Tender Value
₹4.6 Cr
EMD Value
₹9.2 L
Closing Date
7 Sept 2026, 6:00 pm
SE PWD North Jammu, Lok Nirman Bawan
Office of the SUPERINTENDING ENGINEER PWD(R and B) NORTH CIRCLE JAMMU, Lok Nirman Bawan Jammu.
Lanes/Drains. Beautification and Protection works in different wards of Khour Town Capex Budget 2026-27 New Works
2026_PWDJK_321177_1
E-NIT No. SENJ/16 of 2026-27 dated 14-08-2026
Open Tender
Civil Works
Percentage
272 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
Superintending Engineer PWD Circle North Jammu
₹9.2 L
Office of the SE PWD North Jammu, Lok Nirman Bawan
17 Aug 2026
17 Aug 2026
8 Sept 2026
17 Aug 2026
7 Sept 2026
17 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling doors, windows and clerestory windows (steel or wood)
shutter including chowkhats, architrave, holdfasts etc. complete and
stacking within 50 meters lead : Of area of 3 sqm. and below | 35 | each | 285.25 | ₹9,983.75 |
| 2 | Dismantling doors, windows and clerestory windows (steel or wood)
shutter including chowkhats, architrave, holdfasts etc. complete and
stacking within 50 meters lead :Of area of 3 sqm. Above | 20 | each | 390.5 | ₹7,810 |
| 3 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge in cement Mortar. | 13 | cum | 1,458.45 | ₹18,959.85 |
| 4 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead.For thickness of tiles above 25 mm and upto 40 mm | 1,600 | sqm | 89.95 | ₹1,43,920 |
| 5 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 32 | cum | 1,725.2 | ₹55,206.4 |
| 6 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 9 | cum | 2,516.85 | ₹22,651.65 |
| 7 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed AKOS | 1,277 | cum | 479.3 | ₹6,12,066.1 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 600 | cum | 4,826.5 | ₹28,95,900 |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 994 | cum | 5,733.6 | ₹56,99,198.4 |
| 10 | P/Laying of reinforced cement concrete work in foundation upto plinth level incl. curing the curing but excl the cost of centring and shuteering in Mix 1:1.5:3 mix | 157 | cum | 7,788.4 | ₹12,22,778.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_1071516.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].