| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC KHALINI DISTT SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹7.9 L Quoted ₹8.3 L | L1 | Accepted-AOC The rates quoted by the contractor are lowest, hence accepted. |
| 2 | L2₹8.8 LRejected-Finance | ₹8.8 L | L2 | Rejected-Finance The rates quoted by the contractor are on the higher side, hence rejected. |
| 3 | L3₹9.0 LRejected-Finance | ₹9.0 L | L3 | Rejected-Finance The rates quoted by the contractor are on the higher side, hence rejected. |
| Sl No | Description | Qty | Unit | P K Construction Shimla Pvt Ltd L1 | Ajay Kumar Sood Engineers and Contractors L3 | BUILDWELL CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Stone soling properly hand packed filling interstices with kharanja stone and consolidating with power road roller to the required gradient and comber including spreading, watering and rolling of binding materials moorum or earth etc. complete as per HPPWD specification. 100mm spread thickness (finished work including materials and labour) | 9 | P.Cum | 2,200 ₹19,800 | 2,500 ₹22,500 | 2,800 ₹25,200 |
| 2.00 | Preparation of surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. Water bound macadam surface (new) | 935.67 | P.Sqm | 5 ₹4,678.35 | 15 ₹14,035.05 | 10 ₹9,356.70 |
| 3.00 | Preparing surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. Black top surfaces | 935.67 | P.Sqm | 5 ₹4,678.35 | 15 ₹14,035.05 | 10 ₹9,356.70 |
| 4.00 | Providing and applycing tack coat with Bitumen VG10 using distributor at the rate of 1 kg per sqm | 935.67 | P.Sqm | 65 ₹60,818.55 | 75 ₹70,175.25 | 70 ₹65,496.90 |
| 5.00 | Providing and applycing tack coat with Bitumen VG10 using distributor at the rate of 0.50 kg per sqm | 935.67 | P.Sqm | 35 ₹32,748.45 | 40 ₹37,426.80 | 45 ₹42,105.15 |
| 6.00 | Providing and laying bituminous concrete 30 mm thick (Thirty millimetre) with TPH batch type hot mix plant producing an average output of 75 tonnes per hour suing crushed aggregates of specified grading, premixed with bituminous binder VG-10 @ 5.4 to 5.6 per cent of mix and filler having anti stripping agent such as "Eva thermo" or equivalent mixed in [email protected]% of quantity of bitumen transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rooling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No.509 complete in all respects | 935.67 | P.Sqm | 479 ₹4.5 L | 490 ₹4.6 L | 490 ₹4.6 L |
| 7.00 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, 50 to 100 mm average compacted thickness | 22.27 | P.Cum | 11,500 ₹2.6 L | 12,500 ₹2.8 L | 12,000 ₹2.7 L |
Tender Value
₹9.2 L
EMD Value
₹18,500
Closing Date
11 Nov 2025, 5:00 pmClosed
Executive Engineer R B M C Shimla
Executive Engineer R B M C Shimla
Resurfacing of various roads 1 MC Main Road to Bansal Niwas RD 0 00 to 0 3550 mtrs and 2 MC Main Road to Aryan Lodge RD 0 00 to 0 200 mtrs in ward No 32 New Shimla
2025_MC_119560_3
2378dated31102025
Open Tender
Civil Works
60 days
Shimla
Please refer to tender documents
7 documents required · 7 mandatory
₹413
Executive Engineer R B M C Shimla
₹18,500
28 Jan 2026
3 Nov 2025
12 Nov 2025
3 Nov 2025
11 Nov 2025
3 Nov 2025
Amount
Stone soling properly hand packed filling interstices with kharanja stone and consolidating with power road roller to the required gradient and comber including spreading, watering and rolling of binding materials moorum or earth etc. complete as per HPPWD specification. 100mm spread thickness (finished work including materials and labour)
Preparation of surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. Water bound macadam surface (new)
Preparing surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. Black top surfaces
Providing and applycing tack coat with Bitumen VG10 using distributor at the rate of 1 kg per sqm
Providing and applycing tack coat with Bitumen VG10 using distributor at the rate of 0.50 kg per sqm
Providing and laying bituminous concrete 30 mm thick (Thirty millimetre) with TPH batch type hot mix plant producing an average output of 75 tonnes per hour suing crushed aggregates of specified grading, premixed with bituminous binder VG-10 @ 5.4 to 5.6 per cent of mix and filler having anti stripping agent such as "Eva thermo" or equivalent mixed in [email protected]% of quantity of bitumen transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rooling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No.509 complete in all respects
Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, 50 to 100 mm average compacted thickness
BUILDWELL CONSTRUCTION (BID ID -580462)
Ajay Kumar Sood Engineers and Contractors (BID ID -580376)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.72 MB
Tendernotice_2.pdf
PDF • 0.70 MB
Tendernotice_3.pdf
PDF • 0.35 MB
BOQ_175079.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid