| Sl No | Description | Qty | Unit | K K POWER CONSTRUCTION L1 | UNITED ENGINEERING L2 |
|---|---|---|---|---|---|
| 1.00SECTION-A | |||||
| 2.00CLEANING OF BOILER | |||||
| 3.00 | COMPLETE EXTERNAL CLEANING OF BOILER FROM TOP TO BOTTOM | 1 | Job | 2,25,786 ₹2.7 L | 2,33,482 ₹2.8 L |
| 4.00 | INTERNAL CLEANING OF BOILER IN SECOND PASS | 1 | Job | 58,440 ₹68,959.20 | 60,984 ₹71,961.12 |
| 5.00 | CLEANING OF ASH FROM ECONOMISER HOPPER WITH CONNECTING DUCTS | 1 | Job | 58,440 ₹68,959.20 | 60,984 ₹71,961.12 |
| 6.00 | CLEANING OF PENT HOUSE, CAT HOUSE, DEAD CHAMBER | 1 | Job | 3,15,786 ₹3.7 L | 3,25,480 ₹3.8 L |
| 7.00 | CLEANING OF PENT HOUSE ROOF | 1 | Job | 31,440 ₹37,099.20 | 32,548 ₹38,406.64 |
| 8.00PREPARATION OF SCAFFOLDING | |||||
| 9.00 | PREPARATION OF SCAFFOLDING IN BOILER HORIZONTAL PASS (SCREEN TUBES, REHEATER, FINAL SUPER HEATER) | 1 | Job | 58,440 ₹68,959.20 | 61,150 ₹72,157 |
| 10.00 | PREPARATION OF SCAFFOLDING ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS & C-HEADER. | 1 | Job | 47,820 ₹56,427.60 | 49,619 ₹58,550.42 |
Updated dates
Tender Value
₹2.3 Cr
EMD Value
₹2.3 L
Closing Date
19 Jan 2026, 3:00 pmClosed
CE GEN ATPS
O/o SE PNW ATPS
Work contract for annual overhauling of pressure part in 210 MW ATPS Chachai
2025_MPPGC_462904_1
1874/MM
Open Tender
Miscellaneous Works
40 days
ATPS Chachai
As per NIT
7 documents required · 7 mandatory
₹5,000
Yes
₹2.3 L
Yes
9 Mar 2026
5 Dec 2025
22 Jan 2026
5 Dec 2025
19 Jan 2026
5 Dec 2025
CLEANING OF BOILER
PREPARATION OF SCAFFOLDING
INSPECTION
CLEANING AND REPAIR OF WIND BOX
WITHOUT STEEL
DYE PENETRATION TEST (DP TEST) WITH KIT
TRANSPORTATION OF ASH, SCRAPS, MS SCRAPS, DEBRIES AND OTHER WASTE MATERIALS ( INCLUDING LOADING/UNLOADING)
HYDRO JET CLEANING OF COMPLETE BOILER PRESSURE PARTS
SECTION-B
RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE (SHIELDING) IN VARIOUS AREAS OF BOILER TUBES.
RECTIFICATION, REPLACEMENT AND REFIXING OF CASSETTE BAFFLES IN VARIOUS AREAS OF BOILER TUBES.
EROSION SHIELD
FABRICATION & FIXING OF EROSION SHIELD
PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY/ OXIDE SCALE MEASUREMENT/ STRESS RELIEVING/DPT
WELDING OF HP JOINTS OF BOILER TUBES
WATER WALL TUBES-SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC.
LTSH TUBES AND ASSOCIATED STEAM COOLED WALL
ECONOMISER SUPPORT TUBES
REHEATER
ECONOMISER TUBES
WELDING OF FINS
RE-ENFORCEMENT OF WELDED JOINTS ECONOMISER SLING REHEATER DRUM VENT LTSH
WELDING & REPLACEMENT OF DRAIN & VENT* JOINTS
WELDING & REPLACEMENT OF TRACING LINE / SAMPLING LINE
PAD WELDING OF ERODED TUBES OF VARIOUS SIZE
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS ( SIZE 50MM X 50MM)
ALIGNMENT OF COILS/ TUBES / BLOWERS
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GR.A+GR.C)
SECTION-C
COMPLETE SERVICING/OVERHAULING OF HP VALVES
GLAND PACKING OF HP VALVES
COMPLETE SERVICING OF VALVES (EXCLUDING ACTUATOR):
REPLACEMENT OF VALVES (WELDED TYPE)
SECTION-D
COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES (SV)
SECTION-E
REPAIR OF PENT HOUSE OF BOILER
REPAIR OF PENT HOUSE BY PATCHING (WITHOUT STEEL)
REPAIRING OF DEAD CHAMBER
REPAIR OF DEAD CHAMBER BY PATCHING
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES
REPAIR & SERVICING
BUCKSTAYS
REPALCEMENT/ REPAIRING OF ECONOMISER MODULE (CONSIST OF 2 COILS BOTH LOWER & UPPER BANK)
PAINTING OF TAKEN OUT ECONOMISER COILS
REPAIRING OF BURNER CASING
WITH STEEL
WITHOUT STEEL
DISMNETLING, INSTALLATION, FEBRICATION OF STRUTURE & MISC. WORKS I.E. CANOPY, BROKEN STAIR/RAILING/DRAIN COVERING ETC.
REPAIRING OF CAT HOUSE
WITH STEEL
WITHOUT STEEL
SERVICING, CLEANING & REPAIRING OF SAMPLING LINE COOLERS
SERVICING & REPAIRING OF HANGERS & SUPPORTS
SECTION-F
FIXING OF CORRUGATED GI SHEET AT BOILER ROOF & OTHER PLACES
DISPOSAL OF RUBBISH THERMAL INSULATION
REPAIRING OF HEADER STUBS HAND HOLE PLUGS
Insulation Work
REMOVAL / APPLICATION OF THERMAL INSULATION IN COMPLETE BOILER FROM BOTTOM ASH HOPPER TO PENT HOUSE
REMOVAL / APPLICATION OF THERMAL INSULATION IN STEAM AND WATER PIPING
REMOVAL /APPLICATION OF THERMAL INSULATION IN ESP
REMOVAL / APPLICATION OF THERMAL INSULATION IN AIR HEATER & HOPPER
COAL MILL, FUEL OIL AND ITS STEAM PIPING INCLUDING HEATERS FILTERS ETC.
FLUE GAS & HOT AIR DUCT
SHEETING WORK OVER INSULATION (WHERE INSULATION IS IN GOOD CONDITION)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
SBDGFRCHKListBiddersdetails.pdf
Tender Documents • 8.44 MB
Schedule462904.pdf
Tender Documents • 1.40 MB
Technicalbidworks462904.xls
Tender Documents • 1.48 MB
BOQ_548381.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid