| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 CrAccepted-AOC | ₹2.5 Cr | 1 | Accepted-AOC AWARDED |
| 2 | 2₹2.6 Cr+₹13.7 L (5.50%)Rejected-Finance B 22 152 STREET NO 1 14 BABA FARID NAGAR BATHINDA 151001 PB | BATHINDA | PUNJAB | 151001 | ₹2.6 Cr+₹13.7 L (5.50%) | 2 | Rejected-Finance high bidder |
| 3 | 3₹2.7 Cr+₹20.7 L (8.29%)Rejected-Finance 357 KOTKAPURA ROAD STREET NO 8 MUKTSAR PUNJAB 152026 | SRI MUKTSAR SAHIB | PUNJAB | 152026 | ₹2.7 Cr+₹20.7 L (8.29%) | 3 | Rejected-Finance high bidder |
| 4 | 4₹2.8 Cr+₹28.6 L (11.5%)Rejected-Finance VILLAGE SIVIAN DISTT BATHINDA | BATHINDA | PUNJAB | 151001 | ₹2.8 Cr+₹28.6 L (11.5%) | 4 | Rejected-Finance high bidder |
| Sl No | Description | Qty | Unit | M/S ASHOK KUMAR CONTRACTOR L3 | namdhari construction company L1 | HARPREET SINGH CONTRACTOR L2 | EVERGREEN EARTH MOVERS L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Jungle clearance on running canals and branches and drains with discharge above 9 cumecs (Heavy Growth) | 1.79 | km | 22,654.46 ₹40,551.48 | 2,500 ₹4,475 Lowest | 22,654 ₹40,550.66 | 22,654 ₹40,550.66 |
| 2.00 | Excavation in soil (any type) using hydraulic excavator CK 90 with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections including all lifts and combined lead upto 30 m | 3,770.83 | cum | 20 ₹75,416.6 Lowest | 35 ₹1,31,979.05 | 35.82 ₹1,35,071.13 | 35 ₹1,31,979.05 |
| 3.00 | Excavation of soil using hydraulic excavator and tractor trolly i/c cutting and loading in tippers and transporting to the embankments location with all lifts and leads excluding royality (Rural) | 13,905.97 | cum | 132.98 ₹18,49,215.89 | 132 ₹18,35,588.04 | 85 ₹11,82,007.45 Lowest | 166 ₹23,08,391.02 |
| 4.00 | Ordinary earth/clay taken from private land including compensation but excluding royality | 13,905.97 | cum | 1 ₹13,905.97 Lowest | 50 ₹6,95,298.5 | 20 ₹2,78,119.4 | 50 ₹6,95,298.5 |
| 5.00 | Earthwork for compaction in 20 cm layers and dressing.Extra for watering the earth.Extra for rolling to specifications. | 17,357.81 | cum | 50 ₹8,67,890.5 Lowest | 75 ₹13,01,835.75 | 99.03 ₹17,18,943.92 | 108 ₹18,74,643.48 |
| 6.00 | Dressing of earthwork New work or remodeling work | 8,557.95 | sqm | 1.3 ₹11,125.34 | 1 ₹8,557.95 Lowest | 1.3 ₹11,125.34 | 1 ₹8,557.95 Lowest |
| 7.00 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth | 2,454.03 | cum | 100 ₹2,45,403 Lowest | 159 ₹3,90,190.77 | 159.2 ₹3,90,681.58 | 159 ₹3,90,190.77 |
| 8.00 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above1.5 mtr depth but upto 3.0 m | 2,454.03 | cum | 100 ₹2,45,403 Lowest | 166 ₹4,07,368.98 | 166.84 ₹4,09,430.37 | 166 ₹4,07,368.98 |
| 9.00 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above 3.0 mtr depth but upto 4.5 m | 299.27 | cum | 100 ₹29,927 Lowest | 182 ₹54,467.14 | 182.14 ₹54,509.04 | 182 ₹54,467.14 |
| 10.00 | Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres. | 1,503.26 | cum | 137 ₹2,05,946.62 Lowest | 147 ₹2,20,979.22 | 191.74 ₹2,88,235.07 | 191 ₹2,87,122.66 |
Tender Value
₹2.8 Cr
EMD Value
₹5.7 L
Closing Date
19 Feb 2026, 12:00 pmClosed
Executive Engineer
Faridkot Canal and GW Division Faridkot
Estimate for Concrete Lining of Assa Butter Feeder RD 32625 to 38500
2026_WR_158892_1
Estimate for Concrete Lining of Assa Butter Feeder RD 32625 to 38500
Open Tender
Civil Works - Canal
Item Rate
30 days
Dhaipai
Pre Qualification Details
2 documents required · 2 mandatory
₹2,000
Yes
₹5.7 L
Yes
Faridkot
10 Mar 2026
29 Jan 2026
19 Feb 2026
29 Jan 2026
19 Feb 2026
29 Jan 2026
13 Feb 2026
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Faridkot Canal Division, Faridkot
Name of Work: Estimate for Concrete lining of Assa Butter Feeder RD 32625-38500
Contract No: 01639-250059
Name of the Bidder/ Bidding Firm / Company :
Sl. No. C.S.R Item No./Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
Jungle clearance on running canals and branches and drains with discharge above 9 cumecs (Heavy Growth) 1.79 km Excess(+) Full Conversion INR
Excavation in soil (any type) using hydraulic excavator CK 90 with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections including all lifts and combined lead upto 30 m 3770.83 cum Excess(+) Full Conversion INR
Excavation of soil using hydraulic excavator and tractor trolly i/c cutting and loading in tippers and transporting to the embankments location with all lifts and leads excluding royality (Rural) 13905.97 cum Excess(+) Full Conversion INR
Ordinary earth/clay taken from private land including compensation but excluding royality 13905.97 cum Excess(+) Full Conversion INR
Earthwork for compaction in 20 cm layers and dressing.Extra for watering the earth.Extra for rolling to specifications. 17357.81 cum Excess(+) Full Conversion INR
Dressing of earthwork New work or remodeling work 8557.95 sqm Excess(+) Full Conversion INR
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth 2454.03 cum Excess(+) Full Conversion INR
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above1.5 mtr depth but upto 3.0 m 2454.03 cum Excess(+) Full Conversion INR
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above 3.0 mtr depth but upto 4.5 m 299.27 cum Excess(+) Full Conversion INR
Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres. 1503.26 cum Excess(+) Full Conversion INR
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification 17374.38 sqm Excess(+) Full Conversion INR
Laying cement water slurry 1:3, with cement @ 2.25 kg/sqms as on prepared side slopes before laying concrete on side slopes. 19317.38 sqm Excess(+) Full Conversion INR
Cement concrete lining 100 mm thick or less with mechanical paver for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. Excess(+) Full Conversion INR
(Computerized batching & mixing plant mixed concrete lining on bed and SS upto vertical height 2.0 m) 858.58 cum Excess(+) Full Conversion INR
(Computerized batching & mixing plant mixed concrete lining on bed and SS for vertical height above 2.0 m but upto 3.5 m) 507.82 cum Excess(+) Full Conversion INR
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (forCoping, Transverse Sleepers, Toe Wall (Longitudinal), Safety Ladder) 1503.26 cum Excess(+) Full Conversion INR
Cold twisted deformed(Ribbed/TOR Steel) Bars (Fe 500 grade as per IS 1786:2008), For RCC works i/c bending binding and placing in position complete in all respects 2.94 qtl Excess(+) Full Conversion INR
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) 68.57 sqm Excess(+) Full Conversion INR
Filling Contraction/Construction Joint with sealing compound complete in all respect 5054.55 m Excess(+) Full Conversion INR
Filling expansion joints with special impervious hot pour 12.5 mm wide. 269.69 m Excess(+) Full Conversion INR
Extra bitumen painting over concrete surface at joints @ 0.69 kg per Sqm 34.92 sqm Excess(+) Full Conversion INR
Polythene films/sheet of 100,125,150,200,250 microns (For 150 Microns) 6.02 kg Excess(+) Full Conversion INR
Dressing of Dowel along water carrying channel in addition to payment for dressed earth work 1790.61 m Excess(+) Full Conversion INR
Dag belling single Kassi stroke minimum 7.5 cm depth. 1.79 km Excess(+) Full Conversion INR
C. Conc. 1:3:6 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type 0.29 cum Excess(+) Full Conversion INR
C. Conc. 1:2:4 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type 0.06 cum Excess(+) Full Conversion INR
Dismantling brick work, tile masonry or tile lining (in cement mortar). 2266.51 cum Excess(+) Full Conversion INR
Painting distance marks with synthetic enamel paint two coat work for Distributaries 6 each Excess(+) Full Conversion INR
CC 1:4:8 with Stone aggregate 40 mm gauge mixing by mechanical means using concrete mixer volumetric type 11.78 cum Excess(+) Full Conversion INR
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth. 45.09 cum Excess(+) Full Conversion INR
RCC M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centering and shuttering in superstructure 1.57 cum Excess(+) Full Conversion INR
Earth work involved in dismantling open flume A.P.M. or O.S.M. type outlets with 'H' more than 0.50 m but upto 0.90 m (including excavation, refilling, consolidation and dressing) . 5 No. Excess(+) Full Conversion INR
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling with 'H' more than 0.50 m but upto 0.90 m. 5 No. Excess(+) Full Conversion INR
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.50 m but upto 0.90 m. 5 No. Excess(+) Full Conversion INR
First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth 1 Cum Excess(+) Full Conversion INR
Exacavation of soil using hydraulic excavator and hydraulic tractor trolly i/c cutting and loading ain trolly and transporting to the embankment locations including all lifts and leads, excluding royality. 1 Cum Excess(+) Full Conversion INR
Water Bound Macadam Grading I (without screening for low volume Roads/undersigned Providing, laying, spreading and compacting stone aggregates of Grading I towater bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheeled roller 8-10 tonnes instages to proper grade and camber, applying and brooming requisite typeof binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the requireddensity completeas per technical specifications 1 Cum Excess(+) Full Conversion INR
Any other Item Nos Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
Tendernotice_2.pdf
PDF • 0.61 MB
BOQ_322110.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .