Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹32,000
Closing Date
30 Sept 2026, 3:00 pm3d left
SE Ayodhya
Ayodhya Circle U.P. Avas Evam Vikas Parishad, Office Complex, Anguri Bagh, Ayodhya -224001
CONSTRUCTION OF TOILET BLOCK AT KASTURBA GANDHI BALIKA VIDHYALAYA SURATGANJ, DISTT- BARABANKI.
2026_UPHDB_1188432_1
1635/M-10/445 Dated 14.09.2026
Open Tender
Civil Works
Fixed-rate
90 days
BARABANKI
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
EE CD Ayodhya 01
₹32,000
21 Sept 2026
21 Sept 2026
30 Sept 2026
21 Sept 2026
30 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches. | 29 | CUM | 130.46 | ₹3,783.41 |
| 2 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | 8 | CUM | 5,006.82 | ₹40,054.56 |
| 3 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work. | 3 | CUM | 1,560.96 | ₹4,682.88 |
| 4 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and around the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground. floor only shall be measured as per I.S.6313(PartII 1981)Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1)Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4) Treatment of soil along external perimeter of building 7.5 liters/sqm. (5) Treatment of soil under apron along external perimter 5 liters/sqm. | 38 | SQM | 227.89 | ₹8,659.82 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) [M-20] | 1 | CUM | 6,648.63 | ₹6,648.63 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [M-20] | 3 | CUM | 8,456.54 | ₹25,369.62 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [M-20] | 10 | CUM | 8,456.54 | ₹84,565.4 |
| 8 | M-150 brick work in one cement & four coarse sand 2.25 F.M. mortar in foundation and plinth including supply of all materials labour, tools and plants etc. required for proper completion of the work. | 14 | CUM | 6,935.57 | ₹97,097.98 |
| 9 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | 8 | SQM | 107.42 | ₹859.36 |
| 10 | M-150 Brick work in super-structure above plinth level up to floor two level (up to two storeys) including necessary cutting and moulding of bricks as required and also including honey comb brick work thickness of wall not to be less than 1.5 brick thick. (1:4 cement & coarse sand) | 11 | CUM | 8,386.24 | ₹92,248.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.80 MB
FINANCALBID.pdf
Tender Documents • 0.17 MB
TECHNICALBD.pdf
Tender Documents • 9.45 MB
BOQ_2238795.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .