Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC PLOT NO 41 SECTOR D BAGRODA INDUSTRIAL AREA BHOPAL MP 462026 | BHOPAL | MADHYA PRADESH | 462026 | ₹1.1 Cr Quoted ₹4.5 Cr | L1 | Accepted-AOC Placed for initially 6 months |
| 2 | L2₹5.4 Cr+₹86.2 L (19.1%)Rejected-AOC K 4 FIVE STAR INDUSTRIAL AREA MIDC BUTIBORI NAGPUR 441 122 | NAGPUR | NAGPUR | MAHARASHTRA | 441122 | ₹5.4 Cr+₹86.2 L (19.1%) | L2 | Rejected-AOC Stood L2 |
| 3 | Rejected-Technical SP 52 MPPGCL COLONY BIRSINGHPUR DISTT UMARIA 484 552 M P | BIRSINGHPUR | UMARIA | MADHYA PRADESH | 484552 | - | - | Rejected-Technical Firm neither uploaded nor submitted physical copy of Annexure-XVI Insolvency and Bankruptcy |
| Sl No | Description | Qty | Unit | UNITED ENGINEERING | EM Services (I) Pvt. Ltd. |
|---|---|---|---|---|---|
| 1.00CLEANING OF BOILER | |||||
| 1.01 | Complete External Cleaning of Boiler from Top to Bottom | 4 | LS | 5,00,000 ₹5,90,000 Lowest | 5,75,000 ₹6,78,500 |
| 1.02 | CLEANING OF ASH FROM ECONOMISER HOPPER WITH CONNECTING DUCTS | 4 | JOB | 1,00,000 ₹1,18,000 Lowest | 1,15,000 ₹1,35,700 |
| 1.03 | Cleaning of Ash in Dead Chamber, Penthouse, Cat House | 4 | JOB | 4,40,000 ₹5,19,200 Lowest | 5,06,000 ₹5,97,080 |
| 2.00PREPARATION OF SCAFFOLDING | |||||
| 2.01 | Preparation of Scaffolding in Boiler Horizontal Pass ( Including Goosneck Part, Screen Tubes , TT Coil , Reheater Coils) | 16 | JOB | 9,60,000 ₹11,32,800 Lowest | 11,04,000 ₹13,02,720 |
| 2.02 | Preparation of scaffolding above Economiser Hopper for inspection & attending of Economiser Lower Bank Coil | 4 | JOB | 2,40,000 ₹2,83,200 Lowest | 2,76,000 ₹3,25,680 |
| 2.03 | Preparation of Scaffolding in Wind Box at Each Corner | 8 | JOB | 1,76,000 ₹2,07,680 Lowest | 2,02,400 ₹2,38,832 |
| 2.04 | Preparation of Scaffolding in Cat House for S-Panel Back Side Checking, Reparing | 16 | JOB | 3,52,000 ₹4,15,360 Lowest | 4,04,800 ₹4,77,664 |
| 2.05 | Preparation of Scaffolding in Bottom Ash Hopper Area | 4 | JOB | 1,80,000 ₹2,12,400 Lowest | 2,07,000 ₹2,44,260 |
Tender Value
₹3.2 Cr
EMD Value
₹3.2 L
Closing Date
6 Jan 2025, 3:30 pmClosed
CE(Gen.),SSTPP
Admin Building, SSTPP, Dongalia
Biennial Work contract for Routine and Preventive/Breakdown Maintenance of Boiler Pressure Parts and Fuel Oil Handling System (FOHS) of Boiler Unit 1 and 2, 2x600 MW SSTPP. MPPGCL, Dongalia
2024_MPPGC_375619_1
WT-2474
Open Tender
Miscellaneous Works
Item Rate
730 days
SSTPP, Dongalia
Please refer Tender documents.
19 documents required · 19 mandatory
₹5,000
Yes
₹3.2 L
Yes
1 Nov 2025
10 Dec 2024
7 Jan 2025
10 Dec 2024
6 Jan 2025
10 Dec 2024
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .