Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-Finance GRAM KAKNA POST JAITPUR SAHJANWAN DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹1.7 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.7 CrRejected-Finance B 62 TEZ KUMAR PLAZA TRILOKI NATH ROAD HAZRATGANJ LUCKNOW UTTAR PRADESH 226001 UDYAM UP 50 0055899 | LUCKNOW | UTTAR PRADESH | 226001 | ₹1.7 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.7 CrRejected-Finance VILLAGE BASIA POST SAHJANWAN THANA SAHJANWAN DISTRICT GORAKHPUR UTTAR PRADESH PIN 273209 | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273209 | ₹1.7 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹1.8 CrRejected-Finance | ₹1.8 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹2.0 CrRejected-Finance CIVIL LINE THANA KOTWALI DISTRICT BASTI | GONDA | UTTAR PRADESH | 271305 | ₹2.0 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S BABA TRADERS L4 | M/S Damyanti Singh L3 | M/S ARPNA CONSTRUCTION L1 | M/S BHAGWATI TRADERS L5 | AKANKSHA ASSOCIATES L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in removing existing canal section in all type of soil with all lead ,lift & proper disposal of earth and back filling etc. required for proper completion of the work. | 709.21 | M3 | 60 ₹42,552.30 | 50 ₹35,460.25 | 55 ₹39,006.28 | 69.91 ₹49,580.52 | 58.12 ₹41,222.54 |
| 2.00 | Earth work in excavation of foundation in all type of soil including all lead, &lift , proper disposal of earth as per direction of site Enginner and back filling etc.required fo proper complection of the work. | 3,919.37 | M3 | 75 ₹2.9 L | 60.1 ₹2.4 L | 78 ₹3.1 L | 96.6 ₹3.8 L | 79.83 ₹3.1 L |
| 3.00 | Centering & shuttering of P C.C. 1:2:4 (M-15) in foundation including cost of all material, labour, T&P etc.required for proper completion of the work. | 628.97 | M2 | 200 ₹1.3 L | 156 ₹98,119.32 | 140 ₹88,055.80 | 199.78 ₹1.3 L | 162.75 ₹1.0 L |
| 4.00 | Laying P C.C. 1:2:4 ( M-15) in foundation with 10 to 20 mm size crushed stone grit & coarse sand having F.M not less than 2.0 including cost of all material , labour and T&P etc .required for proper completion of the work. | 163.17 | M3 | 8,500 ₹13.9 L | 8,900 ₹14.5 L | 8,700 ₹14.2 L | 10,817.16 ₹17.7 L | 8,894.67 ₹14.5 L |
| 5.00 | Centering & shuttering for R.C.C work ( M25) including cost of all material , labour and T&P etc .required for proper completion of the work | 1,277.49 | M2 | 550 ₹7.0 L | 703 ₹9.0 L | 760 ₹9.7 L | 831.16 ₹10.6 L | 775 ₹9.9 L |
| 6.00 | Laying R C.C. 1:1.5:3 ( M-20) in wing wall super structure work(excluding wing wall raft) with 4.75 to 20 mm size crused stone grit & coarse sand having F.M not less than 2.0 including cost of all material , labour and T&P etc .required for proper completion of the work | 243.2 | M3 | 9,500 ₹23.1 L | 9,000 ₹21.9 L | 8,764 ₹21.3 L | 10,949.8 ₹26.6 L | 8,873.75 ₹21.6 L |
| 7.00 | laying R.C.C. 1: 1: 2 ( M25 ) in raft,pier abutment ,slab & parapet with 4.75 to 20 mm size crushed stone grit & coarse sand having F.M not less than 2.0 including cost of all material , labour and T&P etc .required for proper completion of the work | 869.73 | M3 | 9,950 ₹86.5 L | 9,650 ₹83.9 L | 9,230 ₹80.3 L | 11,411.51 ₹99.2 L | 9,365.1 ₹81.5 L |
| 8.00 | Cutting, bending, binding and placing steel of reinforcement including cost of binding wire and cost of steel, labour,T&P etc. required for proper completion of the work. | 55.26 | MT | 65,000 ₹35.9 L | 61,200 ₹33.8 L | 53,000 ₹29.3 L | 65,700 ₹36.3 L | 50,917.5 ₹28.1 L |
| 9.00 | laying R.C.C. 1: 1: 2 ( M25 ) in weaing coat with 4.75 to 10 mm size crushed stone grit & coarse sand having F.M not less than 2.0 including cost of all material , labour and T&P etc .required for proper completion of the work. | 9.8 | M3 | 10,000 ₹97,980 | 9,610 ₹94,158.78 | 8,763 ₹85,859.87 | 10,684.19 ₹1.0 L | 9,055.1 ₹88,721.87 |
| 10.00 | Providing Expansion joint in bridge slab as per design placing and fixing of angle iron & ms plate drawing including cost of all material, labour and T&P etc. required for proper completion of the work. | 24.64 | RM. | 580 ₹14,291.20 | 465 ₹11,457.60 | 410 ₹10,102.40 | 521.18 ₹12,841.88 | 452.6 ₹11,152.06 |
Tender Value
₹2.2 Cr
EMD Value
₹4.3 L
Closing Date
17 Mar 2026, 4:30 pmClosed
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
Construction of Cross Regulator at Km 65.700 of Khalilabad Branch.
2026_UPIDC_1119556_4
10/S.E/2025-26
Open Tender
Civil Works
300 days
Khalilabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,541
₹4.3 L
20 Mar 2026
10 Mar 2026
17 Mar 2026
10 Mar 2026
17 Mar 2026
10 Mar 2026
Earth work in removing existing canal section in all type of soil with all lead ,lift & proper disposal of earth and back filling etc. required for proper completion of the work.
Earth work in excavation of foundation in all type of soil including all lead, &lift , proper disposal of earth as per direction of site Enginner and back filling etc.required fo proper complection of the work.
Centering & shuttering of P C.C. 1:2:4 (M-15) in foundation including cost of all material, labour, T&P etc.required for proper completion of the work.
Laying P C.C. 1:2:4 ( M-15) in foundation with 10 to 20 mm size crushed stone grit & coarse sand having F.M not less than 2.0 including cost of all material , labour and T&P etc .required for proper completion of the work.
Centering & shuttering for R.C.C work ( M25) including cost of all material , labour and T&P etc .required for proper completion of the work
Laying R C.C. 1:1.5:3 ( M-20) in wing wall super structure work(excluding wing wall raft) with 4.75 to 20 mm size crused stone grit & coarse sand having F.M not less than 2.0 including cost of all material , labour and T&P etc .required for proper completion of the work
laying R.C.C. 1: 1: 2 ( M25 ) in raft,pier abutment ,slab & parapet with 4.75 to 20 mm size crushed stone grit & coarse sand having F.M not less than 2.0 including cost of all material , labour and T&P etc .required for proper completion of the work
Cutting, bending, binding and placing steel of reinforcement including cost of binding wire and cost of steel, labour,T&P etc. required for proper completion of the work.
laying R.C.C. 1: 1: 2 ( M25 ) in weaing coat with 4.75 to 10 mm size crushed stone grit & coarse sand having F.M not less than 2.0 including cost of all material , labour and T&P etc .required for proper completion of the work.
Providing Expansion joint in bridge slab as per design placing and fixing of angle iron & ms plate drawing including cost of all material, labour and T&P etc. required for proper completion of the work.
Supply &laying one layer tarfelt over bed block beforecasting of slab including cost of all material, labour and T&P etc. required for proper completion of the work.
S/F 75 mm dia PVC spout pipe including cost of all material , labour and T&P etc .required for proper completion of the work.
S/F 50 mm dia drain PVC pipe including cost of all material, labour and T&P etc .required for proper completion of the work.
S/ laying boulder 40-60 kg by weight including cost of boulder, labour and T&P etc .required for proper completion of the work
S/F PVC Water stop seal including cost of all material, labour and T&P etc .required for proper completion of the work.
S/laying of local sand (graded filter material ) including cost of all material , labour and T&P etc .required for proper completion of the work.
S/laying 20-40 mm size crushed stone grit ( graded filter material ) including cost of all material , labour, T&P etc .required for proper completion of the work.
S/laying 10-20 mm size crushed stone grit (graded filter material) including cost of all material , labour , T&P etc .required for proper completion of the work.
Earth work in making ramp in all type soil including all lead & lift,T&P mannual compaction and dressing to profile.
providing and filling in position bitumen mix filler of proportion 80 kg of hot bitumen 1 kg cement and 0.25 cum of coarse sanfd in expantion joint in width.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.49 MB
Buklet.pdf
Tender Documents • 7.77 MB
BOQ_2092467.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid