| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 CrAccepted-AOC | ₹6.4 Cr | L1 | Accepted-AOC PROPER |
Tender Value
₹6.5 Cr
EMD Value
₹13.0 L
Closing Date
20 May 2020, 2:00 pmClosed
Chief Engineer,W.R.Deptt
O/O Chief Engineer Water Resources Department Chandmari
Restoration and recoupment of breached like damages of road cum bund by flooding of river Brahmaputra at Nichinpur area under SOPD (FDR).
2020_DoWR_16262_2
DHUBRI/2019-20/SOPD-FDR/IV
Open Tender
Civil Works
Works
120 days
DHUBRI
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
The Executive Engineer, Dhubri W R Division
₹13.0 L
Yes
10 Jun 2020
13 May 2020
21 May 2020
13 May 2020
20 May 2020
14 May 2020
Amount
Light Jungles: Clearing light jungles and trees upto 15 cm. girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as directed. ( When 30% of the area is covered by shrubs,trees etc).
Earth work in embankment by truck carriage in ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 22cm. thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 2.5cm cube, dressing as per design section including payment of forest royalty if any, etc. complete as directed. (10% deduction will be made from the section measured quantities of the completed and compacted on account of shrinkage). For initial lead beyond 1/2 km and upto 4km and for all lifts.
Compacting Original Ground: (i) Compacting original ground supporting embankment Lossening, Levelling, and compacting original ground supporting embankment to facilitate placement of first layer of embankment , scarified to a depth of 150mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in tables 300.1 and 300.2 for embankment construction as per technical specification clause 301.4.1.
Labour for ramming with cast iron rammer to proper compaction including watering if necessary , etc. complete as directed. Ordinary soil.
Turfing with grass sods of largest possible rectangles of 12 cm. minimum thickness placed closely including dressing earth pagging with Jati bamboo split, watering till the grass grows for a lead up to 90m and all lifts.
Earth work in embankment by truck carriage in ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and stacking in regular measurable stacks at suitable places including clearing and levelling the stacking site, breaking clods up to 2.5cm cube, payment of forest royalty if any, etc. ( 12.50 % deduction will be made from measured quantities on account of shrinkage). For initial lead beyond 1/2 km and upto 4 km and for all lifts.
Spreading of earth stacks over the crest and slope of embankment and places as directed in uniform layer of 22 cm. thick including breaking clods, dressing, ramming etc. complete where necessary including dressing the embankment. before complete as directed.
Collection and supply of sand gravel containing 60% sand and 40%gravel free from disintegrated and flaky pieces of vegetation and other deleterious matters, adherent coating etc. including stacking in suitable stacks at Quarry/Site and payment of forest royalty etc. complete as directed.
Labour charge for laying of soling stone, brick bats, broken stone metal, sand gravel etc. on approach road including ramming dressing the seat and local carriage of materials up to a distance of 60 m complete as directed.
Earthwork in bank trimming to the designed section /slope including removing the soils at a safe distance, complete as directed.
Supply of Pre stressed Cement Concrete (PSC) Porcupine members of size 0.10m X 0.10mX 3.00m with M-40 grade of cement concrete with graded broken course aggregates up to 12mm size down and reinforced with 4 Nos. of 4 mm dia high tensile steel wire cable at four corners with necessary cover and 4mm high tensile stirrups at 250mm C/C, in conformity with IS-6403 and stressed to required strength not exceeding 9.18 N/mm, holes of 16 mm dia at 50 cm inside from both ends in the same face and in either face of post another 2 Nos. of holes of size 16 mm dia at 65mm inside from both ends including properly curing for 14 (fourteen) days and carriage of porcupine members from factory to the stack yard within a distance up to 100 Km complete as directed.
Labour charge for launching of R.C.C. / PSC Porcupine including carriage of R.C.C./ PSC porcupine members of size 0.10m × 0.10m × 3.00m from the stack yard to the place of launching ,erection of the Porcupine with 6 (six) members properly, supply & fitting/fixing with 12 mm dia 25 Cm long M.S. Nuts and bolts and launching the porcupine properly as directed. (Lead up to 150 m). a)Launching without boat
Labour charge for launching of R.C.C. / PSC Porcupine including carriage of R.C.C./ PSC porcupine members of size 0.10m × 0.10m × 3.00m from the stack yard to the place of launching ,erection of the Porcupine with 6 (six) members properly, supply & fitting/fixing with 12 mm dia 25 Cm long M.S. Nuts and bolts and launching the porcupine properly as directed. (Lead up to 150 m). b)Launching by boat:
Construction of whole Bholuka Bamboo Screen with matured Bholuka Bamboo stacks 75mm to 100mm dia, placed at 30 cm clear apart( i.e. 40 cm C/C) driven 4.00 m to 4.50m below ground and 3.0m to 3.50m above ground with hydraulic driving equipments including hire charge of equipment, cost of P.O.L. etc. and providing with 1 (one) row of horizontal half Jati bamboo kamies tied with galvanized wire of 16 G to 18 G etc complete as directed.(Using Bhaluka Bamboo at the rate of 240.00 nos/ Rm & Jati Bamboo at the rate of 9.60 nos / Rm).
Construction of whole bamboo single pallasiding with matured jati bamboo stacks 7.5cm to 100 mm dia.,15 cm clear apart 1.20m to 1.80m above ground and 1.00m to 1.20m below ground with jati bamboo inclined struts fixed 1.2m to 1.5m apart tied with three rows of horizontal half jati bamboo kamies with cane/ wire of 16G to 18G etc. complete as directed. (Using Bhaluka Bamboo at the rate of 8.67 nos/ Rm & Jati Bamboo at the rate of 2.40 nos / Rm).
Supply of serviceable empty cement bags
Labour charge for laying and pitching earth filled cement bags including excavation and borrowing earth, breaking clods, filling in bags and supplying and stitching the mouth with jute sutli, etc. complete as directed. (cement bags will be supplied by the department free of cost). For borrowing earth from a distance up to 30m.
Construction of temporrary shed of two roof with mud plinth of 0.45 m height above ground level with Bhaluka bamboo post 1.5 m apart driven at atleast 0.75 m below ground and height above plint 2.5m. Split Jatti bamboo wall mud plastering white washing 2 coats, 10 cm thick touch roofing over bamboo rua frame placing at 0.15 m clear apart fitted with bamboo kamies from binding doors and windows with Bamboo Chattai strengthening with Bamboo frame binding with wire etc compple as directed. (Using Bhaluka Bamboo at the rate of 6.00 nos/ Rm & Jati Bamboo at the rate of 61.00nos / Rm).
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .