Loading…
Loading…
Tender Value
₹14.7 Cr
EMD Value
₹8.8 L
Closing Date
2 May 2025, 12:00 pmClosed
Cess repairing/Standardization of bank under Sr.DEN/2/DNR (Total=58.00 TKM)
W7ETENDER2OPENDNR25-26-14
W7ETENDER2OPENDNR25-26-14
Open
12 Months
Surajpur, Chhattisgarh
₹0
₹8.8 L
9 Apr 2025
9 Apr 2025
Item Breakup - B-Sch-B
8700.00 except rock Turfing / planting, including all lead & lift and watering as required until properly rooted with. Note: Initially payment of only 40% will be made. Balance 60% will be paid after 3 months of maintenance period, only if the turfing is properly rooted on entire turfed area.
389064.00 7777.57 square closely laid. Sqm Provision of barricading with contractor's bamboos / ballies vertical post of 100mm dia. planted at every 2m interval, projecting at least 1.5m above ground level and driven firmly (minimum 0.5m) inside ground and including painting verticals & horizontals with red luminous paints / strips at alternative bay on barricade. Barricades shall be maintained through out the execution of the work and shall be removed in workman like manner on completion of the work only after instruction of Engineer in-Charge. Note: (1) 60% payment shall be made on provision of barricading at work-site and balance 40% payment after removal of barricades. (2) The released bamboos / ballies shall be the property of the Contractor.
58000.00 minimum 50mm dia. spaced equally
58000.00 one horizontal pattern of minimum 5mm dia. DANAPUR DIVISION-ENGINEERING/EAST CENTRAL RLY
4350.00 from track, duly digging / scarifying ballast by beaters / wire brushes or any mechanical means, leveling and dressing formation with specified cross slope after salvaging ballast, separating muck by screening the salvaged ballast with contractor's 20mm size sieve, stacking of screened ballast for measurement, disposing off muck at specified locations with all lead & lifts as directed by Engineer in- charge. Note: Payment shall be made for quantity of ballast stacked after screening of retrieved ballast from track.
249400.00 Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction using suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment. Total 146730351.44
Download all tender documents and submit your bid