| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹25.2 L+₹48,659 (1.97%)Rejected-AOC | L2 | Rejected-AOC REJECT |
Tender Value
₹29.8 L
EMD Value
₹29,800
Closing Date
19 Feb 2024, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Bigbazzar Street, Townhall, Coimbatore.
Reconstruction of Storm Water Drain at Sasthiri in Ward No.44, West Zone
2024_MAWS_421468_38
E8/2024
Open Tender
Civil Works - Others
Works
150 days
Coimbatore Corporation
As per Tender Condition attached.
3 documents required · 3 mandatory
₹0
₹29,800
16 Nov 2024
10 Feb 2024
20 Feb 2024
10 Feb 2024
19 Feb 2024
10 Feb 2024
Amount
Dismantling the damaged RCC Slab as per Instruction of departmental officers..including all initial lead and lift etc complete.
Dismantling the damaged Cement Concrete as per Instruction of departmental officers..including all initial lead and lift etc complete.
Desilting the existing drain including all labours etc., complete
Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc.
Plain Cement concrete 1:4:8 mix (one cement, four sand, eight metal) using 40mm size Hard Broken stone etc complete
Supplying and erecting CENTERING for sides and soffits including supports and strutting upto 3.29m high for plane surfaces for drain, culverts etc., using mild steel sheets of size 90cm * 60cm and BG 10 stiffened with welded mild steel angles of size 25mm * 25mm * 3mm for boarding laid over countrywood joists of size 10cm * 6.5cm spaced at about 90cm centre to centre and supported by Casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete as directed.
Plain concrete 1:2:4 (one cement, two sand and four aggregate) using 20mm ISS HBG metal including cost and conveyance of all material to work site and labor charges for mixing,laying,compacting and curing etc, complete
Plastering with cement mortar 1:5 mix (one cement,five sand) to 10mm thick etc. complete as per the direction of Engineer-in-charge
Conveying the excavated earth from the site from 0 to 15 km lead including loading and unloading charges etc., completed.
BRINDAVAN AGENCY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .