Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹9.2 L
Closing Date
17 Jan 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Divisional Forest Officer Shopian Forest Division
Office of the Divisional Forest Officer Shopian Forest Division, Shopian, Kashmir, Jammu and Kashmir
Construction of Guard Hut at Toolihallan Sedow in compartment V-2a, Shopian Range.
2022_FD_156387_6
e-NIT No 13 OF 2021-22 (Shopian Forest Division)
Open Tender
Civil Works
Item Rate
45 days
Toolihallan Sedow in Compt. V-2a, Shopian Range
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Government Treasury under Account Head 0406-Forest
Exempted
4 Feb 2022
8 Jan 2022
18 Jan 2022
8 Jan 2022
17 Jan 2022
8 Jan 2022
90 days
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth up to 1.5mtr. including disposal of excavated earth up o 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed in: All kinds of soil L/W = 2x 19’-9”x 2’-3”x 3’-10”= 340.39 cft S/W = 2x 12’-3”x 2’-3”x 3’-10” = 211.12 cft = 1x 10’-6”x2’-3”x3’-10”=90.48 cft = 1x4’-6”x x2’-3”x3’-10”=38.77 cft=680.76
Providing and laying hand packed soling stones in horizontal including cost of stones , ramming watering complete job. Qtty vide (1)= 177.74 sft x 6”= 88.87cft or 2.51cum Floor of rooms = (12’x10’+5’x6’+6’x8’)x 1’-6”=297cft or 8.41cum Ver.= 4’-0”x6’-0”x1’-6”=36cft or 1.01cum
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. a) 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size crushed Qtty vide (2) = 177.74sft x 4” =68.65cft or 1.66cum Floor = 222sft x 4”= 73.26cft or 2.07cum T= 3.73 cum @ Rs 4419.85/cum
b) 1:3:6 (1 cement: 3 fine sand : 6 graded stone aggregate 40mm nominal size) crushed (PLINTH BLOCK) L/W = 2x19’-3” x 1’-9”x1’-6’ = 101.06cft = 2x 19’-0’x1’ -6”x1’-6” =85.5cft = 2x 18’-9”x1’-3”x2’-0”=93.75cft S/W = 2x12’-9”x 1’-9”x1’-6” = 66.93cft = 2x 13’-0”x1’-6”x1’-6”=58.5cft = 2x 13’-3”x1’-3”x2’-0”=66.25cft = 1x 11’-0” x1’-9”x1’-6”=28.87cft = 1x 11’-3” x1’-6”x1’-6”=25.31cft = 1x 11’-6” x1’-3”x2’-0”=28.75cft = 1x 5’-0” x1’-9”x1’-6” =13.12cft = 1x 5’-3”x x1’-6”x1’-6”=11.81cft = 1x 5’-6” x1’-3”x2’-0”=13.75cft --------------- 593.6 cft
c) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Qtty vide (5) lintels=46.12 CFft or 1.30cum @ Rs6344.25/cum
Centring and shuttermg including strutting, propping etc. and removal of form for·Foundations: footings, bases of columns etc. for mass concrete L/W = 2x2x19’-3”x1’-6’’ = 115.5sft = 2x 2x 19’-0’x1’-6” = 114sft = 2x2x 18’-9”x2’-0”=150sft S/W = 2x2x12’-9”x1’-6” = 76.5sft = 2x2x 13’-0”x1’-6”= 78sft = 2x2x 13’-3”x2’-0”=106sft = 2x 11’-0”x1’-6”=33sft = 2x 11’-3”x1’-6”=33.75sft = 2x 11’-6”x2’-0”=46sft = 2x 5’-0” x1’-6” =15sft = 2x 5’-3”x1’-6”= 15.75sft = 2x 5’-6”x2’-0”=22 sft t= 805.5sft or 74.86sqm @ Rs 262.30/sqm
Lintel= [2x2(18’-3”+13’-9”)+2(12’-0”+6’-0”)]x9”=123sft B=(2x3’+2’-6”+3x6’+4’+2x4’)x9”=28.87sft 151,87 sft or 14.11 sqm
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) L/W = 2x 18’-3”x9”x9’-3”=253.21cft S/W = 2x13’-9”x9”x9’-3”=190.78cft = 1x 12’-0”x9”x9’-3”=83.25cft = 1x6’-0”x9’x9’-3”= 41.62cft -------------------------- 568.86cft D/d openings D= 2x3’-0”x9”x7’-0”=31.5cft D2=1x2’-6”x9”x7’-0”=13.12cft W= 3x 6’-0’x9”x5’-0”=67.5cft W2= 1x4’-0”x9”x5’-0”= 15cft V= 2x 4’-0”x9”x2’-6”=15cft Lintels =(2x18’-3”+2x13’-9”+12’+6’)x 9”x9”=46.12cft
Providing wood work in frames of false ceiling, partitions etc. sawn and fixed in position including painting with tar vertical post to be embedded in concrete of Budloo / Fir wood complete job Ceiling =( 9x15’+6x18’) x4”x4”=26.46cft Weather boarding=2x 2(23’-3”+20’-5”)x2”x2”=4.47cft = (12+11)2 no x2’-6”x2”x2”=2.94cft
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): First class kail wood W= 11x 5’x3”x5”=5.63cft 2 x 2x 7’x 3’x5” =2.87cft 2x 2x 5’-0’x3”x5”=2.05cft 3x 2’-6”x3”x5”=0.76cft D = 6x7’ x3”x5”= 4.30cft 2x 3’ -6”x 3”x5” =0.71cft 1x3’-0”x3”x5”=0.30cft
Providing and fixing glazed shutters for doors, windows and clerestory windows using 4mm thick float glass panes including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws. 2x3x1’-6” x5’ = 45 sft 2x 1’-6”x2’-6”=7.5sft = 52.5sft or 4.87sqm @ Rs 3726.05/sqm
Providing and fixing lSI marked flush door shutters conforming to IS: 2202 (Part I) decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters 35 mm thick including lSI marked M.S. pressed bright finished butt hinges with necessary screws of required size. 2x3’x7’= 42 sft 1x2’-6’x7’-0’= 17.5sft
Providing and fixing wire gauze shutters using galvanized M.S. wire gauze of average width for aperture 1.4 mm in both directions with wire of dia. 0.63 mm for doors, windows and clerestory windows with ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws as per direction of Engineer-in-charge :first class kail wood Qtty vide(8)
Providing hoisting and fixing trusses/purlins rafters/posts/ post-plates or like components including cost of screws etc. complete First class Budloo/Fir wood Main truss:- Tie = 2x 20’-3””x 4”x6”=6.68 cft Posts =2x 6’-0”x4”x4’=1.30cft = 2x2x (3’+1’-6”) x 4”x4”= 1.96cft Struts= 2x2x6’-9”x4”x4”=2.94cft Rafter = 2x2x 11’-8”x3”x5”= 4.78cft Purlins = 2x6x(6’+23’-3”)/2x 4”x4” =19.11cft Hip end:- Tie= 4x12’-10”x4”x6”= 8.46cft Posts= 4(3’+1’-6”) x 4”x4’= 1.96cft Struts = 4x (6’-9”+6’-2”)x4”x4”=5.62cft Rafters = 4x14’-2”x3”x5’=5.8cft Central :- Tie= 2x 8’-0’x4”x6”= 2.64cft Posts= 2x(3’+1’-6”)x4”x4”=0.98cft Struts = 2x 6’-9”x4”x4”=1.47cft Rafters = 2x10’-0”x3”x5”=2.05cft Jack Rafters= 4x7’-3”x4”X4”=3.15cft Purlins =(0’+20’-5”)/2x4”x4”= 1.11cft ------------------- 70.01cft
Providing corrugated G. S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G. I limpet washers or with G. I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape where ever required. 0.63mm thick with zinc coating not less than 27 5gm/sqm including carriage up to site of work a) Roof 2x(6’-0”+23’-3”)/2x11’-8”= 341.05sft 2x(0’+20’-5”)/2x10’-0”=204.1sft T = 545.15sft or 50.66 sqm @ Rs 951.80/sqm
b) :- Weather boarding 0.50 mm thick with zinc coating not less than 275 gram/sqm 2x(23’-3”+15’-3”)x2’-6”=192.5sft
Providing ridges or hips of width 60cm overall width plain G.S. sheets fixed with polymer coated J. or L hooks, bolts and nuts 8mm dia G.I. limpet and bitumen washers complete. 0.63 mm thick with zinc coating not less than 275 gram/sqm (6’-0”+4x14’-2”)= 62.64rft
Providing and fixing plained eaves boarding. 2nd class kail wood 250x32 mm (nominal size ) 2x (23’-3”+20’-5”) = 87.32rft
15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 4 ( 1 cement : 4 fine sand) 2x(12’+10’)x9’-3”=407sft 2(5’+6’)x9’-3”=203.5sft 2(8’+6’)x9’-3”=259sft --------------- 869.5sft D/d openings D= 2x 3’x7’=42sft D2= 2’-6”x7’= 17.5sft W=2x6’x5’=60sft W2= 4’-5’=20sft V=2x4’x2’-6”=20sft -------------------- 159.5sft t = 710sft Add 10% for jamb/sills =71sft T= 781sft
Cement concrete flooring 1:2:4 ( 1 cement: 2 coarse sand .: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. Crushed. Qtty vide (3)a =222 sft
Providing and fixing 12 mm commercial ply wood in partition walls and ceilings including all necessary fixtures complete job including carriage up to site of work. (12’x10’)+(5’x6’)+(6’x8”)
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer qtty vide (15)
Applying priming coat: with ready mixed pink or grey primer of approved brand and manufacture on wood work (hard and soft wood) Qtty vide (12) = 198sft D= 2.25x 3’x7’=47.25sft x2=94.5sft D2= 2.25x2’-6”x7’= 39.37sft W= 2x1.5 x 6’x5’= 90 sft W2= 1.5x 4’x5’= 30sft V= 2x1.5x4’x2’-6”=30sft --------------- 481.87sft
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work Qtty vide (19) =44.78 sqm
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. 12mm 4x2(18’-3”+13’-9”)=256rft 4(12’+6’)72rft = 328rft or 100m @ 0.89kg= 89kg 8mm 3’-6”x497no = 1739.5rft or 530.33m @ 0.39kg= 206.82kg 295.82kg @ Rs 79.25/kg
Carriage of different materials from source to site of work
a) Stone average 500 m by head load Qtty vide (2)= or 11.93 cum @ Rs635.48/cum
b) Sand average 15KM by MT and 500m HL Qtty vide (3) a,b,c = 9.82cum (5)=2.69cum (15) = 1.08cum (16)= 0.46cum T= 14.05 cum @ Rs Rs837.29/cum
c) Stone aggregate 40mm average 15Km by MT and 500m HL Qtty vide (3) a,= 3.35cum @ Rs 906.82/cum
d) Stone aggregate 20mm average 15 Km by MT and 500m HL Qtty vide (3) b,c=16.29 cum (16)= 0.92sqm
e) Cement/ steel/CGI average 10 KM by MT and 500m by HL Qtty vide (3) a,b = 3.73cum @ 170kg =634.1kg = 16.81cum @ 220kg = 3698.2kg = 1.30cum @ 320/cum=416kg (5)=10.79cum@ 62.5/kg=674.37kg (15)= 72.58sqm @6.58kg/sqm= 477.57kg (16)= 20.63sqm@ 320kg/cum= 330.08kg CGI (12)= 50.66 sqm @ 4.32kg/sqm=218.85kg Steel (21)=295.82kg T =6744.99kg or 6.74MT @ Rs463.39/MT
f) Bricks average 70 km by MT and 500m by HL Qtty vide (5)=10.79 cum @475=5125.25 No
MOHD AMIN BODA
M/S SHOWKAT AHMAD SHEIKH
NISAR AHMAD GANAI
MOHD YOUSUF MATOO
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .