| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.2 LAccepted-AOC | ₹31.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹32.8 LRejected-Finance | ₹32.8 L | L2 | Rejected-Finance Rejected
High Rate Rejected |
| Sl No | Description | Qty | Unit | SUSAI MANICKAM CONTRACTOR L2 | JESUS AUGUSTINE AROCKIAM L1 |
|---|---|---|---|---|---|
| 1.00Part 1 : Construction of Compound Wall at Thampithottam High school in Gandhigramam H/O Gandhigramam Estimate Amount : Rs. 31.50 lakhs | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation As Per SS20 B | 180.85 | cum | 277 ₹50,095.45 | 263.75 ₹47,699.19 |
| 3.00 | Supplying and filling in foundation and basement and trenches with FILLING M.SAND in layers of not more than 15cm thick, well watered,rammed and consolidated complying with standard specification etc.,complete. | 10.8 | cum | 2,000 ₹21,600 | 1,907.1 ₹20,596.68 |
| 4.00 | CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. | 19.75 | cum | 5,870 ₹1.2 L | 5,594.6 ₹1.1 L |
| 5.00 | REINFORCED CEMENT CONCRETE 1:1.5:3 mix using 20mm machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work excluding cenetering, shuttering and cost of reinforcement grills placed in posit | 51.24 | cum | 9,800 ₹5.0 L | 9,349.6 ₹4.8 L |
| 6.00 | Supplying & Erecting centering for sides & soffits including necessary supports & strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | 334.73 | sqm | 575 ₹1.9 L | 547.4 ₹1.8 L |
| 7.00 | Column | 149.04 | sqm | 1,150 ₹1.7 L | 1,095 ₹1.6 L |
| 8.00 | Supplying, fabricating and placing in position mild steel/Ribbed tor steel rods for all RCC works including cost of steel and binding wire also in all floors, complete complying with standard specfication. | 5.01 | mt | 96,580 ₹4.8 L | 91,982.48 ₹4.6 L |
| 9.00 | Brick work in CM 1:5 mix using country bricks ground molded of size 23 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. | 100.93 | cum | 6,400 ₹6.5 L | 6,111.5 ₹6.2 L |
| 10.00 | PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications. | 1,025.2 | sqm | 300 ₹3.1 L | 285.3 ₹2.9 L |
Tender Value
₹31.5 L
EMD Value
₹32,000
Closing Date
17 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER BP ATHOOR
BLOCK DEVELOPMENT OFFICER BP ATHOOR
Construction of Compound Wall at Thampithottam High school in Gandhigramam HO Gandhigramam 111 ATHOOR
2026_RDTN_656819_1
TN 05 111 GANDHIGRAMAM SCHOOL COMPOUND WALL ATHOOR
Open Tender
Civil Works - Buildings
180 days
BLOCK DEVELOPMENT OFFICER BP ATHOOR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹32,000
Yes
BLOCK DEVELOPMENT OFFICER BP ATHOOR
8 Jun 2026
13 Feb 2026
17 Feb 2026
13 Feb 2026
17 Feb 2026
13 Feb 2026
13 Feb 2026
Part 1 : Construction of Compound Wall at Thampithottam High school in Gandhigramam H/O Gandhigramam Estimate Amount : Rs. 31.50 lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation As Per SS20 B
Supplying and filling in foundation and basement and trenches with FILLING M.SAND in layers of not more than 15cm thick, well watered,rammed and consolidated complying with standard specification etc.,complete.
CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification.
REINFORCED CEMENT CONCRETE 1:1.5:3 mix using 20mm machine crushed 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work excluding cenetering, shuttering and cost of reinforcement grills placed in posit
Supplying & Erecting centering for sides & soffits including necessary supports & strutting up to 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Column
Supplying, fabricating and placing in position mild steel/Ribbed tor steel rods for all RCC works including cost of steel and binding wire also in all floors, complete complying with standard specfication.
Brick work in CM 1:5 mix using country bricks ground molded of size 23 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
PLASTERING with cement mortar 1:5 (one cement and five sand)12mm thick in all floors complying with standard specifications.
Painting two coats with rady mixed Plastic emulsion of First class quality paint and of approved colour over a priming coat by the departmental officers including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 1.66 MB
BOQ_787656.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid