| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.9 LAdmitted-Finance | ₹39.9 L | L1 | Admitted-Finance |
| 2 | L2₹42.1 L+₹2.2 L (5.46%)Admitted-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹42.1 L+₹2.2 L (5.46%) | L2 | Admitted-Finance |
| 3 | L3₹47.5 L+₹7.6 L (18.9%)Admitted-Finance | ₹47.5 L+₹7.6 L (18.9%) | L3 | Admitted-Finance |
| 4 | L4₹49.1 L+₹9.1 L (22.9%)Admitted-Finance 107 2 AMPA MANOR IST FLOOR NELSON MANICKAM ROAD AMINJIKARAI CHENNAI 0 600 029 NO 107 2 AMPA MANOR 1ST FLOOR NELSON MANICKAM ROAD AMINIJIKARAI AMINJIKARAI | ₹49.1 L+₹9.1 L (22.9%) | L4 | Admitted-Finance |
| 5 | L5₹49.9 L+₹9.9 L (24.8%)Admitted-Finance | ₹49.9 L+₹9.9 L (24.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CHANDRA REDDY ELECTRICALS L10 | GJDECORS L8 | MVPOWER CONSULTANTS AND ENGINEERS PVT LTD L5 | V.K.sam Engineering L2 | DQBYDT PVT LTD L12 | G SONS POWER L1 | SS ENTERPRISES ELECTRICALS L3 | GAYATRI PRIVATE LIMITED L9 | SHREE GOURI ELECTRIC ENTERPRISE L6 | JYOTI ELECTRO SYSTEMS PVT LTD L7 | TOOT MNE TECH PRIVATE LIMITED L4 | ABM Electricals L11 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Design, Fabricate, Supply of 1600 Amps, 440 volts rated indoor type L.T. Distribution Switch board at A – substation comprising of 2 Nos. 800A, 4P, ACB as incomer for generator and 3 Nos 800A 4P, ACB as Transformer Incomer and 2 Nos. 800A, 4P, ACB Bus coupler and 4 Nos. 630A, 4P, MCCB, 5 Nos. 400A, 4P, MCCB, 6 Nos. 250A, 4P, MCCB and 6 Nos. 100A, 4P, MCCB as outgoings with all other accessories as per Technical specification of schedule ‘A. | 1 | No. | 40,43,600 ₹40,43,600 | 36,21,250 ₹36,21,250 | 36,00,000 ₹36,00,000 | 32,75,000 ₹32,75,000 | 47,50,000 ₹47,50,000 | 32,15,000 ₹32,15,000 Lowest | 32,90,000 ₹32,90,000 | 45,31,396 ₹45,31,396 | 41,05,000 ₹41,05,000 | 38,00,000 ₹38,00,000 | 34,29,535 ₹34,29,535 | 55,68,530 ₹55,68,530 |
| 2.00 | Installation of the above Sl.No.1 LT Distribution boards as per Technical specification of schedule ‘A. | 1 | No. | 75,000 ₹75,000 | 1,45,000 ₹1,45,000 | 50,000 ₹50,000 | 25,000 ₹25,000 | 1,15,000 ₹1,15,000 | 35,000 ₹35,000 | 40,000 ₹40,000 | 35,317 ₹35,317 | 1,15,500 ₹1,15,500 | 1,50,000 ₹1,50,000 | 40,250 ₹40,250 | 20,000 ₹20,000 Lowest |
| 3.00 | Design, Fabrication, Supply of 225 KVAR, with three section each 75 KVAR 440 volts’ 3 Phase L.T. APFC Capacitor Panel at A – substation as per Technical specification of schedule ‘A. | 1 | No. | 18,41,400 ₹18,41,400 | 9,27,500 ₹9,27,500 | 9,25,000 ₹9,25,000 | 7,35,000 ₹7,35,000 | 13,28,250 ₹13,28,250 | 5,65,000 ₹5,65,000 | 9,05,000 ₹9,05,000 | 7,76,158 ₹7,76,158 | 4,72,500 ₹4,72,500 | 4,00,000 ₹4,00,000 Lowest | 5,20,025 ₹5,20,025 | 13,49,700 ₹13,49,700 |
| 4.00 | Installation of above Sl.No.3 of APFC capacitor panel as per Technical specification of schedule ‘A’. | 1 | No. | 50,000 ₹50,000 | 50,000 ₹50,000 | 10,000 ₹10,000 | 7,500 ₹7,500 Lowest | 80,500 ₹80,500 | 9,000 ₹9,000 | 15,000 ₹15,000 | 17,658 ₹17,658 | 42,000 ₹42,000 | 50,000 ₹50,000 | 17,250 ₹17,250 | 10,000 ₹10,000 |
| 5.00 | Dismantling the existing 2 Nos. L.T. Cubicle distribution switch board and One No. L.T. capacitor bank panel. The existing cables removed from the L.T. distribution switch board and all removed cables are to be reconnected after installation of new LT distribution switch board The Dismantled Cubicle distribution switch board to be shifted to power supply or RSA as per Technical specification of schedule ‘A’. | 1 | L.S. | 20,000 ₹20,000 | 41,500 ₹41,500 | 50,000 ₹50,000 | 18,000 ₹18,000 | 3,62,250 ₹3,62,250 | 30,000 ₹30,000 | 2,25,000 ₹2,25,000 | 28,254 ₹28,254 | 1,47,000 ₹1,47,000 | 1,00,000 ₹1,00,000 | 80,500 ₹80,500 | 15,000 ₹15,000 Lowest |
| 6.00 | Supply of PIPE Earthing shall be carried out in accordance with BIS 3043/ BS 7430 of the latest version as per Technical specification of schedule ‘A’. | 4 | No. | 28,000 ₹28,000 | 31,200 ₹31,200 | 38,000 ₹38,000 | 14,000 ₹14,000 Lowest | 48,300 ₹48,300 | 16,000 ₹16,000 | 23,200 ₹23,200 | 33,452 ₹33,452 | 16,800 ₹16,800 | 80,000 ₹80,000 | 36,572 ₹36,572 | 16,000 ₹16,000 |
| 7.00 | Installation of above Sl.No.6 of Pipe earthing as per Technical specification of schedule ‘A’. | 4 | No. | 12,000 ₹12,000 | 10,800 ₹10,800 | 14,000 ₹14,000 | 10,000 ₹10,000 | 9,200 ₹9,200 Lowest | 12,000 ₹12,000 | 12,000 ₹12,000 | 11,300 ₹11,300 | 23,100 ₹23,100 | 20,000 ₹20,000 | 41,400 ₹41,400 | 12,000 ₹12,000 |
| 8.00 | Supply of all materials for provision of Maintenance free earthing shall be carried out in accordance with BIS 3043/ BS 7430 of the latest version for new LT panel with all other accessories as per Technical specification of schedule ‘A’. | 2 | No. | 14,000 ₹14,000 | 37,900 ₹37,900 | 25,000 ₹25,000 | 10,000 ₹10,000 Lowest | 60,375 ₹60,375 | 12,000 ₹12,000 | 20,500 ₹20,500 | 17,432 ₹17,432 | 10,500 ₹10,500 | 40,000 ₹40,000 | 29,256 ₹29,256 | 24,000 ₹24,000 |
| 9.00 | Installation of above Sl.No.8 of earthing as per Technical specification of schedule ‘A’. | 2 | No. | 6,000 ₹6,000 | 5,000 ₹5,000 | 7,000 ₹7,000 | 4,000 ₹4,000 Lowest | 46,000 ₹46,000 | 8,000 ₹8,000 | 6,000 ₹6,000 | 5,650 ₹5,650 | 11,550 ₹11,550 | 10,000 ₹10,000 | 20,700 ₹20,700 | 10,000 ₹10,000 |
| 10.00 | Supply of 50X6 mm GI flat for earths for LT distribution switch board with all other accessories as per Technical specification schedule ‘A’. | 50 | Mtr. | 12,500 ₹12,500 | 21,350 ₹21,350 | 22,500 ₹22,500 | 14,900 ₹14,900 | 18,112.5 ₹18,112.5 | 18,750 ₹18,750 | 13,750 ₹13,750 | 12,750 ₹12,750 | 13,150 ₹13,150 | 17,500 ₹17,500 | 12,950 ₹12,950 | 12,100 ₹12,100 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
15 Sept 2022, 2:30 pmClosed
The Chief Mechanical Engineer
O/o The Chief Mechanical Engineer, 7th Floor, Centenary Building, No.1, Rajaji Salai, Chennai-600 001.
Dismantling of Old LT Panels, Design, Fabrication and SITC of New Indoor LT Distribution Cubicle Panel and APFC Capacitor Bank at A - Sub-station in ChPA.
2022_ChPT_706372_1
MEE/12/2022/Dy.CME (ES)
Open Tender
Electrical Works
Works
120 days
A-Sub-station Inside the Port Premises
As per Tender
11 documents required · 11 mandatory
₹0
₹1.3 L
Yes
Dy.CME (ES) Room
21 Nov 2022
12 Aug 2022
16 Sept 2022
12 Aug 2022
15 Sept 2022
29 Aug 2022
20 Aug 2022
Design, Fabricate, Supply of 1600 Amps, 440 volts rated indoor type L.T. Distribution Switch board at A – substation comprising of 2 Nos. 800A, 4P, ACB as incomer for generator and 3 Nos 800A 4P, ACB as Transformer Incomer and 2 Nos. 800A, 4P, ACB Bus coupler and 4 Nos. 630A, 4P, MCCB, 5 Nos. 400A, 4P, MCCB, 6 Nos. 250A, 4P, MCCB and 6 Nos. 100A, 4P, MCCB as outgoings with all other accessories as per Technical specification of schedule ‘A.
Installation of the above Sl.No.1 LT Distribution boards as per Technical specification of schedule ‘A.
Design, Fabrication, Supply of 225 KVAR, with three section each 75 KVAR 440 volts’ 3 Phase L.T. APFC Capacitor Panel at A – substation as per Technical specification of schedule ‘A.
Installation of above Sl.No.3 of APFC capacitor panel as per Technical specification of schedule ‘A’.
Dismantling the existing 2 Nos. L.T. Cubicle distribution switch board and One No. L.T. capacitor bank panel. The existing cables removed from the L.T. distribution switch board and all removed cables are to be reconnected after installation of new LT distribution switch board The Dismantled Cubicle distribution switch board to be shifted to power supply or RSA as per Technical specification of schedule ‘A’.
Supply of PIPE Earthing shall be carried out in accordance with BIS 3043/ BS 7430 of the latest version as per Technical specification of schedule ‘A’.
Installation of above Sl.No.6 of Pipe earthing as per Technical specification of schedule ‘A’.
Supply of all materials for provision of Maintenance free earthing shall be carried out in accordance with BIS 3043/ BS 7430 of the latest version for new LT panel with all other accessories as per Technical specification of schedule ‘A’.
Installation of above Sl.No.8 of earthing as per Technical specification of schedule ‘A’.
Supply of 50X6 mm GI flat for earths for LT distribution switch board with all other accessories as per Technical specification schedule ‘A’.
Laying of above Sl.No.10 of GI flat as per Technical specification of schedule ‘A’.
Supply of Battery charger unit including 2 Nos.12V, 2 Hrs. back up with suitable rating of Maintenance free Battery.
Installation, testing and commissioning of Sl.No.12 of Battery charger as per Technical specification of schedule ‘A’.
Supply of Fire buckets with M.S. angle stands each consists of 4 Nos. of round bottom fire buckets painted with red and marked fire and filled with clear dry river sand.
Installation of above Sl.No.14 as per Technical specification of schedule ‘A’.
Supply of first aid boxes equipped with first aid kids.
Supply of Flexible rubber mat shall be of size 1M width and required length conforming to IS 5424 of 1994 shall be provided in front of L.T. distribution switch board and L.T. capacitor panels.
Installation of above Sl.No.17 as per Technical specification of schedule ‘A.
Supply Rubber gloves conforming to IS 15652 of 2006 and tested to 15KV as per Technical specification of schedule ‘A’.
Testing and commissioning of New LT distribution switch board and L.T. APFC Capacitor Panel and produce test report as per Technical specification of schedule ‘A’.
V.K.sam Engineering
SS ENTERPRISES ELECTRICALS
TOOT MNE TECH PRIVATE LIMITED
MVPOWER CONSULTANTS AND ENGINEERS PVT LTD
SHREE GOURI ELECTRIC ENTERPRISE
JYOTI ELECTRO SYSTEMS PVT LTD
GJDECORS
GAYATRI PRIVATE LIMITED
CHANDRA REDDY ELECTRICALS
ABM Electricals
DQBYDT PVT LTD
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .