Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹17.8 LAccepted-AOC 4TH FLOOR 417 VIPUL BUSINESS PARK ROAD NO 02 SECTOR 48 GURUGRAM HARYANA PIN 122018 | GURUGRAM | GURUGRAM | HARYANA | 122018 | ₹17.8 L | L-1 | Accepted-AOC L-1 Bidder |
| 2 | Rejected-Technical CHANDRAPUR 442401 | CHANDRAPUR | CHANDRAPUR | MAHARASHTRA | 442401 | - | - | Rejected-Technical Concluded from BOQ as L-7 Bidder. |
| 3 | Rejected-Technical A 46 F F B SIDE MOLARBAND EXTENSION BADARPUR NEW DELHI 110 044 | NEW DELHI | SOUTH EAST DELHI | DELHI | 110044 | - | - | Rejected-Technical Concluded from BOQ as L-2 Bidder. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Concluded from BOQ as L-4 Bidder. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Concluded from BOQ as L-5 Bidder. |
Tender Value
₹27.6 L
EMD Value
₹34,500
Closing Date
11 Apr 2026, 5:00 pmClosed
Staff Officer (Civil), Chandrapur Area
Office of AGM, CHA
Repair and extension of compound wall at DRC-3 Filter plant and Health club of RSA of Chandrapur Area.
2026_WCL_357679_1
WCL_CHA_civil_eT-122
Open Tender
Civil Works - Others
90 days
RSA, Chandrapur Area
As per NIT
3 documents required · 3 mandatory
₹34,500
4 Jun 2026
31 Mar 2026
13 Apr 2026
31 Mar 2026
11 Apr 2026
1 Apr 2026
31 Mar 2026 - 4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.999 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | - | Cum | - | - |
| 0.999 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | Cum | - | - |
| 0.999 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - |
| 0.000 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | - | Cum | - | - |
| 0.999 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | - | - |
| 0.000 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg | - | - |
| 0.999 | Centering and shuttering including strutting, propping etc. and removal of form Foundations, footings, bases of columns, etc. for mass concrete. | - | Sqm | - | - |
| 0.000 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | Sqm | - | - |
| 0.999 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | - | Sqm | - | - |
| 0.000 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_370554.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.90 MB
BOQ_370554.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid