| 1 | L1₹15.8 LAdmitted-Finance | ₹15.8 L | L1 | Admitted-Finance |
| 2 | L2₹16.2 LAdmitted-Finance | ₹16.2 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JVR CONSTRUCTION L2 | R.VENKATESAN L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF DRAINAGE AND DECK SLAB FROM BALA HOUSE TO RAJAKAALVAI AT VISHNU ANANDAM GALAXY MADIVALAM VILLAGE H/O NALLUR | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 173.63 | m3 | 200 ₹34,726 | 181 ₹31,427.03 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 24.8 | m3 | 6,000 ₹1.5 L | 5,670 ₹1.4 L |
| 4.00 | Supplying & Erecting centering for sides & soffiots including necessary & strutting upto 3.29m height for plane surfaces in all cross bracings using mid steel sheets of size 90X60cm & 10 gauge stiffened, welded with steel angle etc., | 595.6 | m2 | 605 ₹3.6 L | 594 ₹3.5 L |
| 5.00 | Deck Bottom | 76.5 | m2 | 1,200 ₹91,800 | 1,189 ₹90,958.50 |
| 6.00 | Plain Cement concrete 1:3:6 mix using 20mm HBG metal for foundation including watering wherever necessary and all cost. | 64.58 | m3 | 6,500 ₹4.2 L | 6,421 ₹4.1 L |
| 7.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification | 1 | MT | 95,420 ₹95,038.32 | 95,420 ₹95,038.32 |
| 8.00 | Cement concrete 1:1-1/2:3 (One Cement, One and a Half crushed stone M.Sand and Three hardbroken stone jelly) using 20mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc., and providing fixtures like fan clamps in the RCC floor / roof smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 15.47 | m3 | 9,500 ₹1.5 L | 9,459 ₹1.5 L |
| 9.00 | Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. | 105.3 | m2 | 700 ₹73,710 | 628.5 ₹66,181.05 |
| 10.00 | Provision for Photographic charges | 1 | no | 500 ₹500 | 400 ₹400 |
Tender Value
₹16.0 L
EMD Value
₹16,000
Closing Date
4 Mar 2026, 3:00 pmClosed
Panchayat office,Nallur
Panchayat office,Nallur
Krishnagiri Dist Hosur Union PGF 25_26 CONSTRUCTION OF DRAINAGE AND DECK SLAB FROM BALA HOUSE TO RAJAKAALVAI AT VISHNU ANANDAM GALAXY MADIVALAM VILLAGE HSR82
2026_RDTN_669287_1
224_2026_A4_14_02_2026
Open Tender
Civil Works - Roads
180 days
Panchayat office, Nallur
Refer tender doc
3 documents required · 3 mandatory
₹0
₹16,000
Panchayat office,Nallur
10 Mar 2026
2 Mar 2026
4 Mar 2026
2 Mar 2026
4 Mar 2026
2 Mar 2026
3 Mar 2026
CONSTRUCTION OF DRAINAGE AND DECK SLAB FROM BALA HOUSE TO RAJAKAALVAI AT VISHNU ANANDAM GALAXY MADIVALAM VILLAGE H/O NALLUR
Earth work excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffiots including necessary & strutting upto 3.29m height for plane surfaces in all cross bracings using mid steel sheets of size 90X60cm & 10 gauge stiffened, welded with steel angle etc.,
Deck Bottom
Plain Cement concrete 1:3:6 mix using 20mm HBG metal for foundation including watering wherever necessary and all cost.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification
Cement concrete 1:1-1/2:3 (One Cement, One and a Half crushed stone M.Sand and Three hardbroken stone jelly) using 20mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc., and providing fixtures like fan clamps in the RCC floor / roof smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Provision for Photographic charges
Provision for Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.68 MB
PB82.pdf
Tender Documents • 0.60 MB
TB82.pdf
Tender Documents • 0.90 MB
BOQ_804195.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid