| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.5 LAccepted-AOC | L1 | Accepted-AOC As per Work order | |
| 2 | L2₹31.0 L+₹2.5 L (8.64%)Rejected-Finance | L2 | Rejected-Finance lowest 2nd as per CST. | |
| 3 | Not Admitted-Fee/PreQual/Technical 10 KIRPAL APARTMENT 44 I P EXTENSION EAST DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
Tender Value
₹32.9 L
EMD Value
₹65,800
Closing Date
28 Jul 2023, 3:00 pmClosed
Chief Engineer, NRG
WIP, BARC, Trombay Mumbai.
Modification and maintenance of ventilation system and negative pressure system with its associated Piping, lab exhaust, fume hood and cooling system at NRG, BARC, Trombay as per the technical specification
2023_BARC_759740_1
BARC/NRG/PSDD/EDS/ETP LAB /2023/79668
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
240 days
ETP BARC Trombay
Please refer tender documents
8 documents required · 8 mandatory
₹0
₹65,800
19 Dec 2023
30 Jun 2023
2 Aug 2023
30 Jun 2023
28 Jul 2023
3 Jul 2023
30 Jun 2023 - 14 Jul 2023
Amount
Design, manufacturing, assembly, inspection, factory testing, painting, packaging, delivery, installation, commissioning and performance evaluation of SS304 exhaust fans along with motor, starter panel and all accessories, RCC foundation with anti vibration pads, anti bird meshat discharge end and protective mild steel shed as per technical specification (refer Table 1). Fan capacity: 3000 CMH, Static: 150 mm WC.
Dismantling of two number of SS fume hoods along with its ducting, modification of false ceiling at DC9; shifting of same fume hoods from room No DC9 to DC13, ETP. Removal of PVC duct of existing four number fume hoods, and dispose at TVS stores.Required tools & logistics are in the scope of bidder .
Dismantling and cutting of MS fume hoods along with its ducting, modification of false ceiling at DC13, ETP. Disposal of generated scrap at TVS stores as per department procedures. Required tools & logistics are in the scope of bidder .
TIG Welding of SS 304 pipe with DP testing of pipe size 8”, 10" and 12” using high purity Argon gas (99.995% min)
Erection of SS304 Piping in various sizes up to 300 NB size
Providing of SS Damper single louver for fume hood size: 250 mm diameter with geared chain-pully block. Damper shall be installed at 2 mts height on the fume hood and shall be operated from the ground using chain arrangement.
Providing of SS Damper single louver for fume hood size: 200 mm diameter with geared chain-pully block. Damper shall be installed at 2 mts height on the fume hood and shall be operated from the ground using chain arrangement.
SS 304 300 NB Sch.10 welded Pipe for connecting blowers and 6 Nos. fume hood.
SS 304 250 NB Sch.10 welded Pipe for connecting main header and 3 Nos. fume hood.
SS 304 200 NB Sch.10 welded Pipe for connecting blowers and 3 Nos. fume hood.
MS support structure for 300 NB, 250 NB & 200 NB SS piping. MS Angle 50x50 X 6 along with reqiured all SS Nut, Bolts , Gaskets, Washers, Shims , anchor fasteners, clits and misc items
Providing and fixing of manual Stainless Steel butterfly valve wafer type of 300 mm NB, class 150
Providing and fixing of SS Flange for butterfly valve, 300 mm NB, Class 150.
Providing and fixing of SS Flange suitable for damper, 250 mm NB.
Providing and fixing of SS Flange suitable for damper, 200 mm NB
Providing and fixing of SS 304 300 NB sch 10 Tee
Providing and fixing of SS 304 300 NB sch 10 elbow
Providing, inspection, testing,supply, installation and erection of 0.5 mm thick Stainless Steel Bellows of 300NB size with 4-6 convolutions and Class 150 flanges suitable for ventilation fans as per technical specification .
Fabrication and installation of SS304 100 NB Butter fly valve with flanged end
Fabrication and installation of suitable SS Flange for butterfly valve, 100 NB
Fabrication and installation of pipe 100 NB Sch 10 SS 304
Providing and installation Vacuum gauges +/-250 mm Wc along with SS nipple and needle valve of suitable size
Fabrication, installation, testing and commissioning of VRV cooling system consists of 3 number of multi split (1ton each) indoor unit with one common out door unit along with required accessories like copper piping, cables accessories, fixtures, MS stand & protective shed etc. aproximate distance between IDU and ODU is 100 Ft.
Fabrication, installation, testing and commissioning of VRV cooling system consists of 1 number of 2 ton split indoor unit with one out door unit. along with required accessories like copper piping, cables accessories, fixtures, MS stand & protective shed etc. aproximate distance between IDU and ODU is 75 Ft.
Providing, installation, testing and commissioning of 1.0 Ton spilt AC unit, at CDCFT Building as per table 4B in technical specification
Providing, installation, testing and commissioning of 1.5Ton spilt AC units, at WIP building as per table 4B in technical specification
Providing, installation, testing and commissioning of 1Ton window AC units for PsDD Lab, WIP Building as per table 4C in technical specification
chirag engineeing work
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .