| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-Finance | 1 | Accepted-Finance lowest | |
| 2 | 2₹2.0 L+₹19.84 (<0.01%)Accepted-Finance | 2 | Accepted-Finance 2nd lowest | |
| 3 | 3₹2.0 L+₹711.50 (0.36%)Accepted-Finance GOPALKATA GOSABA SOUTH 24 PARGANAS | KOLKATA | WEST BENGAL | 700070 | 3 | Accepted-Finance highest |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
6 Dec 2022, 6:00 pmClosed
PRADHAN, KALIACHAK-I GP
KALIACHAK-I GP
Construction of Drain with cover from H/o-Doyal to H/o-Dinesh Jaju at Baburhat under Kaliachak -I Gram Panchayat.( FUND- PBG-SFC)
2022_ZPHD_425260_8
NIeT 02/K-IGP/2022-23
Open Tender
CIVIL WORKS
Item Rate
30 days
BABURHAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
PRADHAN
₹4,000
15 Dec 2025
23 Nov 2022
9 Dec 2022
23 Nov 2022
6 Dec 2022
23 Nov 2022
Amount
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, leveling, dressing and ramming the bottom, bailing out water as required complete. (P - 1, I - 2a) (a) Depth of excavation not exceeding 1500 mm.
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. (P - 14, I - 1)
Cement concrete with graded stone balast (40 mm. size) excluding shuttering. In ground floor and foundation (P - 34, I - 22) (a) 6:3:1 proportion
Brick work with 1st class bricks in cement mortar(4:1) proportion. (a) In foundation and plinth (P - 15, I - 7a)
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. Rajmahal variety (P - 26, I - 10)
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface, including throating, nosing and drip course where necessary(ground floor). (a)With 4:1 cement mortar (i) 15mm. thick plaster (P - 189, I - 1(ii)b)
Neat cement punning about 1.5 mm. thick in wall dado, window, sills, floor, drain etc. (P - 192, I - 15)
Hire and labour charges for shuttering with hard wood for precast R.C. Slab curved, or straight and striking out the same including fitting fixing the precast slab in position with necessary carriage and haulage, hoisting etc. complete in all respect. (P - 43, I - 38)
Reinforcement for reinforced concrete work in the all sorts of structure including distribution bars, binders etc. including supply of rods, initial straightening and removal of loose rust(if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and up to roof of ground floor/up to 4m. (I) Tor steel/Mild steel (P - 43, I - 40 a(i))
Add GST @ 12.00%
Add Labour Wellfare Cess @ 1.00%
Add contingency with display Board 3.0%
HOSSAIN SK
M R Construction
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .