| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹39.9 LAdmitted-Finance GOA | SOUTH GOA | GOA | 403712 | -20.00% | ₹39.9 L | L1 | Admitted-Finance |
| 2 | L2₹42.0 L+₹2.1 L (5.30%)Admitted-Finance GOA | -15.76% | ₹42.0 L+₹2.1 L (5.30%) | L2 | Admitted-Finance |
| 3 | L3₹48.0 L+₹8.0 L (20.1%)Admitted-Finance GOA | -3.90% | ₹48.0 L+₹8.0 L (20.1%) | L3 | Admitted-Finance |
Tender Value
₹49.9 L
EMD Value
₹99,806
Closing Date
7 Sept 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
DIVISION XVI (BLDGS), P.W.D. PONDA GOA
Construction of Community Hall at Ganapati Temple, Okamb in V.P. Dharbandora in Sanvordem Constituency (Under Tribal Sub Plan Scheme)
2026_PWD_31462_1
PWD/DIVISION XVI (BC)/TS/12/2026-2027 Line 02
Open Tender
Civil Works - Buildings
Percentage
365 days
Ganapati Temple, Okamb in V.P. Dharbandora
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹99,806
8 Sept 2026
1 Sept 2026
8 Sept 2026
1 Sept 2026
7 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 1.01 | a) All kinds of soil | 153.28 | cu.m | 291 | ₹44,604.48 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 46.28 | cu.m | 2,211 | ₹1,02,325.08 |
| 3Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 3.01 | a) All works upto plinth level | 23.15 | cu.m | 6,810 | ₹1,57,651.5 |
| 4Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) | |||||
| 4.01 | a) All works upto plinth level | 22.66 | cu.m | 7,178 | ₹1,62,653.48 |
| 5Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) | |||||
| 5.01 | b) In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level | 9.15 | cu.m | 8,034 | ₹73,511.1 |
| 6Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_31844.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .