Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.0 LAdmitted-Finance | -47.50% | ₹15.0 L | L1 | Admitted-Finance |
| 2 | L2₹15.3 L+₹30,186.79 (2.02%)Admitted-Finance 5546 NICHOLSON ROAD SADAR BAZAR AMBALA HARYANA 133001 | AMBALA | HARYANA | 133001 | -46.44% | ₹15.3 L+₹30,186.79 (2.02%) | L2 | Admitted-Finance |
| 3 | L3₹16.5 L+₹1.6 L (10.5%)Admitted-Finance | -42.00% | ₹16.5 L+₹1.6 L (10.5%) | L3 | Admitted-Finance |
| 4 | L4₹17.1 L+₹2.1 L (14.3%)Admitted-Finance | -39.99% | ₹17.1 L+₹2.1 L (14.3%) | L4 | Admitted-Finance |
| 5 | L4₹17.1 L+₹2.1 L (14.3%)Admitted-Finance ZIRAKPUR PUNJAB | S A S NAGAR | PUNJAB | 140103 | -39.99% | ₹17.1 L+₹2.1 L (14.3%) | L4 | Admitted-Finance |
Tender Value
₹28.5 L
EMD Value
₹56,956
Closing Date
8 Jul 2026, 3:00 pmClosed
EE,NPD-6,DDA
EE,NPD-6,DDA
Repair and maintenance of boundary wall around vacant plots in Sector A-1 to A-4 under the jurisdiction of NPD-6
2026_DDA_915255_1
07/EE/NPD-6/DDA/2026-27
Open Tender
Civil Works
Works
60 days
NARELA
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹56,956
23 Jul 2026
1 Jul 2026
9 Jul 2026
1 Jul 2026
8 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick work with clay flyash F.P.S. (non modular) brick of class designation
7.5 in superstructure above plinth level up to floor five level in : 6.32.2 Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | 9,095.05 | - |
| 2 | 15 mm cement plaster on rough side of single or half brick wall of mix: 13.5.2 1:6 (1 cement: 6 coarse sand) | - | sqm | 395.35 | - |
| 3 | Providing and laying cement concrete in retaining walls, return walls, walls thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:
4.2.3A 1:24 (1 Cement : 2 coarse sand (zone-lll) including manufactured sandderived from Recycled Concrete Aggregate (RCA) upto 25% : 4 graded stone aggregate 20 mm nominal size including Recycled Concrete Aggregate (RCA) upto 25%). | - | cum | 9,671.5 | - |
| 4 | Finishing walls with water proofing cement paint of required shade :
13.44.1 New work (Two or more coats applied @ 3.84 kg/10 sqm) | - | sqm | 116.9 | - |
| 5 | Total=2897857.50 | - | - | - | - |
| 6 | Apply GST correction Factor of 0.973=2819615.00 | - | RS | 78,242 | - |
| 7 | Adding Cost Index @ 1% =2847811.15 | - | RS | 28,195 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
NIT07.pdf
Tender Documents • 2.62 MB
BOQ_961850.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .