Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | IIIrd₹12.1 LAccepted-AOC | IIIrd | Accepted-AOC L1 | |
| 2 | Ist₹12.1 LRejected-AOC | Ist | Rejected-AOC L2 | |
| 3 | Iind₹12.1 LRejected-AOC | Iind | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹13,000
Closing Date
5 Apr 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-I, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj
116-ETC-I(A)/ 2020-2021
2021_UPTCL_569039_1
116-ETC-I(A)/ 2020-2021
Open Tender
Electrical Works
Item Rate
60 days
Phulpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
SE,ETC,PRAYAGRAJ
₹13,000
2 Nov 2021
13 Mar 2021
6 Apr 2021
13 Mar 2021
5 Apr 2021
13 Mar 2021
120 days
Amount
Following works are to be Carried out for the Work of Replacement of damaged Gasket of 160MVA T/F-II (AREVA make) alongwith other associated works with all cost of Men , Materials, Misc Consumables, Crane / Hydra, Normal & Special T&Ps, Rails etc. required for Satisfactory Completion of work, as per Technical Specification & direction of the J.E / A.E as per details below :
Safe transportation of 50KL oil tank from 220KV S/S Rewa Road to 220KV S/S Phulpur having distance approx. 55Kms. Work includes shifting and loading of Oil Tank with the help of Hydra / Crane at 220KV S/S Rewa Road, safe transportation and unloading of it at working site near 160MVA T/F-I at 220KV S/S Phulpur with the help of Hydra / Crane.
Partially dismantling & safe stacking of Mulsifire air Pipe line, water pipe line and proper stacking.
Complete drain out of the Transformer Oil from 160MVA T/F tank into 50KL Oil Tank including opening of valve and filling in Oil Tank.
Dismantling of 160 MVA T/F HV/LV/TV/Neutral Bushing and its Turret, opening of all pipe line inlet/Outlet valve , inspection cover, Radiator Header, Gear box, Buchholz relay, PRV, Oil pump, NRV for replacement of Gasket.
Providing and making of Top Cover Gasket of Transformer, Opening of Nut & Bolt, and removal of damage Gasket cleaning of top surface & making new Gasket & fixing in proper Gasket.
Replacement of Old and damaged gasket from different parts of the Transformers. The scope of works involves removal of Gaskets, Cleaning of surface, Fabrication of Gaskets of appropriate size of Konica /Telbroze/NE cork make and fixing of Gaskets at proper place with adhesive along with other associated works as per details given below-
Providing and making of HV Turret Gasket.
Providing and making of HV Bushing Gasket.
Providing and making of IV Turret Gasket.
Providing and making of IV Bushing Gasket.
Providing and making of Radiator Gasket.
Providing and making of Radiator Valve Gasket.
Providing and making of Gasket of inspection cover.
Providing and making of Gasket of 6” butter fly valve.
Providing and making of Radiator pipe line 6” dia.
Providing and making of C.T. inspection cover HV
Providing and making of C.T. inspection cover LV
Providing and making of C.T. inspection cover N
Providing and making of 1” Dia pipe line Gasket.
Providing and making of Surge Relay Gasket.
Providing and making of Gasket Buchholz Relay.
Providing and making of Gasket of PRV
Providing and making of OLTC plate.
Providing and making of 1” dia Valve Gasket.
Providing and making of 2” dia Valve Gasket.
Providing and making of 4” dia Valve Gasket.
Providing and making of TV Bushing Gasket.
Providing and making of N Bushing Gasket.
Providing and making of Flow indicator Gasket.
Providing and making of Gasket of oil pump
Providing and making of Gasket 3” dia Valve.
Providing and making of Gasket WTI / OTI Pocket.
Providing and making of Gasket of header.
Providing and making of Gasket of conservator tank.
Providing and making of Gasket of OLTC tank.
Providing and making of nylon washer of radiator, Bushing, Air releasing plugs.
Providing and making of Gasket of NRV
Providing and making of Gasket of MOG.
Replacement of different nut & bolts of main tank oil Pipe line.
Overhauling of diverter switch, removal the diverter switch from chamber cleaning by hot Oil, removed the dirty oil and proper cleaning and fixing in original shape.
Erection of Turret HV / LV / IV side and erection of Bushing, Radiator, Header, Oil Pipe Line 6”, and 3”, Gear box, OLTC Pipe Line, Pump, Flow meter, Inspection Cover etc. for complete of work.
Performing the vacuum stand test. Scope of work involves creating the vacuum inside the transformer upto 760mm of Hg for evacuation of moisture from core & winding and maintaining the pressure at least 72 hours.
Complete Evacuation of main tank and Filling of Dry Nitrogen of dew Point -50°C or better in Vacuum up to Pressure of 0.25 Kg / Cm² and the again evacuating the Transformer Tank after Required Time Interval (approx. 12 Hrs.) using Centrifuging Machine. The Work shall include connecting Pipes of Machine as Required and Measuring Due Point Values of N2 after every Cycle till the Required Value is Achieved.
Centrifuging of T/F Oil in Oil Storage Tanks, un-interrupted till the desired BDV & PPM Value of the Oil is achieved and then Filling & Topping up of the Centrifuged T/F Oil in Transformer as per Standard Procedure to Maintain required Oil Level in the Transformer including Commissioning of Air Cell if required. Centrifuging & Circulation of T/F Oil in Transformer, un-interrupted till the desired BDV&PPM Value of the Oil & IR Values of Bushings are achieved including Hourly Recording all the Parameters such as Temp., Vacuum, Insulation Resistance etc. Centrifuging Machine, its Operator and all associated T&Ps shall be arranged by the Contractor at his own cost.
Filling of the transformer oil into main tank and radiators from oil tanks under vaccum after performing vacuum stand test successfully.
Jumpering of HV/LV side bushing of the transformer. The scope of work involving tightening of bushing clamps with appropriate sizes of Bolts & Nuts including replacement of clamps, jumpers as required. (cost include all labour and T&P but excluding the cost of jumper, clamp, bolts/nuts which shall be provided by UPPTCL free of cost)
Erection of Mulsifire System, Air / Water Pipe Lines, Proper replacement of Gasket and Tightening of Nut & Bolts.
Safe transportation of 50KL oil tank from 220KV S/S Phulpur to 220KV S/S Rewa Road having distance approx. 55Kms. Work includes shifting and loading of Oil Tank with the help of Hydra / Crane at 220KV S/S Phulpur, safe transportation and unloading of it at storage place at 220KV S/S Rewa Road with the help of Hydra / Crane.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .