Loading…
Loading…
Tender Value
₹9 L
EMD Value
₹9,000
Closing Date
15 Oct 2026, 3:00 pm
BDO BP
KNR union at Padappai
Construction of CC Drainage with RCC Cover Slab in Ambedkar Street at Tharapakkam Panchayat Under Panchayat Union General Funds Scheme of the Year 2026-27
2026_RDTN_709768_1
2247 / 2026 / A2 / KNR 2 / Dated 29.09.2026
Open Tender
Civil Works - Others
Works
120 days
Tharapakkam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,000
1 Oct 2026
1 Oct 2026
15 Oct 2026
1 Oct 2026
15 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 102.5 | Cum | - | - | 18% |
| 2 | Collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications | 17.37 | Sqm | - | - | 18% |
| 3 | Plain Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. | 17.37 | Cum | - | - | 18% |
| 4 | Supply & Erecting centring for Sides & Soffits of CC Works Including cost & conveyance of all Materials and all Labour charges | 303.98 | Sqm | - | - | 18% |
| 5 | Plain Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. | 26.63 | Cum | - | - | 18% |
| 6 | Plastering with CEMENT MORTAR 1:5 (one cement and Five sand) 20 mm. thick in all floor including curing etc.Complete complying with standard specification. | 57.9 | Sqm | - | - | 18% |
| 7 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete | 568.66 | Kgs | - | - | 18% |
| 8 | Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. | 12.14 | Cum | - | - | 18% |
| 9 | Provision for Manhole Cover SFRC including cost of Materials & all labour charge etc.,complete | 19 | Each | - | - | 18% |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.26 MB
sce.pdf
Tender Documents • 0.77 MB
BOQ_852846.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .