| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 LAccepted-AOC 205 PARSHAV VIHAR PLOT NO 50 IP EXTN PARPARGANJ DELHI 110092 | EAST | DELHI | 110092 | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹24.3 L+₹25,160 (1.05%)Rejected-AOC PLOT NO 470 PACE CITY II SECTOR 37 GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | L2 | Rejected-AOC REJECTED |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
7 Apr 2022, 6:00 pmClosed
CWE(AF) Tughlakbad
HQ Commander Works Engineers Air Force, Tughlakabad PO Sangam Vihar New Delhi 110 080
SPL REPAIR FOR REPLACEMENT OF AHU OF AC PLANTS AGAINST BER AT ASP UNDER GE(AF) (P) GURGAON
2022_MES_513059_1
85177/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE (P) AF Gurgaon
As per Tender Documents
7 documents required · 7 mandatory
₹500
GE(AF) (P) GURGAON
₹50,000
Yes
22 Apr 2022
10 Mar 2022
9 Apr 2022
10 Mar 2022
7 Apr 2022
24 Mar 2022
Amount
Dismantling floor mounted double skin type air handling units of minimum air moving capacity 15000 CFM, removing from site and depositing in MES store yard , complete all as specified and directed by Engineer-in-Charge. Note- This item includes the rate for refitting of the 2 row deep heating coil in the new AHU. During extraction of 2 row deep heating from old AHU and refitting in the new AHU in item No-3, any extra cost due to damage/repair to the heating coil will be borne by the contractor.
Dismantling floor mounted double skin type air handling units of minimum air moving capacity 13500 CFM, removing from site and depositing in MES store yard , complete all as specified and directed by Engineer-in-Charge. Note- Heating coil should be dismantled in such a way that no damage occur to the coil and refitted in the new AHU.
Cont from Item no. 2.00 here in Above NOTE:- This item includes the rate for refitting of the 2 row deep heating coil in the new AHU. During extraction of 2 row deep heating from old AHU and refitting in the new AHU in the item No-4, any extra cost due to damage/repair to the heating coil will be borne by the contractor.
Supply, installation, testing and commissioning of factory built floor mounted double skin type air handling units of minimum air moving capacity 15000 CFM made of 25mm thick panels consisting of pre plasticized GI casing of thickness not less than 0.60 mm outside and 0.6 mm thick (minimum) GI sheet inside layer with CFC-FREE P.U insulation of density 42(±5%) kilogram per cubic metre factory injected between them by injection moulding machine, complete with DIDW forward curved fan of 50 mm WG static pressure with TEFC sq. cage induction motor and belt drives. The unit shall consist 6 rows deep cooling coil and should have arrangement of space for refitting of 2 row deep heating coil obtained from item No- 1 as per requirements with aluminium finned (12FPI) copper tubes (tube thickness not less than 0.41mm), filter sections with 50mm thick washable synthetic type pre filters having efficiency 90% down to 10 micron, drain connections with drain valve, insulated stainless steel, plenum drain pan, necessary vibration isolation arrangement, flexible duct connector, for efficient operation of system., complete all as specified and directed by Engineer-in-Charge. Make : Carrier/Voltas/Bluestar/National/Zeco/ Edgetech. Note- Any modification to the pipe line, inlet/outlet duct, ceiling structure or B&R work and foundation of plinth includes in this item. Before placing the order, the contractor should ensure that extracted 2 row deep heating coil from Srl item No- 1 can be fitted in the new AHU. Before placing the order, the drawing should be approved by the Engineer-in-Charge and Garrison Engineer.
Supply, installation, testing and commissioning of factory built floor mounted double skin type air handling units of minimum air moving capacity 13500 CFM made of 25mm thick panels consisting of pre plasticized GI casing of thickness not less than 0.60 mm outside and 0.6 mm thick (minimum) GI sheet inside layer with CFC-FREE P.U insulation of density 42(±5%) kilogram per cubic metre factory injected between them by injection moulding machine, complete with DIDW forward curved fan of 50 mm WG static pressure with TEFC sq. cage induction motor and belt drives. The unit shall consist 6 rows deep cooling coil and 2 row deep heating coil as per requirements with aluminium finned (12FPI) copper tubes (tube thickness not less than 0.41mm), filter sections with 50mm thick washable synthetic type pre filters having efficiency 90% down to 10 micron, drain connections with drain valve, insulated stainless steel, plenum drain pan, necessary vibration isolation arrangement, flexible duct connector, for efficient operation of system., complete all as specified and directed by Engineer-in-Charge. Make : Carrier/Voltas/Bluestar/National/Zeco. Note- Any modification to the pipe line, inlet/outlet duct, ceiling structure or B&R work and foundation of plinth includes in this item. Before placing the order, the contractor should ensure that extracted 2 row deep heating coil from Srl item No- 2 can be fitted in the new AHU. Before placing the order, the drawing should be approved by the Engineer-in-Charge and Garrison Engineer.
ANEMO PRIME PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .