| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.0 CrAccepted-Finance | ₹58.0 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹61.2 CrRejected-Finance | ₹61.2 Cr | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | M/S ANMOL ASSOCIATES L2 | M/S SRI BHAWAN L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. Including cost of material labour and T&P including all taxes but excluding cost of GST. | 60,000 | Sqm | 2.6 ₹1.6 L | 2 ₹1.2 L |
| 2.00 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Inter Locking). Including cost of material labour and T&P including all taxes but excluding cost of GST. | 7,920 | Cum | 360 ₹28.5 L | 336 ₹26.6 L |
| 3.00 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (PCC). Including cost of material labour and T&P including all taxes but excluding cost of GST. | 9,900 | Cum | 670 ₹66.3 L | 623 ₹61.7 L |
| 4.00 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (GSB). Including cost of material labour and T&P including all taxes but excluding cost of GST. | 9,900 | Cum | 84 ₹8.3 L | 78 ₹7.7 L |
| 5.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. Including cost of material labour and T&P including all taxes but excluding cost of GST. | 54,549 | Cum | 58 ₹31.6 L | 55 ₹30.0 L |
| 6.00 | Construction of embankment with approved material obtained from local pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 64,124 | Cum | 130 ₹83.4 L | 121 ₹77.6 L |
| 7.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Only compaction). Including cost of material labour and T&P including all taxes but excluding cost of GST. | 54,549 | Cum | 70 ₹38.2 L | 66 ₹36.0 L |
| 8.00 | Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 2 per cent slaked lime having minimum content of 70 per cent of CaO, grading with motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved sub grade. Including cost of material labour and T&P including all taxes but excluding cost of GST. | 1,25,620 | Cum | 540 ₹6.8 Cr | 525 ₹6.6 Cr |
| 9.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Excluding cost of Material). Including cost of material labour and T&P including all taxes but excluding cost of GST. | 5,940 | Cum | 1,250 ₹74.3 L | 1,168 ₹69.4 L |
| 10.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Including cost of material labour and T&P including all taxes but excluding cost of GST. | 45,631.96 | Cum | 3,050 ₹13.9 Cr | 2,893 ₹13.2 Cr |
Tender Value
₹59.2 Cr
EMD Value
₹59.1 L
Closing Date
18 Feb 2026, 12:00 pmClosed
S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
In District Jalaun Widening of Rath Kalpi Madaripur road (SH-130) in Km- 29.350 to 51.350 (Length 22.00 Km.)
2026_CEJNS_1114635_1
769/44 C-Jhansi Circle/25-26 Date 30.01.2026
Open Tender
Civil Works - Roads
455 days
Orai (Jalaun)
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,950
₹59.1 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
21 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
13 Feb 2026
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Inter Locking). Including cost of material labour and T&P including all taxes but excluding cost of GST.
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (PCC). Including cost of material labour and T&P including all taxes but excluding cost of GST.
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (GSB). Including cost of material labour and T&P including all taxes but excluding cost of GST.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Construction of embankment with approved material obtained from local pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Only compaction). Including cost of material labour and T&P including all taxes but excluding cost of GST.
Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 2 per cent slaked lime having minimum content of 70 per cent of CaO, grading with motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved sub grade. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Excluding cost of Material). Including cost of material labour and T&P including all taxes but excluding cost of GST.
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not less than 150 kg per cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approved grade cement @ 400 kg per cum, Coarse sand fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, admixtures as approved, curing compound, and providing tie rod by drilling of holes for tie rod and injecting resin based epoxy finishing to lines and grades as per drawing. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Mild steel for iron in plain work such as reinforced concrte or reinforced brick work wrough to required shape as necessary including being for proper completion of work and including supply of all steel and wastage and wastage & overlapping & hooks.S.I. No- 504. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Cartage up to 2.00 km). Including cost of material labour and T&P including all taxes but excluding cost of GST.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Providing and laying 80 mm thick interlocking tiles with all materials labour T&P complete. Ch-14 New Item no- 3 (Old Interlocking Used) As per S.I. No-Ch- 4 New Item No-3. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with .Including cost of material labour and T&P including all taxes but excluding cost of GST.
Sand Filling in Foundation Trenches as per Drawing & Technical Specification. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Including cost of material labour and T&P including all taxes but excluding cost of GST.
PCC Grade M25 using batching plant transit mixer & manual placing. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Mild steel for iron in plain work such as reinforced concrte or reinforced brick work wrough to required shape as necessary including being for proper completion of work and including supply of all steel and wastage and wastage & overlapping & hooks. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications. Including cost of material labour and T&P including all taxes but excluding cost of GST.
R.C.C work with cement approved coarse sand in 2 cm gauge, approved stone ballast in the proportion of 1:1.5:3 in Bed block, slab and wearing coat . excluding supply of reinforcement Including cost of material labour and T&P including all taxes but excluding cost of GST.
12 mm Cement plaster in single coat on fair side of single or half brick wall for interior plastering upto floor two level including internal rounded angles not exceeding 80 mm. In girth and finished even and smooth. No extra for mixing any additive. Including cost of material labour and T&P including all taxes but excluding cost of GST. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification . Including cost of material labour and T&P including all taxes but excluding cost of GST.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Supply & Fixing ,jointingof 1000 mm dia NP-3 hume pipe cost of all material, loading, unloading, stacking, cartage etc. for completion of work. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Supply & Fixing ,jointingof 600 mm dia NP-3 hume pipe cost of all material, loading, unloading, stacking, cartage etc. for completion of work.. Including cost of material labour and T&P including all taxes but excluding cost of GST.
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications . Including cost of material labour and T&P including all taxes but excluding cost of GST.
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0.00% Construction Cost) (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.25% Construction Cost) (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (0.50% Construction Cost) (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (0.75% Construction Cost) (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (1.00% Construction Cost) (Excluding GST)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
SBD.pdf
Tender Documents • 1.67 MB
BOQ_2067239.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid