| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | L1 | Accepted-AOC ALL DOCUMENTRY CONDITION ARE FULLFILLED | |
| 2 | L2₹9.3 L+₹9,425.75 (1.02%)Rejected-Finance | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among three. | |
| 3 | L3₹9.4 L+₹19,636.95 (2.13%)Rejected-Finance | L3 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among three. |
| Sl No | Description | Qty | Unit | M/S SAVERA BUILDCON L2 | PIYUSH CONTRACTORS L1 | M/S DIVINE BLESSED ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches
(a) Building and Other structure
(ii) By Hydraulic/ Mechanical excavator | 113.4 | Cum | 128 ₹14,515.2 | 127 ₹14,401.8 Lowest | 129 ₹14,628.6 |
| 2.00 | Centering and shuttering in straight portion of C.C. pier and abutment. | 27 | Sqm | 485 ₹13,095 | 480 ₹12,960 Lowest | 490 ₹13,230 |
| 3.00 | Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 16.2 | Cum | 5,794 ₹93,862.8 | 5,735 ₹92,907 Lowest | 5,855 ₹94,851 |
| 4.00 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | 91.21 | Cum | 5,060 ₹4,61,522.6 | 5,010 ₹4,56,962.1 Lowest | 5,115 ₹4,66,539.15 |
| 5.00 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | 72 | Sqm | 112 ₹8,064 | 111 ₹7,992 Lowest | 114 ₹8,208 |
| 6.00 | Supplying and fixing 75 mm dia P.V.C. pipe for weep holes with inverted filter behind abutment including cost of all material, labour and T&P etc. required for proper completion of work. | 45 | Each | 680 ₹30,600 | 675 ₹30,375 Lowest | 690 ₹31,050 |
| 7.00 | Earth work in filling in ordinary soil in 20 cm layers with manual compaction including ramming and dressing the surface to the required levels, slopes i/c all lead & Lifts, all material, labour and T&P etc. complete. the earth from cutting to be used in making embankment as directed by Engineer - in - charge. | 1,121.35 | Cum | 277 ₹3,10,613.95 | 274 ₹3,07,249.9 Lowest | 280 ₹3,13,978 |
Tender Value
₹9.4 L
EMD Value
₹18,860
Closing Date
27 Apr 2026, 11:00 amClosed
RAJEEV KUMAR EXECUTIVE ENGINER
O/O EXECUTIVE ENGINEER MADHYA GANGA CANAL CONSTRUCTION DIVISION-9 SAMBHAL
CONSTRUCTION OF HAIDERPUR DY (BALANCE WORK) FROM KM 3.775 TO KM 4.385.
2026_UPIDC_1138940_1
01/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
45 days
HAIDERPUR SAMBHAL
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹516
Yes
₹18,860
SAMBHAL
27 Jul 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches
(a) Building and Other structure
(ii) By Hydraulic/ Mechanical excavator | - | Cum | - | - |
| 2 | Centering and shuttering in straight portion of C.C. pier and abutment. | - | Sqm | - | - |
| 3 | Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | - | Cum | - | - |
| 4 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | - | Cum | - | - |
| 5 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | - | Sqm | - | - |
| 6 | Supplying and fixing 75 mm dia P.V.C. pipe for weep holes with inverted filter behind abutment including cost of all material, labour and T&P etc. required for proper completion of work. | - | Each | - | - |
| 7 | Earth work in filling in ordinary soil in 20 cm layers with manual compaction including ramming and dressing the surface to the required levels, slopes i/c all lead & Lifts, all material, labour and T&P etc. complete. the earth from cutting to be used in making embankment as directed by Engineer - in - charge. | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.81 MB
Tendernotice_2.pdf
PDF • 3.30 MB
BOQ_2126832.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .