of M-150 Class in super structure above plinth level upto floor V level in all shapes and sizes in cement mortar 1:4 (1 cement : 4 coarse sand ) as per SI no 6.13.2 | 25.26 | Sqm | 784.69 | ₹19,821.27 | |
Brick work with common burnt clay bricks of M-150 Class in super structure above plinth level upto floor V level in all shapes and sizes in cement mortar 1:6 ( 1 cement : 6 coarse sand ) as per SI no 6.4.2 | 21.86 | Cum | 6,358.23 | ₹1,38,990.91 | |
15 mm thick cement plaster of mix 1:6 ( 1 cement & 6 course sand ) Inner Side as per IS 13.5.2 | 160.12 | Sqm | 276.05 | ₹44,201.13 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_2151230.xls
BOQ • 0.38 MB
Jaunpur_SBD.pdf
Tender Documents • 2.11 MB
Download all tender documents and submit your bid