Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 4 ARANMANAI RAMASAMY KOTHANAR WEST STREET RAMANATHAPURAM | RAMANATHAPURAM | TAMIL NADU | 623115 | Admitted-Finance |
| 2 | Admitted-Finance 97 1 YADHAVA STREET VELIPATTINAM RAMANATHAPURAM 523504 | 523504 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
Refer Docs
EMD Value
₹73,000
Closing Date
8 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector( Dev), RDDA,Ramanathapuram
District Rural Development Agency, Ramanathapuram
Rejuvenation of Water Bodies in Package No.TPL-1/AGAMT 2021-22 of Thiruppullani Block in Ramanathapuram District under AGAMT 2021-22
2022_RDTN_242230_1
R7/5593/2021/dated 05.07.2022 TPL-1
Open Tender
Civil Works
Item Rate
180 days
RDDA
Refer to Tender
6 documents required · 6 mandatory
₹0
₹73,000
District Rural Development Agency, Ramanathapuram
9 Sept 2022
18 Jul 2022
8 Aug 2022
18 Jul 2022
8 Aug 2022
20 Jul 2022
20 Jul 2022
90 days
Amount
Part I :Komboothi Habitation,Deepening of Ayyan Kovil Oorani,Strengthening bund with Construction of Retaining wall (17m),Bhathing Ghat in Kompoothi Panchayat
Oorani Earth work
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioni
Providing and fixing of Boundry Stone
Bhathing Ghat,Inlet and Retaining wall
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
Reinforcement Cement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Plain Cement concrete 1:2:4 using 20mm HBG jelly
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part II :Regunathapuram Habitation,Deepening of Nadumanaitheru Sudukattu Oorani,Strengthening bund with Constuction of Bhathing Ghat and Inlet
Oorani Earth work
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioni
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of Boundry Stone
Bhathing Ghat,Inlet and Retaining wall
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
Reinforcement Cement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Plain Cement concrete 1:2:4 using 20mm HBG jelly
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part III :Pandiyan Nagar Habitation,Deepening of Paraiyar Oorani,Strengthening bund with Constuction of Bhathing Ghat and Inlet
Oorani Earth work
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioni
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of Boundry Stone
Bhathing Ghat,Inlet and Retaining wall
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
Reinforcement Cement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Plain Cement concrete 1:2:4 using 20mm HBG jelly
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part IV :Pudhur Habitation,Deepening of Panduvetti Oorani,Strengthening bund with Constuction of Bhathing Ghat and Inlet
Oorani Earth work
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioni
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of Boundry Stone
Bhathing Ghat,Inlet and Retaining wall
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
Reinforcement Cement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Plain Cement concrete 1:2:4 using 20mm HBG jelly
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part V :Nehrupuram Habitation,Deepening of Periyakallupatti Oorani,Strengthening bund with Constuction of Bhathing Ghat and Inlet
Oorani Earth work
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioni
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of Boundry Stone
Bhathing Ghat,Inlet and Retaining wall
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
Reinforcement Cement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Plain Cement concrete 1:2:4 using 20mm HBG jelly
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part VI :Kuppavalasai Habitation,Deepening of Kuppavalasai Oorani,Strengthening bund with Constuction of Bhathing Ghat and Inlet
Oorani Earth work
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioni
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of Boundry Stone
Bhathing Ghat,Inlet and Retaining wall
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
Reinforcement Cement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Plain Cement concrete 1:2:4 using 20mm HBG jelly
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part VII :Anjaneyarpuram Habitation,Deepening of Sakku Oorani,Strengthening bund with Constuction of Bhathing Ghat and Inlet
Oorani Earth work
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioni
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of Boundry Stone
Bhathing Ghat,Inlet and Retaining wall
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
Reinforcement Cement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Plain Cement concrete 1:2:4 using 20mm HBG jelly
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part VIII :Kanjirangudi Habitation,Deepening of Ayyanar Kovil(West) Oorani,Strengthening bund with Constuction of Bhathing Ghat and Inlet
Oorani Earth work
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioni
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of Boundry Stone
Bhathing Ghat,Inlet and Retaining wall
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
Reinforcement Cement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Plain Cement concrete 1:2:4 using 20mm HBG jelly
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
Part IX :Kasthuripuram Habitation,Deepening of Apparently (Appa) Oorani,Strengthening bund with Constuction of Bhathing Ghat and Inlet
Oorani Earth work
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioni
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of Boundry Stone
Bhathing Ghat,Inlet and Retaining wall
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay stiff block cotton hard red earth shales murrams, gravel stoney earth , earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20 B SI 61 per specification
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Cement concrete 1:3:6 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc
Supplying and fabrication,placing in position ofmild steelTor steel grils for RCC worksinculding cost of steel and binding wire etc.
Reinforcement Cement concrete 1:1.5:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc
Plain Cement concrete 1:2:4 using 20mm HBG jelly
Providing and laying reinforced cement concrete pipe NP3 900mm for culverts on first class bedding of Granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, back filling, concrete and masonry works in head walls and parapets clause 1106
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VENKATESWARA CONSTRUCITON
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .