Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | L1 | Accepted-AOC Approved by Circle Commettee | |
| 2 | L2₹2.3 L+₹48,946 (27.1%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.3 L+₹50,623 (28.0%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹2.3 L+₹52,866 (29.2%)Rejected-Finance A 5 829 VIRAM KHAND GOMTI NAGAR LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
4 Nov 2019, 2:00 pmClosed
Superintending Engineer EDC Maharajganj
Office of the Superintending Engineer, 132 KV Sub-station Baikunthpur, Maharajganj
Supply of furniture
2019_PVVNV_391371_2
85/EDC(M)/2019-20
Open Tender
Furniture/ Fixture
Lump-sum
60 days
ETD Maharajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Superintending Engineer
₹2,000
27 Jan 2020
23 Oct 2019
5 Nov 2019
23 Oct 2019
4 Nov 2019
23 Oct 2019
Amount
fo|qr ijh{k.k [k.M] egjktxat ds dk;kZy; gsrq fuEuor~ QuhZpj dh vkiwfrZ djk;k tkuk gS%&
Supply of Ex. Table with 3 door and 1 cupboard size 1800x1200x760mm
Supply of Ex. Chair (revolving) (SBI-1001)
Supply of Side Rack covered.
Supply of office table 4x2.5 fit.
Supply of Supreme chair.
Supply of Computer table 3x2 ft (CDU)
Supply of Computer chair SBI 1065
Supply of steel Almirah with four shelf size 1980x860x480
Supply of wooden stool
Supply of bench 4 seater
R K CONTRUCTION
SANAYA INFOTECH
AADI SHAKTI ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .