DGM(T) Material
Room No.- 09, Ground Floor, Maintenance Block, Indraprastha, Near 220 kV Substation IP Station, New Delhi
Design and ETC of 04 Nos. 25 MVA, 33/11 kV Transformer including dismantling of existing 02 Nos. 20 MVA and 02 Nos. 16 MVA, Transformers with associated civil work at 220 kV Sub-Station, Lodhi Road on turnkey basis (Risk and Cost Purchase basis)
2026_DTL_288852_1
T25P090671
Open Tender
Electrical Works
Turn-key
365 days
New Delhi
As per tender document
12 documents required · 12 mandatory
₹0
₹14.3 L
Yes
In the o/o GM(T) CMM
8 May 2026
23 Mar 2026
8 May 2026
23 Mar 2026
8 May 2026
23 Mar 2026
2 Apr 2026
Design, Supply, Erection, Testing & Commissioning of 04 Nos. 25 MVA, 33/11kV Transformers including dismantling of existing 02 Nos. 20MVA and 02 Nos. 16 MVA Transformers with associated civil works at 220kV Sub Station, Lodhi Road on Turnkey Basis (Risk & Cost Purchase).
( Summary Price Proposal )
Bidder's Name & Address: To
DGM (T) Material
Room No. 9, Ground Floor,
Maintenance Block,
Old Indraprastha Power House
Near 220 KV Indraprastha Substation
New Delhi-11002
Email: [email protected]
We declare that in terms of Clause 12.0, Section-INB, Volume-I of Bidding Documents, the following are our lumpsum price in Rupees for the entire scope of work as specified in the specifications and the bidding documents.
A. Lumpsum Bid Price (excluding GST reimburseable and payable additionally by the owner as per B below)
(In figure) (In words)
(Summary price components of the Lumpsum Bid price are given in Schedule-2)
B. Applicable Taxes payable additionally, in respect of the transaction
between the Owner and the Contractor.
Total Goods & Service Tax : …………………….. estimated @ ______
C. Total Lumpsum Bid Price including GST, if the Contract is awarded to us
i.e. sum of A+B above……………...(in figures) and …………………....................................(in words).
Date: (Signature) …………………………..
Place: (Printed Name) …………………………..
(Designation) …………………………..
(Common Seal) …………………………..
Design, Supply, Erection, Testing & Commissioning of 04 Nos. 25 MVA, 33/11kV Transformers including dismantling of existing 02 Nos. 20MVA and 02 Nos. 16 MVA Transformers with associated civil works at 220kV Sub Station, Lodhi Road on Turnkey Basis (Risk & Cost Purchase).
( Summary Price Components )
Bidder's Name & Address: To
DGM (T) Material
Room No. 9, Ground Floor,
Maintenance Block,
Old Indraprastha Power House
Near 220 KV Indraprastha Substation
New Delhi-11002
Email: [email protected]
Summary price component for the above Sub-station Package as per the scope identified in accompanying Specifications.
Sl. No. Description Amount in Rs.
A. Total Equipment Ex-works Price (as per Schedule-3)
B. Total freight and Insurance & Incidental Charges (as per Schedule-4)
C. Total FOR site price [A+B]
D. Total Erection Charges including Civil Works(as per Schedule-5)
E. Total Bid Price = (C+D) in figures:
Amount of Taxes as applicable indicated at F below are not included in the Total Bid Price indicated at E.
F. Taxes/Duties/Levies additionally payable by the Owner:
Description of applicable Taxes/ Items Item Sl. No. as per Value of bid Total Amount
duties/ Levies Schedule-3, 4 & 5 price on which towards Tax/
Applicable (Rs.) Duty/ Levy (Rs.)
Goods & Service Tax
[As per Schedule 3 @ …………….
Goods & Service Tax
[As per Schedule 4 @ …………….
Goods & Service Tax
[As per Schedule 5 @ …………….
G. Total for Taxes & duties(F):
H. Total Bid Price including Taxes & Duties (E+G):
Date: (Signature) ………………………………..
Place: (Printed Name) ………………………………..
(Designation) ………………………………..
(Common Seal) ………………………………..
1 The figures given at E & F shall match with the lumpsum price and amount of taxes & duties given at Schedule-1
2 Itemwise break-up of the price/amount given in this schedule is indicated in Schedules 3, 4 & 5.
Design, Supply, Erection, Testing & Commissioning of 04 Nos. 25 MVA, 33/11kV Transformers including dismantling of existing 02 Nos. 20MVA and 02 Nos. 16 MVA Transformers with associated civil works at 220kV Sub Station, Lodhi Road on Turnkey Basis (Risk & Cost Purchase).
(Price Break-up of Base Price)
Bidder's Name & Address: To,
DGM (T) Material
Room No. 9, Ground Floor,
Maintenance Block,
Old Indraprastha Power House
Near 220 KV Indraprastha Substation
New Delhi-11002
Email: [email protected]
Price Break-up for individual items
(Bidder shall quote prices for the following mentioned items. Prices of all accessories, assemblies, components, parts etc. associated with these items are included in bidder's quoted prices for these items). (Prices in Rs.)
S.No. Description of Item HSN Code Whether HSN is confirmed.if not, indicate applicable HSN code Unit Qty BASE PRICE Mode of Transaction Direct/ Bought Out Taxes & Duties (Not included in Base Price Component)
Unit Price Total Price GST
Rate Whether rate of GST is confirmed.if not, indicate applicable rate of GST # Amount
1 25 MVA, 33/11kV Transformer along with OLTC and other accessories etc. 85042310 Nos. 4 0.18
2 Petty items to complete the job such as T-connectors, C-wedge connector, Clamps, GI nuts & bolts, Hexa blade, kerosin oil etc. 73082011 L/S 1 0.18
Total for Schedule 3 (1+2)
Note : 1. Bidder is required to quote prices in this Schedule for all the individual items/sub-items.
2. HSN Code shall be filled/confirmed by Bidder
3. In case of any ambiguity regarding text of items, description of items mentioned in BOQ, Section-Project, Vol.-II of NIT shall prevail.
4. # Specify amount of taxes,duties and levies as per GST Rules,payable on the transactions between contractor and employer as applicable for
destination site/state on all items of supply including bought-out finished items(to be identified in the contract),which shall be dispatched directly
from the Subvendor's works to the Employer's site (sale-in-transit), only.Taxes , duties and levies as per GST Rules for all the bought-out are to be included in the
base Price (Col. No.7) only and not to be indicated here.
Place : Printed Name _________________________
Design, Supply, Erection, Testing & Commissioning of 04 Nos. 25 MVA, 33/11kV Transformers including dismantling of existing 02 Nos. 20MVA and 02 Nos. 16 MVA Transformers with associated civil works at 220kV Sub Station, Lodhi Road on Turnkey Basis (Risk & Cost Purchase).
(Price Break-up of Freight, Insurance and Incidental Charges)
Bidder's Name & Address: To, DGM (T) Material
Room No. 9, Ground Floor,
Maintenance Block,
Old Indraprastha Power House
Near 220 KV Indraprastha Substation
New Delhi-11002
Email: [email protected]
Price Break-up for individual items
(Bidder shall quote prices for the following mentioned items. Prices of all accessories, assemblies, components, parts etc. associated with these items are included in bidder's quoted prices for these items). (Prices in Rs.)
S. No. Description of Item Unit Qty Freight Charges Insurance and Incidental Charges
SAC Code Whether SAC code is confirmed. If not, indicate applicable SAC code Unit Price Total Price Taxes & Duties SAC Code Whether SAC code is confirmed. If not, indicate applicable SAC code Unit Price Total Price Taxes & Duties
Unit Price Total Price GST GST
Rate Whether rate of GST is confirmed.if not, indicate applicable rate of GST # Amount Rate Whether rate of GST is confirmed.if not, indicate applicable rate of GST # Amount
1 25 MVA, 33/11kV Transformer along with OLTC and other accessories etc. Nos. 4 0.18 997135 0.18
2 Petty items to complete the job such as T-connectors, C-wedge connector, Clamps, GI nuts & bolts, Hexa blade, kerosin oil etc. L/S 1 0.18 997135 0.18
TOTAL FOR SCHEDULE-4 (1 + 2)
Note : 1. Bidder is required to quote prices in this Schedule for all the individual items/sub-items.
2. SAC Code shall be filled/confirmed by Bidder
3. In case of any ambiguity regarding text of items, description of items mentioned in BOQ, Section-Project, Vol.-II of NIT shall prevail.
4. # Specify amount of taxes,duties and levies as per GST Rules,payable on the transactions between contractor and employer as applicable for
destination site/state on all items of supply including bought-out finished items(to be identified in the contract),which shall be dispatched directly
from the Subvendor's works to the Employer's site (sale-in-transit), only.Taxes , duties and levies as per GST Rules for all the bought-out are to be included in the
base Price (Col. No.7) only and not to be indicated here.
Design, Supply, Erection, Testing & Commissioning of 04 Nos. 25 MVA, 33/11kV Transformers including dismantling of existing 02 Nos. 20MVA and 02 Nos. 16 MVA Transformers with associated civil works at 220kV Sub Station, Lodhi Road on Turnkey Basis (Risk & Cost Purchase).
(Price Break-up of Erection Charges)
Bidder's Name & Address: To, DGM (T) Material
Room No. 9, Ground Floor,
Maintenance Block,
Old Indraprastha Power House
Near 220 KV Indraprastha Substation
New Delhi-11002
Email: [email protected]
Price Break-up for individual items
(Bidder shall quote prices for the following mentioned items. Prices of all accessories, assemblies, components, parts etc. associated with these items are included in bidder's quoted prices for these items). (Prices in Rs.)
S.No. Description of Item Unit Qty Erection charges
SAC Code Whether SAC code is confirmed. If not, indicate applicable SAC code Unit Price Total Price Taxes & Duties
Unit Price Total Price GST
Rate Whether rate of GST is confirmed.if not, indicate applicable rate of GST # Amount
i) Erection Testing and Commissioning of 25 MVA, 33/11kV Transformer along with OLTC and other accessories etc. Nos. 4 0.18
ii) ETC of Petty Items/Petty Works to complete the job. L/S 1 0.18
B Dismantling of Equipments
i) Dismantling of existing 20 MVA, 33/11kV Transformer along with OLTC including transportation Nos. 2 0.18
ii) Dismantling of existing 16 MVA, 33/11kV Transformer along with OLTC including transportation Nos. 2 0.18
(i) Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed: All kinds of soil Cu. M 460 0.18
ii) Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil Cu. M 164 0.18
iii) Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Cu. M 317 0.18
iv) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Cu. M 8.2 995423 0.18
v) Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using fly ash and cement content as per approved design mix, and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate / retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. NOTE- (1) Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/ recoverable separately. (2) Fly ash conforming to grade I of IS 3812 (Part-1) only be used as part replacement of OPC as per IS : 456. Uniform blending with cement to be ensured in accordance with clauses 5.2 and 5.2.1 of IS:456 -2000 in the items of BMC and RMC. All works up to Plinth level. Cu. M 140 0.18
vi) Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1:2 (1 cement : I coarse sand : 2 graded stone aggregate 20 mm nominal size). Cu. M 9 0.18
vii) Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1:2 (1 cement :1 coarse sand : 2 graded stone aggregate 20 mm nominal size) Cu. M 18 0.18
viii) Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering and shuttering, finishing and reinforcement - All work up to plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Cu. M 36 0.18
ix) Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.: Thermo-Mechanically Treated bars Kg 1620 0.18
x) Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.: Thermo-Mechanically Treated bars Kg 13960 0.18
xi) Structural steel work in single section fixed with or without connecting plate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Kg 1664 0.18
xii) Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Kg 130 0.18
xiii) Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete. Sqm 223 0.18
xiv) Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. Sqm 195 0.18
xv) Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50metres lead as per direction of Engineer-in-charge. In cement mortar. Cu. M 15 0.18
xvi) Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. Cu. M 81 0.18
xvii) Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal Concrete 1:4:8 or richer mix (i/c equivalent design mix) Cu. M 20 0.18
xviii) Extra for cutting reinforcement bars manually /by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or SQM R.B. work) as per direction of Engineer-in-charge. Sqm 2 0.18
xix) Disposal of building rubbish /malba /similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved Cu. M 150 0.18
xx) Carriage of material by mechanical transport including loading , unloading and stacking earth upto 10km for all lead including all lifts involved Cu. M 185 0.18
xxi) Brick work with common burnt clay F.P.S.(non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) Cu. M 4 0.18
xxii) 12 mm cement plaster of mix: 1:6 (1 cement: 6 fine sand) Sqm 60 0.18
xxiii) Collecting,stacking, cleaning, washing, restacking and respreading the stone aggregate 20mm size including disposal of rubbish out side the S/Stn. as per direction of Engineer-in-charge for all leads & lifts. Cu. M 15 0.18
xxiv) Supply, stacking and spreading of 20mm single size ungraded stone aggregate in switchyard area upto any lead & lift as per direction of Engineer-in-charge Cu. M 5 0.18
xxv) Recovery of FPS bricks class designation 75 as per engineer in charge. Nos. 100 0.18
xxvi) Recovery of steel scrarp as per diirection of Engineer in charge KG 4100 0.18
GRAND TOTL OF SCHEDULE 5 (A to C)
Note : 1. Bidder is required to quote prices in this Schedule for all the individual items/sub-items.
2. SAC Code shall be filled/confirmed by Bidder
3. In case of any ambiguity regarding text of items, description of items mentioned in BOQ, Section-Project, Vol.-II of NIT shall prevail.
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
tendedoc.pdf
Tender Documents • 5.44 MB
Pricesche.xls
Additional Documents • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .