| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.4 LAccepted-Finance | L1 | Accepted-Finance As per financial evaluation | |
| 2 | L2₹43.1 L+₹2.8 L (6.85%)Accepted-Finance 26 ANIRUDHAWA KUSHINAGAR ANIRUDHAWA KUSHINAGAR UTTAR PRADESH 274403 | KUSHI NAGAR | UTTAR PRADESH | 274403 | L2 | Accepted-Finance As per financial evaluation | |
| 3 | L3₹45.7 L+₹5.4 L (13.3%)Accepted-Finance | L3 | Accepted-Finance As per financial evaluation | |
| 4 | Rejected-Technical | - | Rejected-Technical As per technical evaluation |
Tender Value
₹43.1 L
EMD Value
₹1.1 L
Closing Date
19 Dec 2023, 3:00 pmClosed
SA, ASI PATNA CIRCLE
JC Road Antaghat Panta-800001
as per tender document
2023_ASI_785159_1
W-5/Dec/Damaged Boundary Wall/2023/Antichak
Open Tender
Job Works
Works
90 days
Antichak
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
SA ASI
₹1.1 L
Yes
3 Jan 2024
13 Dec 2023
20 Dec 2023
14 Dec 2023
19 Dec 2023
14 Dec 2023
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured.
Dismantling barbed wire or concertina wire flexible wire rope in fencing including making rolls and stacking within 50 metres lead.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand)(70% new brick & 30% old brick will be used)
12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand)
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 meter open able length ( total length 90 m), having 50 nos rounds per 6 meter length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer- 1291 SUB HEAD : 16- ROAD WORK in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Providing and fixing angle iron Y shaped frames mild steel Angle sections of size 50 x 50 x 6 mm, and welded by angle and 9 No hole(Each shaped) including fixing, applying a priming coat of approved steel primer, all complete as per the direction of Engineer-In-charge.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars
Centering and shuttering including strutting, propping etc. and removal of form work for : Columns, Pillars, Piers, Abutments, Posts and Struts
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Provision for 25 cm dia piling as a foundation up to 3 meter including with all completed.
Provision for tractor trolly for removal of malba from site
Provision for Iron grill because the rain water will entered the boundary smoothly & rain water out the boundary.(Before Execution) Measurement will be done after work
Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm)
Provision For Casual labour after work completion cleaning the site at present condition
M/S DINESH SHUKLA
LAPANI PROGRESSIVE Pvt. Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .