| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.7 LAccepted-AOC | ₹35.7 L | L1 | Accepted-AOC As directed by CWC, Contract Agreement is placed on the L1 contractor, M/s. Siva Enterprises Chennai, at their total quoted amount of Rs. 35,66,915 /- for the subject work. |
| 2 | L2₹37.2 L+₹1.5 L (4.20%)Rejected-Finance | ₹37.2 L+₹1.5 L (4.20%) | L2 | Rejected-Finance L2 Contractor. Being L2 Contractor, Not Accepted by CWC. |
| 3 | L3₹42.3 L+₹6.7 L (18.7%)Rejected-Finance | ₹42.3 L+₹6.7 L (18.7%) | L3 | Rejected-Finance L3 Contractor. Being L3 Contractor, Not Accepted by CWC. |
| Sl No | Description | Qty | Unit | G SUNIL KUMAR CONTRACTOR L2 | Siva Enterprises L1 | BRIDGE AND ROADS L3 |
|---|---|---|---|---|---|---|
| 1.00 | (i) Material and Labour for surface preparation by removing all unsound concrete by chipping on all affected areas till reinforcement bars are exposed and sound concrete is achived. (ii) The exposed reinforcement bars to be cleaned throughly with wire brush with a bright state. (iii) Application of rust remover to remove the complete corrossion from the reinforcement. (iv) Applying zinc rich based anti corrosive coating by brush on rebars and also spinkle sharp silica sand after application just when it is tacky including new rebars with anchoring / welding /binding. (v) Applying bond coat between new and old concrete for affective bonding with SPR Lated Modified cementitious bond coat over the exposed reinforcement in ratio1:1to 1:1.5of polymer and cement. (vi) Applying polymer modified fibre reinforced thixotropic repair mortar of thickness15mm. (vii) Applying cement plaster mixing with SPR@500ML per bag of cement will be plastered in CM1:4 in ceilling/beams/columns etc., (viii) Applying water based curing compound by brush or by roller for better curing. | 1,000 | SQM | 3,520 ₹35,20,000 | 3,355 ₹33,55,000 Lowest | 3,950 ₹39,50,000 |
| 2.00 | M & L for R.C.C A1 Type, 1: 1.5: 3 M20, 20mm graded aggregate in Slabs supported on walls,beams and columns in floors,roofs, landings, balconies,canopies, deck slabs and in shelves and the like.etc.complete all as directed by EIC. | 3 | CUM | 7,000 ₹21,000 Lowest | 7,955 ₹23,865 | 7,400 ₹22,200 |
| 3.00 | M & L for form work to side of RCC Member such as columns, pillars, roof beam and roof slab etc., and the finishing shall be of fair finished surface of square rectangularor polygonal . | 80 | SQM | 650 ₹52,000 | 545 ₹43,600 | 540 ₹43,200 Lowest |
| 4.00 | Supply and fixing of mild steel 10mm Dia and over cut to length, bent to shape required, reinforcement deformed or twisted bars including bending, cranking, hooking and tieing with mild steel wire not less than 0.90mm dia. (Make : RINL-VIZAG Steel/SAIL/TATA-TISCON/"BIS"MARKED, Primary Manufacturer ) or Suitably Equivalent Make. | 400 | KG | 110 ₹44,000 | 95 ₹38,000 | 94 ₹37,600 Lowest |
| 5.00 | M & L for plastering in CM 1:4, 15mm thick on fair faces of brick work and concrete surfaces. | 80 | SQM | 60 ₹4,800 Lowest | 315 ₹25,200 | 250 ₹20,000 |
| 6.00 | M&L for applying two coats of white washing on ceilling fair faced brick/concrete surfaces including preparation old ceilling surfaces completeall as directed | 1,000 | SQM | 20 ₹20,000 Lowest | 25 ₹25,000 | 80 ₹80,000 |
| 7.00 | M&L for applying 3mm thick wall care putty on wall(make shall be of JK white care putty or Birla White wall care putty) or Suitably Equivalent make. | 450 | SQM | 80 ₹36,000 Lowest | 95 ₹42,750 | 85 ₹38,250 |
| 8.00 | M&L for applying two coats of oil bound distember on internal wall surfaces including preparaition of old wall surfaces complete all as directed. (Make: Asian/Berger/Nerolac ) or suitably equivalent make | 300 | SQM | 63 ₹18,900 | 45 ₹13,500 Lowest | 145 ₹43,500 |
Tender Value
₹44.9 L
EMD Value
₹90,000
Closing Date
23 Jun 2026, 2:00 pmClosed
THE CHIEF GENERAL MANAGER
THE CGM, FMU - HVF, AVADI, CHENNAI - 54
REPAIRS TO DAMAGED CEILING SURFACES IN TYPE - III QUARTERS AT HVF ESTATE
2026_AVNL_280139_1
HVF/TE/13025/CEO/2026-27/28
Open Tender
Civil Works
Works
365 days
HVF ESTATE, AVADI
DETAILS ENCLOSED
8 documents required · 8 mandatory
₹0
₹90,000
21 Jul 2026
8 Jun 2026
24 Jun 2026
8 Jun 2026
23 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (i) Material and Labour for surface preparation by removing all unsound concrete by chipping on all affected areas till reinforcement bars are exposed and sound concrete is achived. (ii) The exposed reinforcement bars to be cleaned throughly with wire brush with a bright state. (iii) Application of rust remover to remove the complete corrossion from the reinforcement. (iv) Applying zinc rich based anti corrosive coating by brush on rebars and also spinkle sharp silica sand after application just when it is tacky including new rebars with anchoring / welding /binding. (v) Applying bond coat between new and old concrete for affective bonding with SPR Lated Modified cementitious bond coat over the exposed reinforcement in ratio1:1to 1:1.5of polymer and cement. (vi) Applying polymer modified fibre reinforced thixotropic repair mortar of thickness15mm. (vii) Applying cement plaster mixing with SPR@500ML per bag of cement will be plastered in CM1:4 in ceilling/beams/columns etc., (viii) Applying water based curing compound by brush or by roller for better curing. | 1,000 | SQM | 4,255 | ₹42,55,000 |
| 2 | M & L for R.C.C A1 Type, 1: 1.5: 3 M20, 20mm graded aggregate in Slabs supported on walls,beams and columns in floors,roofs, landings, balconies,canopies, deck slabs and in shelves and the like.etc.complete all as directed by EIC. | 3 | CUM | 7,851.47 | ₹23,554.41 |
| 3 | M & L for form work to side of RCC Member such as columns, pillars, roof beam and roof slab etc., and the finishing shall be of fair finished surface of square rectangularor polygonal . | 80 | SQM | 746.32 | ₹59,705.6 |
| 4 | Supply and fixing of mild steel 10mm Dia and over cut to length, bent to shape required, reinforcement deformed or twisted bars including bending, cranking, hooking and tieing with mild steel wire not less than 0.90mm dia. (Make : RINL-VIZAG Steel/SAIL/TATA-TISCON/"BIS"MARKED, Primary Manufacturer ) or Suitably Equivalent Make. | 400 | KG | 90.06 | ₹36,024 |
| 5 | M & L for plastering in CM 1:4, 15mm thick on fair faces of brick work and concrete surfaces. | 80 | SQM | 289.43 | ₹23,154.4 |
| 6 | M&L for applying two coats of white washing on ceilling fair faced brick/concrete surfaces including preparation old ceilling surfaces completeall as directed | 1,000 | SQM | 24.42 | ₹24,420 |
| 7 | M&L for applying 3mm thick wall care putty on wall(make shall be of JK white care putty or Birla White wall care putty) or Suitably Equivalent make. | 450 | SQM | 91.78 | ₹41,301 |
| 8 | M&L for applying two coats of oil bound distember on internal wall surfaces including preparaition of old wall surfaces complete all as directed. (Make: Asian/Berger/Nerolac ) or suitably equivalent make | 300 | SQM | 75.02 | ₹22,506 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_326938.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .