Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 LAccepted-AOC 26 2 BHASKAR CIRCLE RATANADA JODHPUR RAJASTHAN 342005 | JODHPUR | JODHPUR | RAJASTHAN | 342005 | ₹20.2 L Quoted ₹20.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹24.1 L+₹3.4 L (16.3%)Rejected-AOC | ₹24.1 L+₹3.4 L (16.3%) | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
| 4 | Rejected-Technical NO 121 6 SATHANUR MAIN ROAD SATHANUR BANGALORE KARNATAKA 560064 | BENGALURU URBAN | KARNATAKA | 560064 | - | - | Rejected-Technical Technically Disqualified 1. Due to non-submission of MAF from approved manufacturer as per NIT offered product 2. Offered product is not among the approved make as per NIT |
| 5 | Rejected-Technical A 138 CITY CENTER SC ROAD JAIPUR RAJASTHAN 302001 | JAIPUR | RAJASTHAN | 302001 | - | - | Rejected-Technical Technically Disqualified Due to non-submission of completion certificate meeting similar work experience criteria as per NIT |
| Sl No | Description | Qty | Unit | POWERTRAC CORPORATION L2 | MACH ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Part A SITC of 100 KVA modular UPS with initial rated capacity of 50 KVA and scalable upto 100 KVA | |||||
| 1.10 | Online UPS- Input supply: Three Phase, Output supply: Three Phase.
Supplying, installation, Testing & Commissioning of following capacity at full load (Unity Power Factor) at operating temperature 0 to 40 0C, Relative humidity 0 to 95%, Online double conversion true sine wave Uninterrupted hot swapable (allow for the replacement or addition of battery modules withoutshutting down the entire system) modular Power Supply (UPS) system with N+1 modules (N denotes total number of modules required for rated capacity).The UPS shall include a Rectifier, inverter, battery bank suitable for 30 minutes back up (Battery VAH capacity shall not be less than 1600 VAH per KVA of UPS rating per Hour backup time) on full load(Battery shall be VRLA, SMF in ABS Container) and Static Bypass switch along with manual bypass, suitable isolation transformer for additional protection against neutral faults etc. UPS shall have inbuilt phase sequence correction. The UPS systems offered are to be of the latest technology with Digital Control Microprocessor based for reliable operation using Insulated Gate Bipolar Transistor (IGBT)'s both for the rectifier & inverter (3 Level) with PWM (Pulse Width Modulation). The quality of design, manufacturing and inspection process should confirm to the relevant Inter-national standards such as IEC/EN/VDE. The operating efficiency of the UPS systems shall be >96% while operating on battery mode and delivering qualitypower to the 100% non-linear loads. Current total harmonic effect(ITHD) on the input grid shall be < 5% at 50 %load. (The required LC ( inductor (L) and a capacitor (C)) filters shall be included in UPS cost), extreme power factor kit to be included to limit the input power factor (PF) to 0.99 and output power factor shall be unity (i.e. kw rating of the UPS shall be kva rating x 1 ), however UPS shall be suitable to take load at 0.7 laging to 0.7 leading power factor loads. UPS shall be suitable for incoming supply AC : 3Phase 400V +/-20%, 50 Hz +/-5 Hz, AC Output voltage: 3Phase 415 Volt, 50 Hz +/- 0.2Hz, Overload capacity of 120% for 10 mins, Sine wave output. Non condensing, noise level less than 60db at 1 meter distance, protections: Input Under voltage over voltage, abnormal out voltage, battery over charging, output over current, short circuit protection, battery deep discharge protection, 10KV surge. UPS must comply with low voltage electromagnetic compatibility (EMC) achieved as per EN 6204, EN6204 Part I and Part 2, it shall be a Voltage and Frequency Independent (VFI)-type UPS. . Communication RS232/RS485/SNMP port open protocol for BMS integration, all hardware & software for iOT Communication as per approved by Engineering in charge. Required battery racks and interconnecting copper conductor cables of suitable size and connectors and all required accessories are inclusive of the cost). This system must provide a means for logging and alarming of all monitored points plus email notification. Forced air-cooling with integral inbuilt fans with redundancy (if one fan fail UPS should be able to handle at least 80% of the load, Noise Level 65 DB at 1 meter distance. The system shall be in compliance IEC 62040- 1,2 & 3, IS: 16242 and CPWD Specification. Display Panel (minimum) (In-build 5 inch or more LC Display / LED) to display :
a) Input: Voltage, current, Frequency.
b) Bypass: Voltage, Frequency.
c) Output: Voltage, frequency, Current.
d) Battery:Voltage, Capacity.
e) Load: KVA, KW, Percentage.
f) Temperature: STS, Inverter, PFC.
g) Event Logging & Statistical Data (On LCD/LED): UPS should capture and display up to 3000 events like: Over temperature / DC Bus Fail / Fan Fail / Fuse Fail / Overload / Short-circuit / Device Fail / Inverter Fail / Rectifier Fail / Bypass Fail, etc.
h) Statistical Data: No. of power failures / Transfers to Bypass / Total Running time, etc.
i) Mains Mode of Operation /Battery Mode of Operation / Bypass feeding the load / UPS Fault /Battery charging and discharging, overload, battery voltage and battery capacity.
j) Audible Alarms : Mains Failure, Battery Low Alarm, UPS Overload, Fault, Shutdown, Input Over, Under Voltage, Output Over, Under Voltage, Battery Over, Under Voltage, Over Load and short circuit, Over Temperature. The UPS should have QR code which should contain drawing, test report OEM manual, Geo- Tag of manufacturing location etc
100 KVA (Each Power module shall be <= 25 KVA)
100 KVA UPS with inital rated capacity of 50 KVA and scaleable upto full load of 100 KVA. The UPS should have N+1 redundancy (N denotes total number of modules required for rated capacity) | 1 | Each | 21,88,931 ₹21,88,931 | 20,59,000 ₹20,59,000 Lowest |
| 2.00Part B: Comprehensive Maintenance Contract of UPS | |||||
| 2.10 | CAMC of UPS 1st Year (After completion of DLP of one year on UPS) | 1 | Job | - | 5,000 ₹5,000 Lowest |
| 2.20 | CAMC of UPS 2nd Year | 1 | Job | 1,06,200 ₹1,06,200 | 5,000 ₹5,000 Lowest |
| 2.30 | CAMC of UPS 3rd Year | 1 | Job | 1,16,820 ₹1,16,820 | 5,000 ₹5,000 Lowest |
Tender Value
₹20.2 L
EMD Value
₹40,394
Closing Date
25 Feb 2026, 11:00 amClosed
Executive Engineer (Electrical)
IWD Office IIT Goa
Supply, Installation, Testing and Commissioning of 100 KVA modular UPS with initial rated capacity of 50 KVA and scalable upto 100 KVA at Academic Block II IIT Goa
2026_ITG_899261_1
IITGOA/IWD/2025/32 dtd 19.02.2026
Open Tender
Electrical Works
Item Rate
30 days
IIT Goa
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹40,394
22 Apr 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
19 Feb 2026 - 25 Feb 2026
Part A SITC of 100 KVA modular UPS with initial rated capacity of 50 KVA and scalable upto 100 KVA
Online UPS- Input supply: Three Phase, Output supply: Three Phase. Supplying, installation, Testing & Commissioning of following capacity at full load (Unity Power Factor) at operating temperature 0 to 40 0C, Relative humidity 0 to 95%, Online double conversion true sine wave Uninterrupted hot swapable (allow for the replacement or addition of battery modules withoutshutting down the entire system) modular Power Supply (UPS) system with N+1 modules (N denotes total number of modules required for rated capacity).The UPS shall include a Rectifier, inverter, battery bank suitable for 30 minutes back up (Battery VAH capacity shall not be less than 1600 VAH per KVA of UPS rating per Hour backup time) on full load(Battery shall be VRLA, SMF in ABS Container) and Static Bypass switch along with manual bypass, suitable isolation transformer for additional protection against neutral faults etc. UPS shall have inbuilt phase sequence correction. The UPS systems offered are to be of the latest technology with Digital Control Microprocessor based for reliable operation using Insulated Gate Bipolar Transistor (IGBT)'s both for the rectifier & inverter (3 Level) with PWM (Pulse Width Modulation). The quality of design, manufacturing and inspection process should confirm to the relevant Inter-national standards such as IEC/EN/VDE. The operating efficiency of the UPS systems shall be >96% while operating on battery mode and delivering qualitypower to the 100% non-linear loads. Current total harmonic effect(ITHD) on the input grid shall be < 5% at 50 %load. (The required LC ( inductor (L) and a capacitor (C)) filters shall be included in UPS cost), extreme power factor kit to be included to limit the input power factor (PF) to 0.99 and output power factor shall be unity (i.e. kw rating of the UPS shall be kva rating x 1 ), however UPS shall be suitable to take load at 0.7 laging to 0.7 leading power factor loads. UPS shall be suitable for incoming supply AC : 3Phase 400V +/-20%, 50 Hz +/-5 Hz, AC Output voltage: 3Phase 415 Volt, 50 Hz +/- 0.2Hz, Overload capacity of 120% for 10 mins, Sine wave output. Non condensing, noise level less than 60db at 1 meter distance, protections: Input Under voltage over voltage, abnormal out voltage, battery over charging, output over current, short circuit protection, battery deep discharge protection, 10KV surge. UPS must comply with low voltage electromagnetic compatibility (EMC) achieved as per EN 6204, EN6204 Part I and Part 2, it shall be a Voltage and Frequency Independent (VFI)-type UPS. . Communication RS232/RS485/SNMP port open protocol for BMS integration, all hardware & software for iOT Communication as per approved by Engineering in charge. Required battery racks and interconnecting copper conductor cables of suitable size and connectors and all required accessories are inclusive of the cost). This system must provide a means for logging and alarming of all monitored points plus email notification. Forced air-cooling with integral inbuilt fans with redundancy (if one fan fail UPS should be able to handle at least 80% of the load, Noise Level 65 DB at 1 meter distance. The system shall be in compliance IEC 62040- 1,2 & 3, IS: 16242 and CPWD Specification. Display Panel (minimum) (In-build 5 inch or more LC Display / LED) to display : a) Input: Voltage, current, Frequency. b) Bypass: Voltage, Frequency. c) Output: Voltage, frequency, Current. d) Battery:Voltage, Capacity. e) Load: KVA, KW, Percentage. f) Temperature: STS, Inverter, PFC. g) Event Logging & Statistical Data (On LCD/LED): UPS should capture and display up to 3000 events like: Over temperature / DC Bus Fail / Fan Fail / Fuse Fail / Overload / Short-circuit / Device Fail / Inverter Fail / Rectifier Fail / Bypass Fail, etc. h) Statistical Data: No. of power failures / Transfers to Bypass / Total Running time, etc. i) Mains Mode of Operation /Battery Mode of Operation / Bypass feeding the load / UPS Fault /Battery charging and discharging, overload, battery voltage and battery capacity. j) Audible Alarms : Mains Failure, Battery Low Alarm, UPS Overload, Fault, Shutdown, Input Over, Under Voltage, Output Over, Under Voltage, Battery Over, Under Voltage, Over Load and short circuit, Over Temperature. The UPS should have QR code which should contain drawing, test report OEM manual, Geo- Tag of manufacturing location etc 100 KVA (Each Power module shall be <= 25 KVA) 100 KVA UPS with inital rated capacity of 50 KVA and scaleable upto full load of 100 KVA. The UPS should have N+1 redundancy (N denotes total number of modules required for rated capacity)
Part B: Comprehensive Maintenance Contract of UPS
CAMC of UPS 1st Year (After completion of DLP of one year on UPS)
CAMC of UPS 2nd Year
CAMC of UPS 3rd Year
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 25.02 MB
BOQ_945211.xls
BOQ • 0.36 MB
NITUPSFINAL32.pdf
Tender Documents • 25.00 MB
Corrigendum.pdf
PDF • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .