| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-Finance | ₹9.2 L | L1 | Accepted-Finance Rates of Bidder are below estimated rates and also 1st lowest among three. |
| 2 | L2₹9.3 LRejected-Finance | ₹9.3 L | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among three. |
| 3 | L3₹9.4 LRejected-Finance | ₹9.4 L | L3 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among three. |
| Sl No | Description | Qty | Unit | M/S SAVERA BUILDCON L2 | PIYUSH CONTRACTORS L1 | M/S DIVINE BLESSED ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches
(a) Building and Other structure
(ii) By Hydraulic/ Mechanical excavator | 113.4 | Cum | 128 ₹14,515.20 | 127 ₹14,401.80 | 129 ₹14,628.60 |
| 2.00 | Centering and shuttering in straight portion of C.C. pier and abutment. | 27 | Sqm | 485 ₹13,095 | 480 ₹12,960 | 490 ₹13,230 |
| 3.00 | Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 16.2 | Cum | 5,794 ₹93,862.80 | 5,735 ₹92,907 | 5,855 ₹94,851 |
| 4.00 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | 91.21 | Cum | 5,060 ₹4.6 L | 5,010 ₹4.6 L | 5,115 ₹4.7 L |
| 5.00 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | 72 | Sqm | 112 ₹8,064 | 111 ₹7,992 | 114 ₹8,208 |
| 6.00 | Supplying and fixing 75 mm dia P.V.C. pipe for weep holes with inverted filter behind abutment including cost of all material, labour and T&P etc. required for proper completion of work. | 45 | Each | 680 ₹30,600 | 675 ₹30,375 | 690 ₹31,050 |
| 7.00 | Earth work in filling in ordinary soil in 20 cm layers with manual compaction including ramming and dressing the surface to the required levels, slopes i/c all lead & Lifts, all material, labour and T&P etc. complete. the earth from cutting to be used in making embankment as directed by Engineer - in - charge. | 1,121.35 | Cum | 277 ₹3.1 L | 274 ₹3.1 L | 280 ₹3.1 L |
Tender Value
₹9.4 L
EMD Value
₹18,860
Closing Date
27 Apr 2026, 11:00 amClosed
RAJEEV KUMAR EXECUTIVE ENGINER
O/O EXECUTIVE ENGINEER MADHYA GANGA CANAL CONSTRUCTION DIVISION-9 SAMBHAL
CONSTRUCTION OF HAIDERPUR DY (BALANCE WORK) FROM KM 3.775 TO KM 4.385.
2026_UPIDC_1138940_1
01/EE/2026-27
Open Tender
Civil Works - Canal
45 days
HAIDERPUR SAMBHAL
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹516
Yes
₹18,860
SAMBHAL
14 May 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches
(a) Building and Other structure
(ii) By Hydraulic/ Mechanical excavator | - | Cum | - | - |
| 2 | Centering and shuttering in straight portion of C.C. pier and abutment. | - | Sqm | - | - |
| 3 | Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | - | Cum | - | - |
| 4 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | - | Cum | - | - |
| 5 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | - | Sqm | - | - |
| 6 | Supplying and fixing 75 mm dia P.V.C. pipe for weep holes with inverted filter behind abutment including cost of all material, labour and T&P etc. required for proper completion of work. | - | Each | - | - |
| 7 | Earth work in filling in ordinary soil in 20 cm layers with manual compaction including ramming and dressing the surface to the required levels, slopes i/c all lead & Lifts, all material, labour and T&P etc. complete. the earth from cutting to be used in making embankment as directed by Engineer - in - charge. | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.81 MB
Tendernotice_2.pdf
PDF • 3.30 MB
BOQ_2126832.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid