| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 CrAdmitted-Finance | -22.54% | ₹4.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.2 CrAdmitted-Finance | +0.00% | ₹5.2 Cr | L2 | Admitted-Finance |
| 3 | L2₹5.2 CrAdmitted-Finance | +0.00% | ₹5.2 Cr | L2 | Admitted-Finance |
| 4 | L2₹5.2 CrAdmitted-Finance N A | NA | NA | 121004 | +0.00% | ₹5.2 Cr | L2 | Admitted-Finance |
| 5 | L2₹5.2 CrAdmitted-Finance | +0.00% | ₹5.2 Cr | L2 | Admitted-Finance |
Tender Value
₹5.2 Cr
EMD Value
₹5.2 L
Closing Date
4 Apr 2026, 5:30 pmClosed
CCE Cuttack RandB Circle
O/o CCE Cuttack RandB Circle
Building work
2026_EICCL_127501_2
CCE.Ctc.(RandB)17/2025-26
National Competitive Bid
Civil Works - Buildings
180 days
Cuttack
As per DTCN
3 documents required · 3 mandatory
₹10,000
₹5.2 L
Yes
12 Jun 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
4 Apr 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Civil Work- Dismantling & Removing cement plaster including stacking the useful materials for reuse and removing the debris within 50m lead with cost of all labour etc. complete. | ||||||
| 2Dismantling and removing doors, windows and ventilators including stacking the useful materials for reuse and removing the debries within 50m lead etc complete as per specification and direction of Engineer in charge | ||||||
| 3Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,labour cess,T&P,sundries etc. as directed by the Engineer in charge. | ||||||
| 4Carriage of surplus / excavated earth by mechanical means upto 5km lead including cost of all labour for loading and unloading charges, transportation and spreading in layers at the dumping area etc complete as per specification and direction of Engineer in charge | ||||||
| 5Supplying of filling sand in foundation and plinth including watering,ramming, consolidating and dressing, labours, tools, taxes etc., all complete as per the specification and direction of Engineer-In-Charge. | ||||||
| 6Providing and laying plain cement concrete (1:3:6) with 40mm nominal size etc. completet including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. | ||||||
| 7Providing and laying plain cement concrete (1:4:8 ) with 40mm nominal size etc. complete including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. | ||||||
| 8Providing and laying plain cement concrete (1:2:4) with 12mm nominal size) etc. complete including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. | ||||||
| 9Providing and laying plain cement concrete (1:1.5:3) with 12mm nominal size) etc. complete including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. | ||||||
| 10Fly ash Brick masonry using bricks of size 25 cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix( 1:6) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Foundation & Plinth including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-Charge. | ||||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
DTCN.pdf
Tender Documents • 0.56 MB
BOQ_585874.xls
BOQ • 1.34 MB
Clarification_OM.pdf
Additional Documents • 2.26 MB
Download all tender documents and submit your bid