Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.7 CrAccepted-AOC 70 INDUSTRIAL AREA PHASE 1 PANCHKULA HARYANA 134113 | PANCHKULA | PANCHKULA | HARYANA | 134113 | L1 | Accepted-AOC L1 | |
| 2 | L2₹36.2 Cr+₹4.6 Cr (14.4%)Rejected-Finance E 207 INDUSTRIAL AREA PHASE VIII B SECTOR 74 MOHALI 160071 PUNJAB | MOHALI | MOHALI | PUNJAB | 160071 | L2 | Rejected-Finance Higher rates | |
| 3 | L3₹46.1 Cr+₹14.5 Cr (45.6%)Rejected-Finance 108A FRIENDS COLONY NEAR M M PUBLIC SCHOOL RAJEEV NAGAR MANDI DABWALI DISTT SIRSA 125104 | MANDI DABWALI | SIRSA | HARYANA | 125104 | L3 | Rejected-Finance Higher rates |
Tender Value
Refer Docs
EMD Value
₹48 L
Closing Date
19 May 2021, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer-II
PSIEC, 3rd Floor, Udyog Bhawan, Sector - 17A,
Upgradation of existing STPs at IFPs Derabassi Chanalon and Mandi Gobindgarh
2021_IC_62678_1
PSIEC/EE-II/TIES/STPs
Open Tender
Civil Works
Turn-key
365 days
IFPs Derabassi, Chanalon and Mandi Gobindgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹25,000
₹48 L
Chandigarh
16 Aug 2021
25 Mar 2021
20 May 2021
25 Mar 2021
19 May 2021
25 Mar 2021
31 Mar 2021
180 days
Amount
Construction rehabilitation, upgradation of existing STP (based on MBBR Technology) Dera Bassi (2 MLD) and setting up/installation of Tertiary Treatment Plant including detailed design/drawings all Civil, Electro-Mechanical and Electrical works with PLC with SCADA, Online monitoring system and CCTV cameras etc and all other works contingent thereto on turnkey basis after testing and commissioning including Trail Run/stabilization period of 3 months, and O&M for 72 months (after 3 months of Trail run but inclusive of operation and maintenance during the period of 12 months of DLP), complete in all respect. This will also include interim operation and maintenance of the plant during the period of construction, rehabilitation and upgradation of the existing STP.
Credit for sludge
Guaranteed Power Consumption for Defect Liability Period of 1 (one) year and 5 years of O & M to be quoted by the bidder for per day electrical consumption in KVaH (Derabassi - 2 MLD)
For 1st year of O & M (i.e. Defect Liability Period)
For 2nd year of O & M
For 3rd year of O & M
For 4th year of O & M
For 5th year of O & M
For 6th year of O & M
Construction rehabilitation, upgradation of existing STP (based on MBBR Technology) Chanalon (2 MLD) and setting up/installation of Tertiary Treatment Plant including detailed design/drawings all Civil, Electro-Mechanical and Electrical works with PLC with SCADA, Online monitoring system and CCTV cameras etc and all other works contingent thereto on turnkey basis after testing and commissioning including Trail Run/stabilization period of 3 months, and O&M for 72 months (after 3 months of Trail run but inclusive of operation and maintenance during the period of 12 months of DLP), complete in all respect. This will also include interim operation and maintenance of the plant during the period of construction, rehabilitation and upgradation of the existing STP.
Credit for sludge
Guaranteed Power Consumption for Defect Liability Period of 1 (one) year and 5 years of O & M to be quoted by the bidder for per day electrical consumption in KVaH Chanalon - 2 MLD)
For 1st year of O & M (i.e. Defect Liability Period)
For 2nd year of O & M
For 3rd year of O & M
For 4th year of O & M
For 5th year of O & M
For 6th year of O & M
Construction rehabilitation, upgradation of existing STP (based on MBBR Technology) Mandi Gobindgarh (3 MLD) and setting up/installation of Tertiary Treatment Plant including detailed design/drawings all Civil, Electro-Mechanical and Electrical works with PLC with SCADA, Online monitoring system and CCTV cameras etc and all other works contingent thereto on turnkey basis after testing and commissioning including Trail Run/stabilization period of 3 months, and O&M for 72 months (after 3 months of Trail run but inclusive of operation and maintenance during the period of 12 months of DLP), complete in all respect. This will also include interim operation and maintenance of the plant during the period of construction, rehabilitation and upgradation of the existing STP.
Credit for sludge
Guaranteed Power Consumption for Defect Liability Period of 1 (one) year and 5 years of O & M to be quoted by the bidder for per day electrical consumption in KVaH Mandi Gobindgarh - 3 MLD)
For 1st year of O & M (i.e. Defect Liability Period)
For 2nd year of O & M
For 3rd year of O & M
For 4th year of O & M
For 5th year of O & M
For 6th year of O & M
Eco Paryavaran Engineers And Consultants Pvt. Ltd.
M/s Sourabh Construction Pvt. Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .