| 1 | ₹1.5 LAWARDED | AWARDED |
Tender Value
₹1.5 L
EMD Value
₹3,850
Closing Date
27 Mar 2025, 11:00 pmClosed
Directorate of Municipal Administration
Package No.02 (1) Construction of drain and culvert near Ambedkar Nagar Egg Rice Muniraju house in Ward No. 30 In Chikkaballapura City Municipal Council Limits. (2) Road elevation work from Githappa sons house to Kallahalli Narayanaswamy house in Ambedkar Nagar, Ward No.30 In Chikkaballapura City Municipal Council Limits (3) Work to install a new 2 inch pipeline from Jaibheem Nagar Main Road, Ward No. 08 to Babajans house In Chikkaballapura City Municipal Council Limits
DMA/2024-25/OW/WORK_INDENT37161
DMA/2024-25/OW/WORK_INDENT37161
Open
Other Works
Electronic Documents, First(One Cover)
DMA City Municipal Council Chikkaballapura
₹500
₹3,850
12 Mar 2025
12 Mar 2025
27 Mar 2025
Package No.02 (1) Construction of drain and culvert near Ambedkar Nagar Egg Rice Muniraju house in Ward No. 30 In Chikkaballapura City Municipal Council Limits. (2) Road elevation work from Githappa sons house to Kallahalli Narayanaswamy house in Ambedkar Nagar, Ward No.30 In Chikkaballapura City Municipal Council Limits (3) Work to install a new 2 inch pipeline from Jaibheem Nagar Main Road, Ward No. 08 to Babajans house In Chikkaballapura City Municipal Council Limits
Earth work excavation by manual means for drains,canals, waste weir,draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and tec...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
Supplying, fitting and placing Mild Steel Reinforcement complete as per drawing and technical specification.
As per the recomandations of the techinical working group, rates for the form work shall be added on percentage basis to the finished concrete item rate. For drain work @ 5%
Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations and other similar works etc. in layers not exceeding20cm in depth, consolidating each deposited layer by ram...
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and te...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Cutting Asphalt /Concrete road surface using machine cutter for leakage pit with earth work excavation in all classifications of soil including all lead and lifts bailing out water with pumps includin...
Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights...
Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joint...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5...
63 mm dia PVC Tee
63 mm dia PVC BEND
Supply of PPR Gate valve confirming to IS 15801-2008 and DIN Standards 8077/8092
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .