| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹41.7 LAdmitted-Finance | -37.00% | ₹41.7 L | L1 | Admitted-Finance |
| 2 | L2₹45.5 L+₹3.8 L (9.03%)Admitted-Finance | -31.31% | ₹45.5 L+₹3.8 L (9.03%) | L2 | Admitted-Finance |
| 3 | L3₹46.4 L+₹4.6 L (11.1%)Admitted-Finance | -30.00% | ₹46.4 L+₹4.6 L (11.1%) | L3 | Admitted-Finance |
| 4 | L4₹49.3 L+₹7.6 L (18.3%)Admitted-Finance AT BELTIKIRI SADAR DHENKANAL | -25.50% | ₹49.3 L+₹7.6 L (18.3%) | L4 | Admitted-Finance |
| 5 | L5₹50.0 L+₹8.3 L (19.8%)Admitted-Finance PL NO 5811288 LANE 5 PO AIRFIELD BBSR | BHUBANESWAR | ODISHA | -24.53% | ₹50.0 L+₹8.3 L (19.8%) | L5 | Admitted-Finance |
Tender Value
₹66.2 L
EMD Value
₹66,300
Closing Date
16 Jun 2026, 5:30 pmClosed
SE PRACHI
Office of the Superintending Engineer Prachi Division Bhubaneswar
BUILDING work
2026_CELBB_130083_13
SEPRD04/2026-27
Open Tender
Civil Works - Buildings
Percentage
BBSR
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹66,300
Yes
14 Aug 2026
2 Jun 2026
17 Jun 2026
2 Jun 2026
16 Jun 2026
2 Jun 2026
2 Jun 2026 - 16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 00"." | Dismantling & removing old lime cement plaster from wall including racking out joints 12mm deep and removing the debrices with all leads, lifts and delifts including all taxes, cess of materials and labour & T&P etc. complete as per direction of the Engineer-in-Charge. (Ground Floor) | 418.6 | One Sqm | 58.9 | ₹24,655.54 |
| 00"." | Dismantling & removing old lime cement plaster from wall including racking out joints 12mm deep and removing the debrices with all leads, lifts and delifts including all taxes, cess of materials and labour & T&P etc. complete as per direction of the Engineer-in-Charge. (First Floor) | 438.2 | One Sqm | 61.9 | ₹27,124.58 |
| 00"." | Dismantling & removing old lime cement plaster from wall including racking out joints 12mm deep and removing the debrices with all leads, lifts and delifts including all taxes, cess of materials and labour & T&P etc. complete as per direction of the Engineer-in-Charge. (Second Floor) | 431.28 | One Sqm | 65 | ₹28,033.2 |
| 00"." | 12mm thick Cement Plaster in cement mortar (1:4) over brick masonary to the smooth surface including watering, curing, cost,carriage royality, cess, taxes of all materials with all labour, T & P etc all complete as per direction of the Engineer-in-Charge. (Ground Floor) | 418.6 | One Sqm | 206.6 | ₹86,482.76 |
| 00"." | 12mm thick Cement Plaster in cement mortar (1:4) over brick masonary to the smooth surface including watering, curing, cost,carriage royality, cess, taxes of all materials with all labour, T & P etc all complete as per direction of the Engineer-in-Charge. (First Floor) | 438.2 | One Sqm | 211.3 | ₹92,591.66 |
| 00"." | 12mm thick Cement Plaster in cement mortar (1:4) over brick masonary to the smooth surface including watering, curing, cost,carriage royality, cess, taxes of all materials with all labour, T & P etc all complete as per direction of the Engineer-in-Charge. (Second Floor) | 619.64 | One Sqm | 216.2 | ₹1,33,966.17 |
| 00"." | Dismantling and removing 2.5Cm thick A.S. flooring including stacking the useful materials for re-use and removing the debrices with all leads, lifts and delifts with all taxes, cess of materials and labour & T&P etc. complete as per direction of the Engineer-in-Charge. (Ground Floor) | 143.01 | Per Sqm | 117.9 | ₹16,860.88 |
| 00"." | Dismantling and removing 2.5Cm thick A.S. flooring including stacking the useful materials for re-use and removing the debrices with all leads, lifts and delifts with all taxes, cess of materials and labour & T&P etc. complete as per direction of the Engineer-in-Charge. (First Floor) | 122.85 | Per Sqm | 123.8 | ₹15,208.83 |
| 00"." | Dismantling and removing 2.5Cm thick A.S. flooring including stacking the useful materials for re-use and removing the debrices with all leads, lifts and delifts with all taxes, cess of materials and labour & T&P etc. complete as per direction of the Engineer-in-Charge. (Second Floor) | 122.85 | Per Sqm | 129.9 | ₹15,958.22 |
| 00"." | Dismantling and removing old tiled flooring with removing the base course including stacking the useful materials for re-use and removing the debrices with all leads, lifts and delifts with all taxes, cess of materials and labour & T&P etc. complete as per direction of the Engineer-in-Charge. | 38.28 | Per Sqm | 154.7 | ₹5,921.92 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.16 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
DTCN0413.pdf
Tender Documents • 5.20 MB
BOQ_593227.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .