Loading…
Loading…
Tender Value
₹23.1 L
EMD Value
₹46,000
Closing Date
31 Jul 2026, 3:00 pm5d left
EXECUTIVE ENGINEER RURAL ENGINEERING DEPARTMENT
EXECUTIVE ENGINEER RURAL ENGINEERING DEPARTMENT JALAUN AT ORAI
Construction work of boundary wall of playground in Kasturba Gandhi Residential Girls School, Tehar
2026_REDUP_1171483_1
08/EE/RED/2026-27
Open Tender
Civil Works - Buildings
Percentage
120 days
JALAUN
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹46,000
31 Jul 2026
22 Jul 2026
31 Jul 2026
22 Jul 2026
31 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. DSR 2023- 2.31 | 465 | m² | 12.54 | ₹5,831.1 |
| 2 | Boring of pile hole 200 mm diameter ,3.50 m deep single under reamed of 50 cm diameter I/c all as directed by engineer in charge. (SOR. Dt. 25.07.2022 - chapter no. 4 new item 1) | 184 | No. | 285 | ₹52,440 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering finishing and reinforcement - All work up to plinth level 1:1½:3 cement, coarse sand and 20mm gauge stone grit including all complete. DSR 2023- 5.1.2 | 57.24 | m³ | 6,444.46 | ₹3,68,880.89 |
| 4 | Foundations, footings, bases of columns, etc. for concrete Shuttering - DSR 2023- 5.9.1 | 186 | m² | 279.38 | ₹51,964.68 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 2023 - .5.2.2 | 15.74 | m³ | 7,731.96 | ₹1,21,701.05 |
| 6 | Foundations, footings, bases of columns, etc. for concrete Shuttering - DSR 2023- 5.9.1 | 259.8 | m² | 279.38 | ₹72,582.92 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D. DSR 2023- 5.22.6 | 7,245.4 | Kg. | 76.84 | ₹5,56,736.54 |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 4 coarse sand) .DSR 2023- 6.4.2 | 92.51 | m³ | 6,487.34 | ₹6,00,143.82 |
| 9 | Plaster 12 mm thick with cement, fine sand mortar in proportion of 1:6 in fair side of wall I/c all complete as directed by engineer in charge etc. DSR 2023- 13.4.2 | 402.21 | m² | 244.82 | ₹98,469.05 |
| 10 | Plaster 15 mm thick with cement, fine sand mortar in proportion of 1:6 in rough side of wall I/c all complete as directed by engineer in charge etc. DSR 2023- 13.5.2 | 402.21 | m² | 281.66 | ₹1,13,286.47 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
08.pdf
Tender Documents • 1.95 MB
BOQ_2199279.xls
BOQ • 0.25 MB
camati.pdf
PDF • 1.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].